Transcript ppt

IA Meeting – Apr22,2006
GLAST LAT Project
Status of LAT Data Analysis
Eduardo do Couto e Silva
Apr 21, 2006
E. do Couto e Silva
1
IA Meeting – Apr22,2006
GLAST LAT Project
LAT Pre-Ship Review
We would like to use runs taken with FSW to demonstrate the following
•
•
•
•
•
•
•
•
Multiple Trigger Engines are configured properly and rates/per engine agree
with expectations for ground cosmic rays Andrea
ROI are configured properly and performance agrees with expectations for
ACD tiles shadowing TKR towers Andrea
Quantities that depend on calibrations/thresholds agree with expectations for
surface cosmic rays
– position/width of muon peaks/CAL module David
– CAL pedestals Sasha
Need to quantify results!
– ACD pedestals agreement within 1% , 10%...?
– peak position/width of ToT distributions for MIPs
– noise occupancies for ACD, TKR and CAL
Deadtime for different readout modes agree with expectations
– zero suppression enabled/disabled
If you do not know how to
– CAL range (one or four)
get started in any of these
– Extrapolate muon tracks to the CAL David
topics please contact us
– verify position resolution and “PSF with muons” David
Extrapolate muon tracks to the ACD
– verify geometry and efficiencies
Study LAT performance when LAT is positioned horizontally (baseline for NRL)
Study LAT performance when we change the PDU voltages
– Search for increase in noise occupancy, extra sources of noise or changes
in pedestal Stefano/Monica
Study LAT performance when we add external rate to the data flow system
– Does the deadtime change in an expected way?
E. do Couto e Silva
2
IA Meeting – Apr22,2006
GLAST LAT Project
Workshop 7?
•
We are all very busy in the next few months
– LAT Delivered from SLAC
– ~ May
– Environmental Tests @ NRL
IA Workshop 7
– ~ May/June/July/August
– Beam Test Workshop 2
Maybe September ?
– ~ May 15-17
– DC2 Closeout
Goals:
– ~ end of May
– Beam Test Workshop 3
– ~ mid June
– ISOC Review
– ~ end June or mid July
– PS Beam Test
– July 27, Aug 20
Analyze NRL Data
(first opportunity to study system
properties at Temperature extremes!)
Compare with baseline at SLAC
– Collaboration Meeting
– Aug 28 – Sep 1
– SPS Beam Test
– Sep 4 – 18
E. do Couto e Silva
3