Transcript Accelerator Readiness

SLAC National Accelerator Laboratory
Accelerator Readiness
ARR scheduled for Dec. 2-4
The desire is to run beam the following week.
Working closely with the SSO and the
committee to make this happen.
Committee:
Nov. 12, ‘08
Accelerator Readiness
Name
Affiliation
Primary Responsibility
Bob Casey (Chair)
BNL
ESH, Radiological
Mike Buckley
BNL
Conduct of Ops, QA
Ian Evans
ORNL
ESH, Training, Operations
Jim Floyd
LBL
ESH, Training, Operations
John Forrestal
ANL
Interlocks
Bob Hettel
SLAC
Accelerator operations
PK Job
BNL
Radiological
Greg Markovich
ANL
Interlocks
1
David Schultz
[email protected]
SLAC National Accelerator Laboratory
ARR assignments
Nov. 12, ‘08
Accelerator Readiness
2
David Schultz
[email protected]
SLAC National Accelerator Laboratory
ARR Lines of Inquiry
(from the chairman)
The ARR will verify that:
An acceptable SAD has been properly developed in accordance with DOE O 420.2B requirements, and has been reviewed
and approved in accordance with the SLAC internal safety review system.
Casey
An adequate ASE has been developed in accordance with the ASO and is supported by the SAD.
Casey - general
Hettel – operational requirements adequately defined
Job – radiation safety requirements adequately defined
An appropriate commissioning plan has been developed.
Casey - general
Hettel – operational plans consistent with SAD and ASE requirements
Job – radiation assessments to confirm adequacy of shields and beam dumps for normal and abnormal conditions
An appropriate USI process has been developed.
Casey
Procedures necessary for the safe operation of the activity have been developed, reviewed, and approved, and an
appropriate process for the development, review and approval of new and revised procedures is in place.
Hettel – are adequate procedures to conduct undulator complex commissioning and fault studies in place
Job – are adequate procedures in place for fault studies; radiation monitoring, beam containment systems testing, certification and
configuration control
Markovich, Forrestal – are adequate procedures in place for search and secure; interlock testing, certification and configuration
control
Evans – ODH & electrical safety
Floyd – ISM processes, including work planning, review and approval of facility mods; management of safety related changes
Buckley – conduct of operations program; process for development, review and approval of new and revised procedures
Procedures to deal with abnormal and emergency situations have been prepared and are approved for use.
Evans – ODH, fire, radiation, electrical, medical
Now assigning SLAC contacts.
Hettel – Main control room response
Nov. 12, ‘08
Accelerator Readiness
3
David Schultz
[email protected]
SLAC National Accelerator Laboratory
ARR agenda
12/2
am: Plenary
pm: Interviews and walkdowns
12/3
am: Interviews and walkdowns
pm: Exec. session
12/4
am: Exec. session
Closeout
pm: Report preparation



Nov. 12, ‘08
Accelerator Readiness
ARR web link
4
David Schultz
[email protected]
SLAC National Accelerator Laboratory
SAD and ASE
SLAC-I-010-30100-016_lclsundcomplexsad_text_r000
Nov. 12, ‘08
Accelerator Readiness
5
SLAC-I-010-30100-000_lafase_text_r001
David Schultz
[email protected]
SLAC National Accelerator Laboratory
LCLS Undulator Complex
Commissioning Preparedness Document
aka Commissioning Plan
Appendix A: Sign-off for staff with responsibility for engineering, installation,
safety and operations to verify that all required systems are ready for electron
beam commissioning.
Appendix B: The review process used during LCLS Undulator Complex
engineering. Safety and oversight reviews are discussed, and field inspections
by Safety Officers and committees are documented.
Appendix C: Procedures and training required for operation and maintenance of
LCLS Undulator Complex commissioning.
Appendix D: Plans for beamline commissioning. Beamline component checkout,
system training for Operators and the schedule for operations, including
radiation measurements.
Appendix E: Draft Beam Authorization Sheet for the LCLS Undulator Complex.
Nov. 12, ‘08
Accelerator Readiness
6
David Schultz
[email protected]
SLAC National Accelerator Laboratory
Outstanding Issues (11-5-08)
B4C laser stopper
Testing plan to establish viability.
Fire safety check-off
Fire systems commissioning through 11/14
BCS certification
Scheduled to start 11/26
Preparedness document sign-off
Final signatures are last-minute
Nov. 12, ‘08
Accelerator Readiness
7
David Schultz
[email protected]
SLAC National Accelerator Laboratory
Conclusion
We
We
We
We
Nov. 12, ‘08
Accelerator Readiness
know who the examiners are.
know what questions they will be asking.
know who will answer which question.
ought to be able to pass this test.
8
David Schultz
[email protected]