Legionella Risk Assessment
Download
Report
Transcript Legionella Risk Assessment
Legionella Risk Assessment
Mike Rose
Legionella Risk Assessment
Identification and evaluation of sources of potential risk
Means by which exposure is to be prevented
Means by which exposure is to be controlled
Fundamental to the development of an effective management
system
Must be suitable and sufficient
What constitutes suitable and sufficient?
Legionella Risk Assessment
Legionnaires’ disease The control of legionella bacteria in water
systems ACoP and Guidance (L8)
–
–
–
–
Very limited in detail relating to risk assessment content
No clear level of expectation for clients
Variability in risk assessment quality
Increased risk of Legionnaires’ disease
Outbreaks of Legionnaires’ disease are often associated with
inadequate risk assessment
BS 8580:2010 Code of Practice
BS 8580:2010 Water quality - Risk Assessment for Legionella
Control, Code of Practice
Factors to be considered in the risk assessment
–
–
–
–
–
Contamination
Amplification
Transmission
Exposure
Host Susceptibility
Preparations for risk assessment
– Competence of risk assessor
– Agreeing terms of reference
– Independence.
BS 8580:2010 Code of Practice
Desktop appraisal of documentation
–
–
–
–
–
Previous risk assessment
Current scheme of control
Maintenance and testing records
Action log
Management responsibilities
Site visit/survey
–
–
–
–
Review of schematics
Visual inspection
Measurements
Sampling?
BS 8580:2010 Code of Practice
Risk assessment reporting
–
–
–
–
–
Clear and concise
Formal document
Clear identification of hazard
Clear recommendations
Timescales
Risk review
Key Points from BS 8580:2010
A clearly defined process for risk assessment
Competency of the assessor
Independence
- Impartiality
- Integrity
BS 8580:2010
Provides clear levels of expectation for:
- Clients
- Providers
- Enforcement
Raise quality standards
Reduce incidences of Legionnaires’ disease
UKAS accreditation.
Management Scheme
An appropriate management scheme will include:
Responsibility list
Parameters of the system to be maintained ie. temperatures, flow
rates, biocide levels etc…
Testing and inspection schedule
Testing and inspection procedures
Testing and inspection results
Details of actions to take with out of specification results
Training certification
Management System Auditing
Don’t assume that the system is being followed
Bulmers Cider outbreak 2003 (26 cases and 2 deaths)
Responsible person
Independent third party
Areas of focus
Completion of monitoring/inspection tasks
Out of specification results
Supporting certification eg. Legionella tests
Verification of results by inspection
Summary
Safe working environment
Ensure water is fit for purpose
Minimise downtime
Avoid prosecution