Transcript PPT
GLAST LAT Project November 3, 2005 GLAST Large Area Telescope: Gamma-ray Large Area Space Telescope Integration and Test Phase 0 IRR/TRR November 3-4, 2005 Mechanical Integration Ken Fouts [email protected] I&T Phase 0 IRR/TRR 1 GLAST LAT Project November 3, 2005 Key I&T Requirement Documents Document LAT-MD-00408-04c LAT Instrument Performance Verification Plan LAT-MD-02730-02d2 LAT Performance and Operations Test Plan Released Revision 4/7/05 6/7/05 LAT-MD-00676-04 LAT Assembly Sequence 9/1/05 LAT-MD-00895-04 LAT Instrument Survey Plan 2/1/05 LAT-DS-05210-52 LAT Systems KIT, Cable Installation 11/2/05 LAT-DS-02563-02 LAT Instrument Assembly 10/28/05 LAT-DS-06721-02 External Cable Assembly Sign-off LAT-DS-06639-01 LAT Integration Config Assy 10/28/05 LAT-DS-06958-02 ACD Lift Fixture 9/28/05 Requirements Definition Key to Successful I&T I&T Phase 0 IRR/TRR 2 GLAST LAT Project November 3, 2005 I&T Process Procedures Document LAT-PS-07240 ACD Integration Procedure Released Revision 11/2/05 LAT-PS-04911 DSHP Installation Procedure Sign-off LAT-PS-07575-02 LAT Instrument Safe to Mate Procedure Sign-off LAT-PS-07125-02 ACD Safe to Mate Procedure 10/28/05 Document Detailed Procedures for use in I&T I&T Phase 0 IRR/TRR 3 GLAST LAT Project November 3, 2005 Roadmap to ACD Integration and Test Install Flight PDU LAT-DS-02563 Install EM GASU LAT-DS-02563 Complete Grid Thermal Control Installation LAT-DS-01580 Install Instrumentation Accels and TC’s LAT-DS-02563 16 Tower CPT w/ACD ACD Integration LAT-PS-07240 Safe to Mate Flight Cables for PDU/GASU/ACD LAT-PS-07575 Bond Downspout Heatpipes and Fitcheck X-LAT Plate LAT-PS-04911 16 Tower LAT Optical Survey LAT-MD-00895 16 Tower CPT Critical steps have been identified and are in the current I&T plan I&T Phase 0 IRR/TRR 4 GLAST LAT Project November 3, 2005 MGSE • LAT-DS-6958 ACD Lift Fixture – Fit-check complete with ACD simulator – Proof tested per LAT I&T AIDS #1588 LAT I&T ACD lift fixture fabrication and check-out complete. I&T Phase 0 IRR/TRR 5 GLAST LAT Project November 3, 2005 ACD Lift Fixture I&T Phase 0 IRR/TRR 6 GLAST LAT Project November 3, 2005 ACD Lift Fixture w/ ACD I&T Phase 0 IRR/TRR 7 GLAST LAT Project November 3, 2005 ACD Integration Procedure (1 of 2) I&T Phase 0 IRR/TRR 8 GLAST LAT Project November 3, 2005 ACD Integration Procedure (2 of 2) I&T Phase 0 IRR/TRR 9 GLAST LAT Project November 3, 2005 Hardware Summary Pending Mechanical Parts To Support LAT Grid Integration 10-26-05 STOCK OR PART NUMBER TITLE OR DESCRIPTION QTY NEEDED (ORDERED) 1 2 AR 12 6(7) PO# Mech Mech Stores Mech Mech VENDOR NOTES LM Humboldt HAAS Tcm Humboldt C&H Ent. Part in B-33. M. Campell to provide paperwork to get it into stores ECD:11/2/05 Call into John dates are hard fixed. Order Placed on 10-20-05. Stores material expires on 10-31-05 ECD:11/2/05 Call into John dates are hard fixed. ECD: 10-26-05 Order Expedited;Received Qty.7 Bldg.33, in QC. ECD: 10-26-05 Order Expedited;Partial delivery possible on 10/27 or full order to deliver 10/28. ECD: 10-26-05 Order Expedited;Received Qty.7 Bldg.33, in QC. ECD: 10-26-05 Order Expedited;Received Qty.14 Bldg.33, in QC. In Stores B0601 Location ECD:11/2/05 Call into John dates are hard fixed. ECD: 10-26-05 Order Expedited;Received Qty.9 Bldg.33, in QC. ECD: 10-26-05 Order Expedited;Received Qty.1 Bldg.33, in QC. Delivery Date.(10/10) Arrive SLAC(Bldg.33) 10/18/05; In QC Delivery Date.