LCLS
Personnel Protection System and
Beam Containment System
E. Michael Saleski
PPS and BCS Systems Manager
October 12, 2006
FAC: PPS and BCS
E. Michael Saleski
[email protected]
PPS and BCS Overview
Path for design development, review, and
approval
System Scope
Present Status of Systems and Reviews
October 12, 2006
FAC: PPS and BCS
E. Michael Saleski
[email protected]
Safety Systems Development and Review
Process
LCLS Engineering Specification Document (ESD)
is developed in consultation with System
Engineers, RP, and LCLS Management
System Engineers design system
LCLS Project Reviews (SCR, PDR, FDR) are
conducted
RSO/Radiation Safety Committee approval is also
required
System is built by System Engineers and Techs
October 12, 2006
FAC: PPS and BCS
E. Michael Saleski
[email protected]
Safety Systems Development and
Review Process
Need for New PPS
System
Rework
Specification
System Specification:
Draft ESD
Rework
Proposal
System Concept
Review
System Specification:
Approved ESD
Success
(Project and RSO/RSC)
Rework
Procedure
Safety Validation
Planning
Hardware Design and
Development
Validation
Procedure Review
Preliminary/Final
Design Reviews
(CPE and Project)
Success
(Project and RSO/RSC)
Success
Rework
Hardware
Implementation
of PPS System
Successful
Completion of
Safety Validation
October 12, 2006
FAC: PPS and BCS
E. Michael Saleski
[email protected]
Operation of
PPS System
PPS Scope
Mixture of:
New PPS Systems
Existing PPS Systems with minor modifications
Hutch Protection Systems (HPS)
Plan to utilize PLC architecture
New at SLAC, increases review burden
October 12, 2006
FAC: PPS and BCS
E. Michael Saleski
[email protected]
PPS Scope
Backward
Beam
Stopper
Injector
Shield Wall
LINAC
2021
2223
2425
2627
2829
Equipment Access
& Emergency Exit
LTU to BSY
Emergency
exit
Sector 30
+ BSY
Muon
Shield
LTU
Undulator
Hall
Electron
Dump
Enclosure
D2
Dump
BAS II
Dump
Barrier Gate at
BSY/RY Boundary
Shield
Wall
October 12, 2006
FAC: PPS and BCS
FEE
Shield
Wall
Near
Hall
X-Ray
Transport
E. Michael Saleski
[email protected]
Far
Hall
Near Experimental Hall Draft Layout
BL0-SXR2
ST3, ST4
Hutch NEH1
BL0-SXR2
ST1, ST2
Hutch NEH2
1
offline
BL0-3
ST1, ST2
2
SXR2
Hutch NEH3
1
SXR1
3
4
Mode
HXR
4
Mode
BL0-HXR
ST1, ST2
BL0-SXR1
ST1, ST2
October 12, 2006
FAC: PPS and BCS
1
2
Shielded Enclosure
E. Michael Saleski
[email protected]
BL0-HXR
ST3, ST4
Simplified PPS System Architecture
Safety-Critical
Logic, Status
and Control
PLC PPS
Safety-Critical
Status Device
Chain ‘A’
MCC
Non SafetyCritical Status
PPS Hardwire
Enable
AB
ControlLogix
Digital Input
32 Bit Digital
Output Card
EPICS
Display Panel
Controls
Network
TCP/IP
Future
DeviceNet
Pilz PLC
System ‘A’
Safety-Critical
Control
Chain ‘A’
AB
ControlLogix
5000
AB
ControlLogix
Digital Output
Non SafetyCritical
Control
Safety-Critical
Control
Chain ‘B’
Pilz PLC
System ‘B’
Safety-Critical
Status Device
Chain ‘B’
October 12, 2006
FAC: PPS and BCS
E. Michael Saleski
[email protected]
PPS Reviews Status
PPS Global SCR: Nov 18,
2005
Injector (linac+BSY)
Informal PDR: Feb ’06
Injector (linac+BSY) FDR:
April 27th
October 12, 2006
FAC: PPS and BCS
RSC subcommittee:
Functional Requirements
Review: March 29th
RSC subcommittee: Safety
Lifecycle Review: April 14th
RSC subcommittee:
Technical Review: May 8th
RSC full committee: Aug
23rd; Sept 7th
E. Michael Saleski
[email protected]
PPS Status for Jan 2007 Injector
Commissioning and Downstream Development
LCLS Injector PPS Reviews are Complete
RSC ‘conditional approval’ obtained:
Produce written response to FDR and RSC
subcommittee comments and findings (done)
RSC would like to review Certification procedure
(scheduled for end of October)
Hardware drawings, wiring diagrams are complete;
installation in progress
Begin detailed design and review of downstream
systems in Fall 2006 (BTH, NEH)
October 12, 2006
FAC: PPS and BCS
E. Michael Saleski
[email protected]
BCS Definition and Project Scope
Prevents radiation from ‘escaping’ the shielding
enclosure
Direct measurements of radiation or beam loss
Protection of safety-critical collimators and stoppers
Entirely ‘new’ LCLS BCS needed
New gun = new shut-off mechanisms
Support two simultaneous programs (LCLS & PEP) =
new set of shut-off paths
Reduce mutual interference of programs as much as
possible = desire targeted shut-offs if plausible
October 12, 2006
FAC: PPS and BCS
E. Michael Saleski
[email protected]
BCS System Scope
Original ‘Mode-switching’ BCS proposal has
been sidelined for now
Propose an ‘Interim BCS’ where
conservatively “All BCS faults shut-off all
Guns.”
