GLAST LAT Project
November 3, 2005
GLAST Large Area Telescope:
Gamma-ray Large
Area Space
Telescope
Integration and Test
Phase 0 IRR/TRR
November 3-4, 2005
Mechanical Integration
Ken Fouts
[email protected]
I&T Phase 0 IRR/TRR
1
GLAST LAT Project
November 3, 2005
Key I&T Requirement Documents
Document
LAT-MD-00408-04c LAT Instrument Performance Verification
Plan
LAT-MD-02730-02d2 LAT Performance and Operations Test Plan
Released
Revision
4/7/05
6/7/05
LAT-MD-00676-04 LAT Assembly Sequence
9/1/05
LAT-MD-00895-04 LAT Instrument Survey Plan
2/1/05
LAT-DS-05210-52 LAT Systems KIT, Cable Installation
11/2/05
LAT-DS-02563-02 LAT Instrument Assembly
10/28/05
LAT-DS-06721-02 External Cable Assembly
Sign-off
LAT-DS-06639-01 LAT Integration Config Assy
10/28/05
LAT-DS-06958-02 ACD Lift Fixture
9/28/05
Requirements Definition Key to Successful I&T
I&T Phase 0 IRR/TRR
2
GLAST LAT Project
November 3, 2005
I&T Process Procedures
Document
LAT-PS-07240 ACD Integration Procedure
Released
Revision
11/2/05
LAT-PS-04911 DSHP Installation Procedure
Sign-off
LAT-PS-07575-02 LAT Instrument Safe to Mate Procedure
Sign-off
LAT-PS-07125-02 ACD Safe to Mate Procedure
10/28/05
Document Detailed Procedures for use in I&T
I&T Phase 0 IRR/TRR
3
GLAST LAT Project
November 3, 2005
Roadmap to ACD Integration and Test
Install Flight PDU
LAT-DS-02563
Install EM GASU
LAT-DS-02563
Complete Grid
Thermal Control
Installation
LAT-DS-01580
Install
Instrumentation
Accels and TC’s
LAT-DS-02563
16 Tower
CPT w/ACD
ACD Integration
LAT-PS-07240
Safe to Mate
Flight Cables for
PDU/GASU/ACD
LAT-PS-07575
Bond Downspout
Heatpipes and
Fitcheck X-LAT
Plate
LAT-PS-04911
16 Tower LAT
Optical Survey
LAT-MD-00895
16 Tower CPT
Critical steps have been identified and are in the current I&T plan
I&T Phase 0 IRR/TRR
4
GLAST LAT Project
November 3, 2005
MGSE
• LAT-DS-6958 ACD Lift Fixture
– Fit-check complete with ACD simulator
– Proof tested per LAT I&T AIDS #1588
LAT I&T ACD lift fixture fabrication and check-out complete.
I&T Phase 0 IRR/TRR
5
GLAST LAT Project
November 3, 2005
ACD Lift Fixture
I&T Phase 0 IRR/TRR
6
GLAST LAT Project
November 3, 2005
ACD Lift Fixture w/ ACD
I&T Phase 0 IRR/TRR
7
GLAST LAT Project
November 3, 2005
ACD Integration Procedure (1 of 2)
I&T Phase 0 IRR/TRR
8
GLAST LAT Project
November 3, 2005
ACD Integration Procedure (2 of 2)
I&T Phase 0 IRR/TRR
9
GLAST LAT Project
November 3, 2005
Hardware Summary
Pending Mechanical Parts To Support LAT Grid Integration 10-26-05
STOCK OR PART
NUMBER
TITLE OR DESCRIPTION
QTY
NEEDED
(ORDERED)
1
2
AR
12
6(7)
PO#
Mech
Mech
Stores
Mech
Mech
VENDOR
NOTES
LM
Humboldt
HAAS Tcm
Humboldt
C&H Ent.
Part in B-33. M. Campell to provide paperwork to get it into stores
ECD:11/2/05 Call into John dates are hard fixed.
Order Placed on 10-20-05. Stores material expires on 10-31-05
ECD:11/2/05 Call into John dates are hard fixed.
ECD: 10-26-05 Order Expedited;Received Qty.7 Bldg.33, in QC.
ECD: 10-26-05 Order Expedited;Partial delivery possible on 10/27 or full order
to deliver 10/28.
ECD: 10-26-05 Order Expedited;Received Qty.7 Bldg.33, in QC.
ECD: 10-26-05 Order Expedited;Received Qty.14 Bldg.33, in QC.
In Stores B0601 Location
ECD:11/2/05 Call into John dates are hard fixed.
ECD: 10-26-05 Order Expedited;Received Qty.9 Bldg.33, in QC.
ECD: 10-26-05 Order Expedited;Received Qty.1 Bldg.33, in QC.
Delivery Date.(10/10) Arrive SLAC(Bldg.33) 10/18/05; In QC
Delivery Date.(10/10) Arrive SLAC(Bldg.33) 10/18/05; In QC
ECD: 10-26-05 Order Expedited;Received Qty.1 Bldg.33, in QC.
ECD: 10-26-05 Order Expedited;Received Qty.1 Bldg.33, in QC.
Reqd number of accel cables audited by J.Ku/L.Lee and no additional 003M208
cables are needed.
