Session 2: Review of the Process of Preparing for the
First Draft of the Regional Project Document (ProDoc)
Seminar on the Implementation of the 2008 SNA
in Africa
11-15 April 2011
Addis Ababa, Ethiopia
Recommendations of the AGNA meeting & DG
meeting in last December in Yaoundé
• Conduct additional evaluation of the status of production of national
accounts and SNA 2008 implementation capacity SNA Assessment
Questionnaire.
• Formulate a single African project for implementation of the SNA 2008
for the period 2011-2015 Regional ProDoc.
• Organize a roundtable with the participation of all countries to discuss
the project “Seminar on Implementation of SNA 2008”.
• Undertake advocacy for mobilization of financial resources towards
operationalization of the African Strategy for implementation of the
SNA 2008.
• Develop advocacy tool and disseminate them to ensure appropriation
of the SNA 2008 by all the stakeholders.
African Centre for
Statistics
Working Group on Preparation of ProDoc
• A Working Group on the preparation of the Project Document
(ProDoc) on the implementation of the 2008 SNA in Africa
gathered from the 11-18th January 2011 in Addis Ababa,
Ethiopia.
• The Working Group is composed of a member of the AfDB and
members of UNECA ACS-ESNA.
• The initial schedule of the Working Group was from 11 to 22
January 2011. The Working Group has worked till 18 January due
to the situation in Tunis which obliged the AfDB participant to
move back.
• During the meeting, technical issues were discussed and planned
including the way forward for the ProDoc.
African Centre for
Statistics
The Design of the ProDoc
• The timeframe: 2011-2015
• With Regional Strategy: To operationalize the African Strategy on the 2008 SNA. It
will therefore be built on the 40 activities as identified in the framework of the Strategy.
• With Global Strategy: Clearly reflect the links with the global strategy of
implementation of the 2008 SNA.
• Four operational components: Methodology development, Capacity building,
Institutional strengthening, and Advocacy campaign.
• In addition, an administrative component representing the project implementation unit
(PIU) will be included.
African Centre for
Statistics
The Design of the ProDoc (Cont’d)
• Common project: of all regional institutions and potential regional stakeholders. In the
same spirit, a common trust fund for the project will be established as a unique window
for anybody who would like to fund the project.
• Governance of the project: to be developed by borrowing from the governance
structure of the African Implementation Plan for the Global Strategy for Improving
Agricultural Statistics.
African Centre for
Statistics
The Design of the ProDoc (Cont’d)
• Evaluation and assessment: to have a further and in-depth assessment of
the current states Member States in the implementation of the 2008 SNA
will be crucial for the design of the Regional Project for the implementation
of the 2008 SNA.
• Pre-events surrounding the implementation of the projects: The ProDoc
should go through a regional validation meeting which will be followed by
a round table meeting for funding.
African Centre for
Statistics
Producing First Draft of the ProDoc
• Following up the above discussion, the ECA members of the Working
Group on the preparation of the Project Document (ProDoc) continued to
complete the draft version.
African Centre for
Statistics
United Nations Economic Commission for Africa
African Centre for
Statistics
Thank you