Transcript ppt charts
LAT EMI Test • LAT test levels derived from LAT-SS-0778 • Use CAL EMI test procedure as template – LAT-PS-03929-03 • Test Suite: – – – – – – – – – CE102 Conducted Emissions, Power Leads, 10 kHz to 10 MHz, MIL-STD-462, CE03 CECM Conducted Emissions, Time Domain, 150 MHz Bandwidth CS102 Conducted Susceptibility, Power Leads, 10 kHz to 10 MHz, MIL-STD-462, CS02 CSCM Conducted Susceptibility, Common Mode, 30 Hz to 150 MHz, MIL-STD-462, CS02 CS06 Conducted Susceptibility, Spike, Power Leads, MIL-STD-462 RE101 Radiated Emissions, Magnetic Field, 20 Hz to 50 kHz RE102 Radiated Emissions, Electric Field, 10 kHz to 18 GHz, MIL-STD-461E RS101 Radiated Susceptibility, Magnetic Field, 20 Hz to 50 kHz RS103 Radiated Susceptibility, Electric Field, 30 MHz to 18 GHz LAT Power Interfaces • SC-LAT Power Interfaces – – – – – – – – – – SC PRU (P) - LAT PDU SC PRU (R) - LAT PDU SC PRU (P) - LAT SIU (P) SC PRU (R) - LAT SIU (R) SC PRU (P) - LAT VCHP +Y SC PRU (P) - LAT VCHP -Y SC PRU (R) - LAT VCHP +Y SC PRU (R) - LAT VCHP -Y SC PDU (P) - LAT MAKEUP SC PDU (R) - LAT MAKEUP Test Limitations • RS103 upper limit of 18GHz (40GHz) • Limited area of RS101 test – Requires scanning each 10cm x 10cm area, ~16min/scan – ~1450 scans for the LAT, another ~1200 for the radiators (~29 days) – Scan selected locations around connectors, PMTs, BEA • Limited B side conducted testing – Emissions tests and susceptibility only where noted on A side • Limited VCHP htr testing – Emissions only EMI Test Configurations • Split EMI test – Conducted tests performed in the high bay integration area – Radiated testing performed in anechoic chamber • Conducted emissions and susceptibility tests with SIU and PDU do not require radiators, but do require good access to connectors – LAT z axis vertical to provide access to LAT connectors with 2m cable lengths LAT Table LAT MAGE Radiated Test Configuration Radiated Test Configuration LAT Cable Feedthrough Conducted Test Considerations • Fully test: – SC PRU (P) - LAT PDU – SC PRU (P) - LAT SIU (P) • Limited test: – SC PRU (R) - LAT PDU – SC PRU (R) - LAT SIU (R) • Need to resolve operating constraints on VCHP htrs – Can they be run for extended periods of time at ambient temp? – Thermostatic overtemp protection – Limited power, ~4W/circuit • No plan to test PDU - LAT Makeup – Thermostatic control, open circuit at ambient temp • Conducted susceptibility tests may require disabling bus protection unit Conducted Test Harness • Require access to power harness 2m from LAT I/F – CE102, CS102 (10kHz - 150kHz), CSCM (30Hz - 150kHz), CECM – All conductors of power circuit must be connected to a single 1/4” lug on line conditioner – All conductors must be gathered into a bundle so that a current probe may be connected around them • Require access to power harness ~5cm for LAT I/F – CS102 (150kHz - 150MHz), CS06, CSCM (150kHz - 150MHz) – Small bare section of a single conductor to attach clip lead for hf injection • EMI shielding not required on harnesses Radiated Test Harness • No access to conductors required • Harness must be fully shielded – Includes all connector savers • Any test ports must be closed out or have shielded harnesses – “back door” • Test harnesses must be shielded – Accelerometers – TCs & thermistors • Harness supports not directly connected to the LAT should be nonconducting material, wood or PVC Test Software • Emissions Testing – Utilize the FSW Charge Injection Calibration function to inject charge into a large number of detectors. The number of channels into which charge can be injected will be limited by: a) FSW design (which is not yet complete); and b) The number of channels which can physically be injected with charge in any given one second cycle. The one second cycle is required to provide repeatability during the Emissions frequency sweeps. • Susceptibility Testing: – A variation of the test described in the End-to-End (ETE) Test Plan, LATMD-03489, paragraph 2.2.1, item 4, "Nominal