Transcript PPT

GLAST LAT Project
November 3, 2005
GLAST Large Area Telescope:
Gamma-ray Large
Area Space
Telescope
Integration and Test
Phase 0 IRR/TRR
November 3-4, 2005
Introduction
Ken Fouts
[email protected]
I&T Phase 0 IRR/TRR
1
GLAST LAT Project
November 3, 2005
Steps to Ship to NRL
• Phase 0 – Hardware check out
– Hardware
• ACD
• FLT PDU, EM GASU, FLT Cables, EMI Skirt, no SIU/EPU
– Software
• LATTE 4
– Exit
• Successful LATTE 4 CPT
• Phase 1 – Software check out
– Hardware
• FLT PDU, EM GASU, 1 Flt SIU, 2 Flt EPU, VSC, Control/Pwr Racks
– Software
• FSW, VSC, LICOS, Configuration Database
– Exit
• Successful LICOS CPT
• Phase 2 – Run for the record
– Hardware
• Full complement of flight hardware, X-LAT plate
– Software
• Flight release of FSW, VSC, LICOS, Configuration Database
– Exit
• Successful LICOS CPT, SVAC, E2E, Verification w/SIIS
I&T Phase 0 IRR/TRR
2
GLAST LAT Project
November 3, 2005
System Test Flow
Perf & Ops
Test Plan
MOOT / MOOD
Config Mgmt
Install LICOS
Install last 4
TWRs, 16 TWR
CPT
Install ACD, EM
GASU, PDU
LATTE 4 LAT
CPT, SVAC
FSW Checkout
FQT – Testbed
Install flt SIU /
2 EPUs, FSW
FSW 0.5.1
Release
10/17
LICOS LAT CPT,
SVAC, E2E
FSW Updates/
FQT – Testbed
VSC Full
Functionality
Install SIU/EPU
spares,Flt GASU
11/25
11/18
10/25
LICOS LAT CPT,
SVAC, E2E
Phase 0
Install CrossLAT Plate
1/10/06
Phase 1
Light-tight
tests/ CPT
12/16
Pre Ship
Review
01/20/06
01/24/06
Phase 2
I&T Phase 0 IRR/TRR
3
GLAST LAT Project
November 3, 2005
LAT I&T Schedule
I&T Phase 0 IRR/TRR
4
GLAST LAT Project
November 3, 2005
IRR/TRR Goals
Goals for this review:
• Review and assess the mechanical and electrical readiness for
Phase 0.
• Discuss plans for Phase 1 and 2.
• Identify additional reviews.
I&T Phase 0 IRR/TRR
5
GLAST LAT Project
November 3, 2005
I&T Organization
Subsystem I&T Support
ACD – Martin Kocian/Dave
Thompson
CAL - Eric Grove
DAQ - Mike Huffer
Elec - Dave Nelson
FSW - Mike DeKlotz
Mechanical - Marc Campell
SAS - Richard Dubois
TKR -Hiro Tajima
Controls - Shannon Leone
QA - Doug Bartholomew
LAT Integration and Test
Ken Fouts, Manager (SU-SLAC)
Eric Grove, Deputy Manager (NRL)
WBS 4.1.9, 4.1.9.1
Integration, Facilities, Configuration, and Test
Larry Wai, Manager (SU-SLAC)
Thomas Borden, IFCT Engineer (SU-SLAC)
WBS 4.1.9.6
Brian Grist
Eliazar Ortiz
Jeff Tice
Electrical Lead Engineer
Mechanical Lead Engineer
Material Logistics Lead
John Canfield, S&E Associate - Electrical
Phuc Hoang, S&E Technician - Electrical
Albert Nguyen, Electrical Engineer
Roger Williams, S&E Associate - Electrical
Mark Molini, S&E Associate - Mechanical
Leo Manger, S&E Associate - Mechanical
Dave Kiehl, S&E Technician - Mechanical
Tom Neiland, S&E Technician - Mechanical
Russ Patterson, Material Planner
Domi Celestino, Inventory Clerk
Mitch Conley, Shipping and Receiving
Reggie Rogers, S&E Associate - Mechanical
Mechanical
Design Support
Marc Campell,
Online
Software
Manager (SU-SLAC)
WBS 4.1.9.4
Manager (SU-SLAC)
WBS 4.1.9.5
Ric Claus,
Particle Test
Gary Godfrey,
Manager (SU-SLAC)
WBS 4.1.9.7
Environmental
Test
Michael Lovellette,
Manager (NRL)
WBS 4.1.9.8
Science
Verification,
Analysis, and
Calibration
Eduardo do Couto e Silva,
Manager (SU-SLAC)
WBS 4.1.9.9
Bill Olson
Jim Panetta
Mechanical Engineer
Engineering Physicist
Arthur Scholz
Mechanical Engineer
Various NRL
Personnel
Selim Tuvi
Anders Borgland
Software Developer
Engineering Physicist
Alicia Kavelaars
Eric Charles
Software Engineer
Software Developer
Lester Miller
Warren Focke
Engineering Physicist
Engineering Physicist
I&T Phase 0 IRR/TRR
LAT Collaboration
I&T Coordination
20 OCT 2005
6
GLAST LAT Project
November 3, 2005
Test Readiness Review Plan
• Electrical Test Readiness Review will cover:
– Current Test Status
• What has been completed
• What is the plan
– EGSE Hardware Configuration
– Current Flight Hardware Configuration Under Test
– Online Status
• LATTE Test Executive
• 16 Tower Test Scripts
•
LICOS Status (a glimpse into Phase 1)
I&T Phase 0 IRR/TRR
7