Transcript ppt charts
GLAST LAT Project Env Test Planning,15 March 2005 LAT Thermal Vac EGSE Cabling LAT System Engineering 1 GLAST LAT Project Env Test Planning,15 March 2005 TVAC Electrical Layout Drawing TV Chamber Wall 1-1 1-2 1-3 1-4 1-5 1-6 1-7 2-1 2-2 2-3 2-4 2-5 2-6 2-7 EGSE CABLING TBD UNTIL INTERNAL TVAC CABLING IS DETERMINED 3-1 3-2 3-3 3-4 3-5 3-6 3-7 4-1 4-2 4-3 4-4 4-5 4-6 4-7 5-1 5-2 5-3 5-4 5-5 5-6 5-7 6-1 6-2 6-3 6-4 6-5 6-6 6-7 Pigtails Prim_P2 Red_P2 Prim_P3 Red_P3 Prim_P1 Red_P1 Prim_A_P5 Connector Savers JL-119 1553 Coupler JL-232 JL-233 1553 Coupler JL-234 JL-235 JL-120 Prim_B_P5 Prim_A_P12 JL-122 Prim_P6 Prim_P7 JL-1 Prim_P9 Prim_P10 JL-2 Red_A_P5 Red_B_P5 Prim_B_P12 Red_P6 Red_P7 Red_P9 Red_P10 Prim_A_P4 Prim_B_P4 GBM-J1 Prim_P8 Prim_P11 Red_P11 LAT JL-121 JL-124 JL-125 SIIS Harness JL-138 JL-145 JL-133 JL-136 JL-127 JL-129 JL-140 JL-142 Red_A_P4 Red_B_P4 Red_P8 JL-146 JL-149 JL-152 JL-131 JL-238 JL-123 JL-144 JL-239 JL-69 (Test Port) JL-39 (Test Port) JL-264 (Flyaway Thermistors) 7-1 7-2 7-3 7-4 7-5 7-6 7-7 8-1 8-2 8-3 8-4 8-5 8-6 8-7 LAT System Engineering JL-266 (Flyaway Thermistors) ACD Flyaway Thermistors + 1 LAT Thermistor ACD Removable Thermistors Flyaway TC’s Removable TC’s Mix of Removable and MGSE TC’s MGSE TC’s 2 GLAST LAT Project Env Test Planning,15 March 2005 SIIS Harness Wire Count (1/2) PP # - Conn # Conn # Description 1-1 Prim_P2 JL-1, 119, 127 32 1-2 Red_P2 JL-2, 120, 129 32 1-3 Prim_P3 JL-1, 119, 140 32 1-4 Red_P3 JL-2, 120, 142 32 1-5 Prim_P1 JL-143, 146 16 1-6 Red_P1 JL-136, 149 16 2-1 Prim_A_P5 JL-121 14 4-1 Prim_A_P4 JL-125 26 3-1 Red_A_P5 JL-122 14 5-1 Red_A_P4 JL-138 26 2-2 Prim_B_P5 JL-121 14 4-2 Prim_B_P4 JL-124 26 3-2 Red_B_P5 JL-122 14 5-2 Red_B_P4 JL-145 26 4-3 GBM_J1 JL-124, 125, 138, 145 16 LAT System Engineering Power (wires) LVDS (wires) Analog(wires) 1553 3 GLAST LAT Project Env Test Planning,15 March 2005 SIIS Harness Wire Count (2/2) PP # - Conn # Conn # Description 2-3??? Prim_A_P12 JL-232, 233 1 3-3??? Prim_B_P12 JL-234, 235 1 2-4 Prim_P6 JL-1, 2, 152 32 3-4 Red_P6 JL-1, 2, 153 32 2-5 Prim_P7 JL-121, 123, 124 32 3-5 Red_P7 JL-122, 123, 138 32 4-4 Prim_P8 JL-238, 124, 125, 127, 129 30 5-3 Red_P8 JL-238, 138, 145, 127, 129 30 2-6 Prim_P9 JL-131, 140 30 3-6 Red_P9 JL-131, 141 30 2-7 Prim_P10 JL-142, 144 30 3-7 Red_P10 JL-142, 145 30 4-5 Prim_P11 JL-239, 152 30 4-6 Red_P11 JL-239, 152 30 TOTAL LAT System Engineering Power (wires) 160 LVDS (wires) 176 Analog(wires) 368 1553 2 4 GLAST LAT Project Env Test Planning,15 March 2005 Test Signal Wire Count PP # - Conn # Conn # LVDS (wires) Analog(wires) Test Port 5-4, 5-5, 5-6 JL-69 80 5-7 JL-39 34 Total 114 Thermistors 6-1, 6-2, 6-3 Flyaway 74 6-4 Removable 8 Total 82 GSE Heater TBD TC's (Sensor Count) TBD # of Sensors 6-5, 6-6, 6-7 Flyaway 54 7-1thru 7-6, 7-7 Removable 110 7-7, 8-1, 8-2, 8-3 MGSE 61 Total Sensors 225 LAT System Engineering 5 GLAST LAT Project Env Test Planning,15 March 2005 Total Counts Power (wires) TOTALS 160 (minus GSE Heaters) LAT System Engineering LVDS (wires) 290 Analog(wires) 450 1553 4 TC's (Sensors) 225 6 GLAST LAT Project Env Test Planning,15 March 2005 Near Term Issues/Work • • • Need to order long lead items such as TVac connectors – GSE Heaters • Heater requirements are quickly being developed – 1553 Port plate configuration SIIS harness will not reach all the necessary port plates – Investigate modifying harness by “breaking out” cables further from main harness. • Not obvious from drawings if this is possible. • When SIIS harness is delivered (March 21),an evaluation can be made. – Other possibility is to build extension cables. • Not desirable since it adds more interfaces. – Harness routing • Bend radius • Strain relief Not using SIIS Cable implementation of 1553. – Consolidates prime and redundant via 1553 couplers – VSC needs all four 1553 penetrations through port plates LAT System Engineering 7 GLAST LAT Project Env Test Planning,15 March 2005 Near Term Issues/Work • Facility Drawing – Port plate location relative to LAT • Used to determine cable lengths inside chamber – Locate EGSE outside chamber • Used to determine cable lengths outside chamber • Facility power capability for EGSE • Thermocouples • How the thermocouples will be grouped on the LAT end is TBD. • Wirelist – Work is just starting • Minor issue with flyaway thermistor count – One to many sensors to fit all on 2 connectors – Need to balance need for thermistor and cable complexity LAT System Engineering 8