Rate Cosmic Ray Test" will be used. This test is run at ambient temperature and at nominal voltage, timing, threshold, and trigger configurations. Both Cosmics and the external trigger function are used to create on-orbit trigger rates. The external trigger rate will be set so that the total trigger rate will be at or near the nominal expected on-orbit values. – The externally triggered events should have very low occupancy, monitor to see if occupancy goes up – The cosmic ray events should remain constant, monitor to see if rate goes up. Test EGSE Software Tools • Displays of natural trigger rates and occupancy of externally triggered events should be strip chart type • Other error status, checksum, etc. should latch RE102 - Integrated LAT 60 (18G, 53) Notch GPS Freq 1.55G 1.60G S-band 1.77G 2.30G 50 (10K, 44) Limit Level (dBuv/m) 40 dB Freq dB 32 1.55G 14 14 1.60G 32.2 33.2 1.77G 25 25 2.30G 34.5 30 20 10 (2M , 8) 0 1.E+04 1.E+05 1.E+06 (100M, 8) 1.E+07 1.E+08 Frequency (Hz) 1.E+09 1.E+10 1.E+11 RE101 – All LAT Equipment 130 (20, 120) 120 Magnetic Field (dBpT) 110 100 90 80 70 60 50 40 1.E+01 (50K, 52) 1.E+02 1.E+03 Frequency (Hz) 1.E+04 1.E+05 CE102 Spacecraft PRU – LAT DAQ 90 (450K, 86) (1M, 86) (1.7M, 82) Limit Level (dBuA) 80 (10K,80) (350K,80) 70 60 (5.5M, 60) (10M,60) 50 1.E+03 1.E+04 1.E+05 1.E+06 Frequency (Hz) 1.E+07 1.E+08 CE102 Spacecraft PRU – LAT SIU (IL), VCHP Heaters 90 (450K, 80) (1M, 80) 80 Limit Level (dBuA) (1.7M, 75) 70 (10K,68) (350K,68) 60 (5.5M, 53) 50 (10M,48) 40 1.E+03 1.E+04 1.E+05 1.E+06 Frequency (Hz) 1.E+07 1.E+08 CE102 Spacecraft PDU – LAT Anti-freeze and Make-up Heaters 110 (10K, 106) (1M, 106) Limit Level (dBuA) 100 90 (10M, 86) 80 70 1.E+03 1.E+04 1.E+05 1.E+06 Frequency (Hz) 1.E+07 1.E+08 Conducted Emissions Common Mode – All LAT Equipment 250 (DC,200) (150M,200) Limit Level (mV peak-peak ) 200 150 100 50 0 1.E+00 1.E+01 1.E+02 1.E+03 1.E+04 1.E+05 Frequency (Hz) 1.E+06 1.E+07 1.E+08 1.E+09 RS103 Perform – BEA and Tracker Tower 60 55 Fre q 2.2825G - 2.2925G 50 14.9634 - 15043.4G V/m 38 40 45 Limit Level (V/m) 40 35 30 25 20 15 (30M , 20) (40G, 20) 10 1.E+07 1.E+08 1.E+09 Frequency (Hz) 1.E+10 1.E+11 RS101 Perform – BEA and Tracker Tower 160 150 (20, 142) Magnetic Field (dBpT) 140 130 120 110 100 90 80 70 60 1.E+01 (50K,76) 1.E+02 1.E+03 Frequency (Hz) 1.E+04 1.E+05 CS102 Spacecraft PRU – LAT DAQ 90 (450K, 86) (1M, 86) (1.7M, 81) Limit Level (dBuA) 80 (10K, 74) (350K, 74) 70 60 (5.5M, 59) (10M, 54) 50 1.E+03 1.E+04 1.E+05 1.E+06 Frequency (Hz) 1.E+07 1.E+08 CS102 Spacecraft PRU – LAT SIU (IL), VCHP Heaters 90 (450K, 86) (1M, 86) (1.7M, 81) Limit Level (dBuA) 80 (10K, 74) (350K, 74) 70 60 (5.5M, 59) (10M, 54) 50 1.E+03 1.E+04 1.E+05 1.E+06 Frequency (Hz) 1.E+07 1.E+08 CS102 Spacecraft PDU – LAT Anti-freeze and Make-up Heaters 120 (10K, 112) (1M, 112) Limit Level (dBuA) 110 100 (10M, 92) 90 80 70 1.E+03 1.E+04 1.E+05 1.E+06 Frequency (Hz) 1.E+07 1.E+08 Conducted Susceptibility Common Mode – All LAT Equipment 500 (DC,400) (150M,400) Limit Level (mV peak-peak ) 400 300 200 100 0 1.E+00 1.E+01 1.E+02 1.E+03 1.E+04 1.E+05 Frequency (Hz) 1.E+06 1.E+07 1.E+08 1.E+09 CS06 Operate – All LAT Equipment E1 = 20 Volts t1 = 10 usec +/- 20% 0.5E1 Transient imposed on instrument power feed (Volts) E1 t1 Time (usec) CS06 Perform – All LAT Equipment E1 = 5 Volts t1 = 10 usec +/- 20% 0.5E1 Transient imposed on instrument power feed (Volts) E1 t1 Time (usec) Back-up Slides CE 102 LAT PDU – TPS (TEM, CAL, TRKR), EPU (IL), GASU (ACD BEA, IL), PDU (IL) 120 (450K, 112) (1M, 112) 110 (1.7M, 108) (100K, 106) (350K,106) Limit Level (dBuA) 100 90 (5.5M, 86) 80 (10M,80) 70 (10K,66) (100K, 66) 60 1.E+03 1.E+04 1.E+05 1.E+06 Frequency (Hz) 1.E+07 1.E+08 CS102 LAT PDU – TPS (TEM, CAL, TRKR), EPU (IL), GASU (ACD BEA, IL), PDU (IL) 90 (10K, 86) (100K, 86) 80 Limit Level (dBuA) 70 (450K, 58) (1M, 58) 60 (1.7M, 54) (100K, 52) 50 (350K, 52) 40 (5.5M, 32) 30 (10M, 26) 20 1.E+03 1.E+04 1.E+05 1.E+06 Frequency (Hz) 1.E+07 1.E+08