`LEWP Matrix` + `3-scenario document`

Download Report

Transcript `LEWP Matrix` + `3-scenario document`

LEWP-RCEG Dublin April 2013

Hans Borgonjen

Platforms / Agenda

LEWP - RCEG

(Law Enforcement Working Party – Radio Communication Expert Group)

- Forerunner Group

‘LEWP Matrix’ + ‘3-scenario document’

CEPT-PT49

Frequency allocation studies

European Commission RSPP text

TCCA - CCBG

(Tetra & Critical Communication Association)

(

Critical Communication Broadband Group)

- CCBG user+operator requirement group: ‘umbrella document’ ‘Time line’

(Roadmap)

‘Strategic Case’

(Business Case)

LEWP user requirement matrix high speed data

• Known as the

“LEWP Matrix”

• Use it for your internal discussions • Basis for CEPT PT49 • Basis for ETSI for technology discussion - ETSI adds detailed figures -

CEPT PT49 uses this ETSI figures

- Now also

‘ETSI frequency calculation tool’

(LEWP-ETSI Matrix)

PublicSafety highspeed user requirements

timeliness Type of application + services throughput p/s per session use per month per user Number of users mobility (using while moving) quality of experience (can there be a hiccup in the connection) Availability/ start-up time continuous operational availability (mission critical level)

LOCATION DATA

A(V)LS data to CCC A(V)LS data return

MULTI MEDIA

low medium high high high medium high high medium medium ready ready high high high high Video from/to CCC for following + intervention high low medium high low ready when vehicle is ready medium low medium high Video for fixed observation Video on location (disaster or event area) Video conferencing operations medium (high on hdd) high high low medium low low low low low low low low medium low Take along on ad hoc basis medium low medium medium high; availability at Golden Hour essential low

Type of application + services throughput p/s per session use per month per user Number of users mobility (using while moving) quality of experience (can there be a hiccup in the connection) Availability/ start-up time timeliness continuous operational availability (mission critical level)

Photo broadcast Photo to select group

OFFICE APPLICATIONS

PDA PIMsync Mobile workspace + (incl public internet) medium medium medium medium low low high medium medium low low low high high high high low low low low ready ready ready ready low low low low medium medium low low

DOWNLOAD OPERATIONAL INFORMATION

Incident information download (text + images) from CCC to fieldunits + Netcentric working medium low medium low high ready medium high

LEWP-RCEG meeting 24 october

Letter LEWP to ECC, CEPT-FM, PT49

-

Many references to earlier documents

-

Stating the importance of PT49

-

Offer to continue to cooperate

-

Stating the earlier LEWP inputs

(Matrix + 3-scenario document)

RSPP

Radio Spectrum Policy Program

RSPP Art. 8(3), Quote

<

shall

, in cooperation with the Member States

seek to ensure

that sufficient spectrum is made available

under harmonised conditions

to support the development of safety services and the

free circulation

of related devices as well as the development of innovative interoperable solutions for public safety and protection, civil protection and disaster relief.>>

CCBG

• • • There is a TCCA-CCBG Roadmap

See presentation Emmanuelle

There is an “umbrella document” with all user requirements + system requirements

Based on all kind of existing URS’s

There is a discussion on architecture: what in the LTE core + what in an “upper application layer”

Presentation on behalf of the TETRA + Critical Communications Association

1.

2.

3.

4.

Event Calendar

PT49: 25+26 April Paris 13+14 June Oslo TCCA-CCBG CCBG 17 April Budapest TCCA-CCW 21-23 May Paris (World Congress) With posibility for joining President of Interpol + EC CCBG 27 June Amsterdam CCBG 8 Oct. London EC General frequency conference 25+26 June Brussels EC PPDR workshop 11 July Brussels Severals LTE summit 25-26 June Amsterdam IIR + CCBG ‘professional LTE + spectrum Forum’ 9-11 Oct. London IIR Controlroom 10-12 Dec. Vienna

CEPT-FM PT49

• PT49: special working group for PPDR mobile broadband •

Participation of Public Safety is essential

• PT49 wants close relationship with LEWP • LEWP Matrix is basis for frequency demand discussion in PT49 • ‘Report A’ with LEWP Matrix + German study as basis • Extra explanation by ‘3 Operational Scenario’s’ document

+ Get in contact with you national administration

Roadmap of the FM49 work

• FM49 main task:

find harmonised radio spectrum for the future European broadband PPDR system

• The concept of the future European broadband PPDR system:

Wide Area Network (WAN) + Ad-Hoc networks

• ECC Report ”A” (requirements) – 2012 ECC Report ”B” (solutions) – 2013 • FM49 also supports the CEPT/ECC preparatory work for the World Radio Conference 2015

(WRC-15) Agenda Item 1.3

on the spectrum requirements for PPDR

FM49#04 meeting (14-15 June, Berlin) (1)

• The “

Catalogue of PPDR Applications Related Requirements

” was approved by FM49 and created a basis for the work on the ECC Report “A” (requirements) • The work on the assessment of the necessary overall spectrum bandwidth for a BB PPDR Wide Area Network (WAN) was started based on the following assumptions: o o o o applications: LEWP/RCEG ETSI “Matrix of applications” scenarios: LEWP/RCEG PP1 and PP2 scenarios

technology: LTE frequency ranges: 400 MHz and 700 MHz

(other candidate frequency bands are also under discussion)

Result PT49

ECC report A In report A the ‘requirements’ en in report B the ‘solutions’.

In report A: • General description PPDR ‘operational framework’, • Concept future PPDR BB (WAN + ad-hoc networks), • PPDR Application related requirements (LEWP/RCEG-ETSI Matrix + scenarios), • Operational requirements for WAN (‘terrestrial fixed network’), • Spectrum demands for WAN (from correspondence Group + ETSI calculation tool) • Chapters on ‘non-WAN’ services: DMO, AGA, Ad-hoc networks • Chapter on voice (consequences if in future voice goes over the LTE network) + annex from ETSI with calculation on spectrum consequences of it • Rapport A also contains definition of terminologies

Report A

For the WAN there are several calculations made (uplink, downlink, optimistic + pessimistic link-budget, users at edge of a cell etc.) • Overall result is

(minimum) 2x 10 MHz

needed as harmonised ‘core band’, with the possibility to have more (or less) on a national basis .

• This is without AGA, DMO, ‘voice over LTE’, extra capacity for ad-hoc • networks .

• ETSI calculation for ‘voice over LTE ’ gives an estimation that an other 2x3,2 MHz is needed (based on comparable functionality with Tetra).

Hybrid solution

is mentioned as a good mix between partly dedicated and partly using commercial operator. In Report A is this

flexibility

clearly indicated.