ECD:10/18/05; checking status with vendor;Received 10/26/05 Bldg.33
Purchase Request signed, drawing not release, ECD: 11/7/05
Purchase Request signed, drawing not release, ECD: 11/7/05
Purchase Request signed, drawing not release, ECD: 11/7/05
Purchase Request signed, drawing not release, ECD: 11/7/05
Arrive SLAC(Bldg.33) 10/18/05; In QC
Arrive SLAC(Bldg.33) 10/18/05; In QC
LAT-DS-01247
LAT-DS-02878
50-02-1075-0000
LAT-DS-02443
LAT-DS-02876
X-LAT PLATE SCD
X-LAT PLATE ACCESS COVER
CHO-BOND 1075,SEALANT (CHOMERICS)
HP EMI COVER
RH HP FLANGE SPACER THREADED
LAT-DS-02877
LAT-DS-04878
LAT-DS-02875
311P18-09A10R
LAT-DS-05003
LAT-DS-06970
LAT-DS-06705
SS-600-61
SS-500-R-6
LAT-DS-07080
LAT-DS-07210
HP SHIM SET
LH HP FLANGE SPACER THREADED
HP FLANGE SPACER
THERMISTOR (YSI)
BLANKET BAR, MLI
MOUNTING PAD, ACCELEROMETER
+X EXTENSION BRACKET
BULKHEAD UNION 3/8" TUBE (SWAGELOK), ST STEEL
REDUCING UNION BODY, .375 - .3125 (SWAGELOK), ST STEEL
-X EXTENSION BRACKET
BLOCK, ACCELEROMETER MOUNTING GRID
24(26)
6(7)
12(14)
24(25)
2
7
1
2(3)
2(3)
1
1(2)
Mech
59023
Mech
59023
Mech
59023
Mech
56676
Mech
58992
Mech
59023
Mech
59023
Mech C C #046
Mech C C #046
Mech
59023
Mech
59023
Humboldt
C&H Ent.
C&H Ent.
Bisco
Bisco
C&H Ent.
C&H Ent.
003M208
085A40
LAT-DS-07078
LAT-DS-07077
LAT-DS-07076
LAT-DS-07079
MS35649-2254
MS15795-807
ACCEL CABLE SINGLE AXIS (10')
ACCEL SHORTING PLUG SINGLE AXIS
CABLE SUPPORT BRACKET -X -Y
CABLE SUPPORT BRACKET +X +Y
CABLE SUPPORT BRACKET +X -Y
CABLE SUPPORT BRACKET -X +Y
NUT,HEX,1/4-20 UNC
WSHR,.183ID X .375OD X .049 THK
4
10
1
1
1
1
4(25)
24(50)
Mech
Mech
Mech
Mech
Mech
Mech
Mech
Mech
PCB
PCB
ARVI Mnf.
ARVI Mnf.
ARVI Mnf.
ARVI Mnf.
Bisco
Bisco
TF/TW-30-TT-15
THERMOCOUPLE, 30AWG (TE WIRE)
32
Mech
GC 2054531
LAT-ACD INTERFACE PIN
4(2)
Mech
GC 2054563
LAT-ACD INTERFACE SNUBBER
4(2)
Mech
GC 2054564
NAS1351N6-24
LAT-ACD INTERFACE PIN RETAINER
SHCS, 3/8-24 X 1.50LG, A-286 ST
4(8)
8
Mech
Mech
C129009
NAS1352N08LB8
WASHER, .625 OD X .171ID X .105, A286 ST ST
SHCS, #8-32 X .500L, A-286, LOCKING
408
408
Mech C C # ?
Mech C C #051
58992
58992
59023
58970
58970
C C #052
C C #052
C C #052
C C #052
C C #051
C C #046
C&H Ent.
C&H Ent.
C&H Ent.
PO status changed from "Flight" to "Non-Flight' during sign-off process;
Thermo Elec. search under way to locate parts.Parts located;Qty.388 in Bldg.33 Flight Stores.
Need confirmation of parts on ACD delivered hardware(Tom Borden);Spares in
() verified in Bldg.33 Flight Srores
Need confirmation of parts on ACD delivered hardware(Tom Borden);Spares in
() verified in Bldg.33 Flight Srores
Need confirmation of parts on ACD delivered hardware(Tom Borden);Spares in
() verified in Bldg.33 Flight Srores
On order, ECD 10/24/05
C C #051
Bisco
Bisco
Bisco
Order placed; ECD 11/7/05, Received P/N from vendor. Updated ECD 11/9/05
On order, ECD 10/25/05; Received Bldg. 33 10/26/05
Hardware is in-place to support the current plan
I&T Phase 0 IRR/TRR
10
GLAST LAT Project
November 3, 2005
Risks
Risk
Downspout Heatpipes not properly aligned
Test failures with new DAQ boxes
Interference between ACD and TKR or Grid
I&T performance
Hardware shortages
Mitigation
Use bond alignment tooling
Fit-check with X-LAT Plate
Work closely with ELX to resolve issues real time.
PDU engineer moved from ELX to I&T
Numerous measurement checks completed.
ACD and MECH personnel on-site during integration.
Add weekend shifts as required to maintain or improve
schedule performance.
Weekly review of hardware availability
Additional personnel added to I&T Material Logistics
Risks have been anticipated and plans put in place to mitigate them
I&T Phase 0 IRR/TRR
11
GLAST LAT Project
November 3, 2005
Summary
• Current plan is to maintain two shift operation.
• Utilize weekends maintain schedule.
• Procedures, Drawings, MGSE and Flight Hardware in place to
support current Phase 0 plan.
• Additional subsystem personnel have been identified to support LAT
I&T Operations.
LAT I&T is ready to proceed with ACD integration
I&T Phase 0 IRR/TRR
12