Mode-switching requirements are now better
understood – move forward with second
proposal for 2007 downtime implementation
October 12, 2006
FAC: PPS and BCS
E. Michael Saleski
[email protected]
Sidelined BCS Modes
HENIT
NARC
A-Line
LCLS
Inj
NDR
PRL
BAS II
CID
BTH
HE Bypass
SDR
LE Bypass
SARC
Accelerator in LCLS Mode
Beamlines that shut-off CID
Beamlines that shut-off LCLS
LESIT
HENIT
NARC
A-Line
LCLS
Inj
NDR
PRL
CID
D2
HE Bypass
SDR
BTH
LE Bypass
SARC
Accelerator in Linac Mode
LESIT
October 12, 2006
FAC: PPS and BCS
E. Michael Saleski
[email protected]
Interim BCS System Architecture
NIT/SIT BCS
Summary and
Bypass Chassis
LINAC
LINAC
LINAC
Zone 3
Zone 2
Zone 1
BCS
Summary
and
Shut-Off
Chassis
BCS
Summary
and
Shut-Off
Chassis
BCS
Summary
and
Shut-Off
Chassis
DC Detect
PEP ACMs (5113)
MCC Meter Relays
BCS Trigger Timing Watchdog
BSY ACMs (5112, 5150)
ESA BCS
Summary and
Bypass Chassis
119B PICs
119C PICs
BSY PICs BCS
Summary and
Bypass Chassis
119D PICs
Sector 29 and E+
BCS Inputs
Sector 4,
Sector 10,
Damping Rings,
And CID
BCS Inputs
CID
Local Mode
Chassis
PIC Crate
ST950
ST960
ST950 &
ST960
Flow Switches
LCLS
Zone
LCLS Inj
BCS Devices
Future BTH
BCS Devices
October 12, 2006
FAC: PPS and BCS
LCLS BCS
Summary and
Bypass Chassis
BCS
Summary
and
Shut-Off
Chassis
To LCLS
Shut-Off
Mechanisms
E. Michael Saleski
[email protected]
To CID
Shut-Off
Mechanisms
BCS Device Scope
2 LION pairs in Injector Region, plus 2 flow switches
Redundant LIONs will be run the entire length of the Beam
Transport Hall (above ground beamline)
Numerous BTM shield walls, plus IC pairs, in BTH
At least two BCS power-limited devices in BTH = 4 ICs
Electron Dump BCS Implementation…
X-Ray system BCS should be 100% passive (no active
components)
October 12, 2006
FAC: PPS and BCS
E. Michael Saleski
[email protected]
Proposed Electron Dump BCS
Dump Enclosure
FEE
Permanent
Magnets
FEE
Stopper
Verti
ca l B
Muon
Spoiler
FEE
Stopper
Horiz
IC
IC
end
Hall Probe
Monitors
PCPM2
onta
l Be n
d
IC
IC
PCPM1
Safety Dump
with BTM
and ICs
BSOIC
Zero-Degree
BTM
Average Current
Comparitor
Main Dump
October 12, 2006
FAC: PPS and BCS
E. Michael Saleski
[email protected]
BCS Status for Jan 2007 Injector
Commissioning and Downstream Development
Interim design PDR and FDR are complete (Sept
8th and Oct 6th)
Follow-up review of ‘SBI’ implementation needed
New LCLS BCS device compliment for Injectorthrough-TD11 operation is approved by the RSC
(Sept 28th)
RSC Review of Interim BCS system design is
scheduled for Oct 17th
New BCS device compliment for downstream
systems is currently being specified – much is
dependent on LCLS ‘ray traces’
October 12, 2006
FAC: PPS and BCS
E. Michael Saleski
[email protected]
Summary
PPS:
Injector Vault will be ready for Jan 2007 operation
Downstream system development looks to proceed on
schedule
BCS:
Interim BCS design looks to be on track for Jan 2007
operation
New Mode-switching proposal ready for RSO
examination in early 2007
Detailed analysis of downstream system BCS device
requirements is beginning