(10/10) Arrive SLAC(Bldg.33) 10/18/05; In QC ECD: 10-26-05 Order Expedited;Received Qty.1 Bldg.33, in QC. ECD: 10-26-05 Order Expedited;Received Qty.1 Bldg.33, in QC. Reqd number of accel cables audited by J.Ku/L.Lee and no additional 003M208 cables are needed. ECD:10/18/05; checking status with vendor;Received 10/26/05 Bldg.33 Purchase Request signed, drawing not release, ECD: 11/7/05 Purchase Request signed, drawing not release, ECD: 11/7/05 Purchase Request signed, drawing not release, ECD: 11/7/05 Purchase Request signed, drawing not release, ECD: 11/7/05 Arrive SLAC(Bldg.33) 10/18/05; In QC Arrive SLAC(Bldg.33) 10/18/05; In QC LAT-DS-01247 LAT-DS-02878 50-02-1075-0000 LAT-DS-02443 LAT-DS-02876 X-LAT PLATE SCD X-LAT PLATE ACCESS COVER CHO-BOND 1075,SEALANT (CHOMERICS) HP EMI COVER RH HP FLANGE SPACER THREADED LAT-DS-02877 LAT-DS-04878 LAT-DS-02875 311P18-09A10R LAT-DS-05003 LAT-DS-06970 LAT-DS-06705 SS-600-61 SS-500-R-6 LAT-DS-07080 LAT-DS-07210 HP SHIM SET LH HP FLANGE SPACER THREADED HP FLANGE SPACER THERMISTOR (YSI) BLANKET BAR, MLI MOUNTING PAD, ACCELEROMETER +X EXTENSION BRACKET BULKHEAD UNION 3/8" TUBE (SWAGELOK), ST STEEL REDUCING UNION BODY, .375 - .3125 (SWAGELOK), ST STEEL -X EXTENSION BRACKET BLOCK, ACCELEROMETER MOUNTING GRID 24(26) 6(7) 12(14) 24(25) 2 7 1 2(3) 2(3) 1 1(2) Mech 59023 Mech 59023 Mech 59023 Mech 56676 Mech 58992 Mech 59023 Mech 59023 Mech C C #046 Mech C C #046 Mech 59023 Mech 59023 Humboldt C&H Ent. C&H Ent. Bisco Bisco C&H Ent. C&H Ent. 003M208 085A40 LAT-DS-07078 LAT-DS-07077 LAT-DS-07076 LAT-DS-07079 MS35649-2254 MS15795-807 ACCEL CABLE SINGLE AXIS (10') ACCEL SHORTING PLUG SINGLE AXIS CABLE SUPPORT BRACKET -X -Y CABLE SUPPORT BRACKET +X +Y CABLE SUPPORT BRACKET +X -Y CABLE SUPPORT BRACKET -X +Y NUT,HEX,1/4-20 UNC WSHR,.183ID X .375OD X .049 THK 4 10 1 1 1 1 4(25) 24(50) Mech Mech Mech Mech Mech Mech Mech Mech PCB PCB ARVI Mnf. ARVI Mnf. ARVI Mnf. ARVI Mnf. Bisco Bisco TF/TW-30-TT-15 THERMOCOUPLE, 30AWG (TE WIRE) 32 Mech GC 2054531 LAT-ACD INTERFACE PIN 4(2) Mech GC 2054563 LAT-ACD INTERFACE SNUBBER 4(2) Mech GC 2054564 NAS1351N6-24 LAT-ACD INTERFACE PIN RETAINER SHCS, 3/8-24 X 1.50LG, A-286 ST 4(8) 8 Mech Mech C129009 NAS1352N08LB8 WASHER, .625 OD X .171ID X .105, A286 ST ST SHCS, #8-32 X .500L, A-286, LOCKING 408 408 Mech C C # ? Mech C C #051 58992 58992 59023 58970 58970 C C #052 C C #052 C C #052 C C #052 C C #051 C C #046 C&H Ent. C&H Ent. C&H Ent. PO status changed from "Flight" to "Non-Flight' during sign-off process; Thermo Elec. search under way to locate parts.Parts located;Qty.388 in Bldg.33 Flight Stores. Need confirmation of parts on ACD delivered hardware(Tom Borden);Spares in () verified in Bldg.33 Flight Srores Need confirmation of parts on ACD delivered hardware(Tom Borden);Spares in () verified in Bldg.33 Flight Srores Need confirmation of parts on ACD delivered hardware(Tom Borden);Spares in () verified in Bldg.33 Flight Srores On order, ECD 10/24/05 C C #051 Bisco Bisco Bisco Order placed; ECD 11/7/05, Received P/N from vendor. Updated ECD 11/9/05 On order, ECD 10/25/05; Received Bldg. 33 10/26/05 Hardware is in-place to support the current plan I&T Phase 0 IRR/TRR 10 GLAST LAT Project November 3, 2005 Risks Risk Downspout Heatpipes not properly aligned Test failures with new DAQ boxes Interference between ACD and TKR or Grid I&T performance Hardware shortages Mitigation Use bond alignment tooling Fit-check with X-LAT Plate Work closely with ELX to resolve issues real time. PDU engineer moved from ELX to I&T Numerous measurement checks completed. ACD and MECH personnel on-site during integration. Add weekend shifts as required to maintain or improve schedule performance. Weekly review of hardware availability Additional personnel added to I&T Material Logistics Risks have been anticipated and plans put in place to mitigate them I&T Phase 0 IRR/TRR 11 GLAST LAT Project November 3, 2005 Summary • Current plan is to maintain two shift operation. • Utilize weekends maintain schedule. • Procedures, Drawings, MGSE and Flight Hardware in place to support current Phase 0 plan. • Additional subsystem personnel have been identified to support LAT I&T Operations. LAT I&T is ready to proceed with ACD integration I&T Phase 0 IRR/TRR 12