Transcript Poster

Evaluating Construction Methods for an Electrical Transition Compound
Andrew Canniff and Christopher O’Connor
Location: Dartmouth, Nova Scotia
Worcester Polytechnic Institute, Department of Civil and Environmental Engineering
Advised by: Fred Hart & Suzanne LePage
Abstract
• We evaluated various construction methods including: Cast in Place
Concrete, CMU, ICF, Precast Concrete, and Structural Steel for an
Electrical Transition Compound.
• Evaluation criteria included cost, construction duration, environmental
impact, durability, maintenance, and availability of labor and materials.
• A recommendation and an alternative option were submitted to Stantec
Consulting Ltd. for the most viable construction options.
Objective
• Develop evaluation criteria and scoring system, which objectively
assesses the five construction methods based upon seven distinct
factors.
• Select the most viable construction method and an alternative option for
the construction of the Transition Compound
Methods
1. Research
• Review preliminary design documents by Stantec Consulting Ltd.
2. Design Option Selection
• Compile list of all potential construction methods based upon the
specifications for the Transition Compound
3. List of Tasks
• Create a list of all necessary tasks for each construction method
4. Preliminary Construction Schedule
• Produce construction schedules using estimated task durations to
create a Gantt Chart
5. Preliminary Cost Estimates
• Calculate overall costs of construction for each method using
various cost estimating tools
6. Design Option Evaluation Criteria
• Create evaluation criteria to analyze the possible construction
methods
7. Selection of Optimal Design Option
Transition Compound
Construction Methods
Evaluation Criteria
1:Lowest
5:Highes
t
Cast in Place Concrete
Construction Duration – 24 ½ Weeks
Estimated Cost – $990,457.10
Description – Formwork
Reinforcing Steel
Mix-Designed Concrete
Pouring Stages
Scaffolding & Bracing
Weatherproofing
Concrete Masonry Unit (CMU)
Construction Duration – 31 Weeks
Estimated Cost – $895,957.10
Description – CMU Block
Horizontal Bracing
Vertical Reinforcing Steel
Grouting
Scaffolding & Bracing
Weatherproofing
Insulated Concrete Forms (ICF)
Construction Duration – 23 ½ Weeks
Estimated Cost – $898,601.70
Description – ICF Blocks
Acts as permanent formwork
Mix-Designed Concrete
Pouring Stages
Reinforcing Steel
Scaffolding & Bracing
Weatherproofing
Precast Concrete
Construction Duration – 22 Weeks
Estimated Cost – $1,147,957.10
Description – Off-site Fabrication
Installation of Panels
Bracing
Weatherproofing
Structural Steel
Construction Duration – 20 Weeks
Estimated Cost – $929,674.85
Description – Off-site Fabrication
Installation of Steel Elements
Bracing
Weatherproofing
Criteria
Cost
Schedule
Environmental
Impact
Durability and
Lifespan
Required
Maintenance
Availability of
Labor
Availability of
Materials
Total Score
Ranking
Cast in Place
Concrete
Precast
Concrete
Structural
Insulated
Concrete
Steel
Concrete Form Masonry Unit
Weight
Factor
2
2
4
4
2
8
6
10
8
6
10
2
1-5
1
2
3
5
4
1
1-5
1
3
3
5
4
4
1-5
1
4
4
3
5
4
1-5
1
5
4
5
4
5
1-5
1
5
27
5
29
5
39
5
36
5
31
5
4
1
2
3
Range
1-5
1-5
1: Best
5: Worst
Results
Final Construction Method Rankings
Construction Method
Construction Duration
Structural Steel
Estimated Cost
Overall Ranking
20 Weeks
$
929,674.85
1
Insulated Concrete Form (ICF)
23.5 Weeks
$
898,601.70
2
Concrete Masonry Unit (CMU)
31 Weeks
$
895,957.10
3
Pre-Cast Concrete
22 Weeks
$
1,147,957.10
4
24.5 Weeks
$
990,457.10
5
Cast-in-Place Concrete
Conclusions
Recommendation
• Structural Steel
• Benefits – Faster Construction Time
Moderate Cost
Accelerates Revenue Production
Alternative Option
• Insulated Concrete Forms (ICF)
• Benefits – Lower Cost
Moderate Construction Time
Decreased Operation & Maintenance Costs
Acknowledgements
We would like to thank the following people for their help and support
throughout this project:
Suzanne Lepage, Fredrick Hart, Jean Peinsznski, Bill Pay, Joshua Pidgeon,
Nate Dimock, Brian Hines, and the rest of Stantec Consulting Ltd.