Transcript ASU
ASU TVDC Progress Report 01/26/10 Kathryn F. Sykes and Stephen A. Johnston Completed Milestones: 25, 26, 28 and 32, 33, 34 Active Milestones: ASU 35 & 36 Currently Inactive Milestones: 30, 37, 38 MILESTONE 35 Array hybridations with mouse RNAs from virulent Schu 4 infection & RT PCR confirmation of candidates Gray: (sub )milestone title Red: completed Green: in progress Virulent Schu 4 Samples RT-PCR Confirmations Initial samples Dose-Response of Infection Completed Slide 2 MILESTONE 36 Final integration of expression data and informatics analysis Increasing FTT0415 FTT0698 FTT1137c Gray: (sub )milestone title Red: completed Green: in progress Decreasing Flat FTT0560c FTT0103c FTT1038c FTT0150 FTT1506 FTT1526 Slide 3 Increasing FTT0415 FTT0698 FTT1137c Decreasing Flat FTT0560c FTT0103c FTT1038c FTT0150 FTT1506 FTT1526 Slide 4 Slide 5 Additional Points • Description of deliverables completed for each active milestone: – MS 35: Microarray results with qPCR verification – MS 36: Set of 9 proteins for testing as vaccine candidates • List of relevant publications from the past month • ASU reports no TVDC publications in December 2009 • MSCR status – MS28: Kathy-Completed and accepted by NIAID on 1/6/2010 – MS33: Mitch, ver 0.4 is pending at ASU; overdue to UNM approximately 12/18/09 – MS34: Mitch, ver 0.1 is pending at ASU; overdue to UNM approximately 12/17/09 – MS35: Mitch- completed work; ASU will write MSCR – MS36: Mitch- completed work; ASU will write MSCR Slide 8 Action Items • Phillip: send revised analysis slides to Barbara. Slide 3 summary gene set needs to match gene sets listed in later slides (done 1/26/10) • Rick will want to review the ASU data and discuss with ASU on an interim call before MS 35 and 36 are listed as completed and before the ASU selected 9 gene candidates are considered for MS 37 • Barbara: will arrange an interim teleconference call between ASU and UNM, regarding strategy and selection of vaccine candidates. • MS33 MSCR: Mitch will email revised version to Barbara by 2/1/10 Monday. • MS34 MSCR: Mitch will email a version to Barbara by 2/1/10 Monday. • MS35 and MS36 MSCRs: ASU will start writing these now. Slide 9