The 2012 Revision of the Common Twinning Manual

Download Report

Transcript The 2012 Revision of the Common Twinning Manual

The 2012 Revision of the
Common Twinning Manual
Institution Building Days
DG Enlargement – DG DEVCO EuropeAid
Brussels,7 June 2012
Introduction
• Why?
• Periodical revision of the Twinning rules
• Evaluation TA vs. Twinning (2010) ELARG
• First Evaluation of the Institutional Twinning Instrument
with the ENP countries (2011) DEVCO
• How?
• Shorter gap between programming and implementation
• More flexibility = more responsibility for twinners
• NB: Some of the changes only for IPA projects
Applicability
The Twinning Manual 2012 is applicable to all
projects for which the notification of selection has
been sent on or after 2 April 2012
Shortening the gap - I
• Selection meeting 2 weeks after the deadline for
submission of proposals.
• Tight deadlines for Beneficiaries and EUD to
decide on proposals and inform MS: selection
within 3 weeks of selection meeting,
communication with no delay.
• If deadline not met, MS can notify that it is no
longer bound by its proposal and Twinning Fiche
may be re-circulated.
Shortening the gap - II
• "Selection under ENPI" – Notification of Results:
The CA specify in the letter possible dates for the
first preparatory mission in the BC within the
next two weeks.
• Reduction from 6 months to 4 (IPA) or 5 (ENPI)
for the negotiation of the contract (but same
reimbursable preparation costs).
Increasing flexibility
• Side letters for budgetary changes also after the
“15% addendum”
• No addenda for suspension or termination
• No request for first pre-financing
• Under IPA, Operative Side Letters detail the work
plan and the budget, which in the contract are in
an abridged form
Increasing public character
• Project Leader more involved in the steering of
the project
• Junior Project Leader attends Project Steering
Committees
• Clarification of RTA role and assignments
• Clarification of competences of ad hoc mandated
bodies
Other significant changes
•
•
•
•
Support to visibility events
Consolidation of official notes and guidelines
Alignement to the PRAG 2012
Text consistency
Project Leaders responsibility
• Under IPA: Operative Side Letters require deeper
involvement of the Lead Project Leader
• Junior Project Leader can attend Project Steering
Committees – growing number of consortia
Resident Twinning Adviser
• Twinning project cannot run without RTA.
• Avoid professionalization of RTA – secure link
with the MS Public Administration – mark a
difference with consultants
• Limit to assignments (max 4):
•
•
•
•
Not more that 3 years in same Beneficiary
Not more than 2 projects in same region
For 3rd project at least 6 uninterrupted months in MS
For 4th project at least 3 uninterrupted years in MS
Mandated Bodies
• Mandated bodies are semi-public bodies that
must satisfy the following criteria:
1.
2.
3.
4.
Proven competence in a field of the EU Acquis
Non-profit structure, non-commercial purpose
Public ownership
Under the permanent and structural supervision
of a government authority
5. A sufficient and proportionate level of permanent
staff
• In case criteria 2 and 3 are partially fulfilled,
restricted mandated body status can be granted.
Special case: ad hoc mandated body
• Ad hoc mandated bodies (do not fulfil one or
more criteria other than 2 or 3) can provide only
a "small, very specialised contribution to a
Twinning project".
• Therefore staff of ad hoc mandated bodies cannot
perform any key role in the project (Project
Leader or RTA).
Increased importance of visibility
• Opening and closure events are seen as visibility
events
• In exceptional cases up to 500 € can be foreseen
for small catering during those events
• Visibility important not only for the success of a
project, also for its sustainability
Consolidation of official notes and
guidelines
• Update of Twinning Review Missions procedures
• Inclusion of Fact Finding Missions guidelines
• Universities and academic institutions are not
seen as practitioners of Public Administrations,
therefore can apply only for ad hoc (letter EC to
NCP of 2006).
Main change under IPA
• Details of WP and Budget outside of contract
• Operative Side Letters – First one with contract,
following every 6 months (Project Steering
Committee)
• PL cannot delegate signature OSL
• CA must have at least five days to evaluate a
draft OSL
• No comment allows for implementation as of
sixth working day
Thank you for your attention
Twinning Coordination Team – DG ELARG
Paolo Gozzi (Team leader)
Jordi Rodríguez Ruiz
Marc Patuzzo
Birgit Persson
Elarg Twinning Mail: [email protected]
Twinning Coordination Team – DG DEVCO
Christophe Ingels (Team leader)
Joanna Jablonska (Eastern Partnership)
Lucia Santuccione (Middle East)
María del Mar Roca (Northern Africa)
Devco Twinning Mail: [email protected]