Transcript ppt
GLAST LAT Project I&T Integration Kickoff Meeting 03/09/04 GLAST Large Area Telescope: Gamma-ray Large Area Space Telescope I&T Integration Kickoff Meeting EGSE Hardware March 9th, 2004 Ric Claus SU-SLAC Online Department Manager [email protected] 650-926-3480 Online 1 GLAST LAT Project I&T Integration Kickoff Meeting 03/09/04 Single Tower EGSE Power-PC Processor Flight Software 28-V Power Supply • • • • • • • • Processor: Motorola Power-PC Flight Software PMCIA LAT Communication Board for – LAT Communication Transition Board – Trigger TEM DAQ Assembly TEM Power-Supply Assembly 28-V Supply LAT-TD-00861 Online LCB: LAT Communication Module Transition-card: Trigger Module TEM DAQ Assembly Tower Power Supply Assembly (1.5V/2.5V/3.3V/ 0-100V/0-150V) 2 GLAST LAT Project I&T Integration Kickoff Meeting 03/09/04 Test Stand Definitions 1 X X X X X X X 2a X X X X X * * Number 2b 2c X X X X X X X X X * * X X Contents 3x 4x PC VME crate SBC LCB X board TEM TEMPS GASU (EGSE or flight) X Various combinations of EGSE SIU, EPU and external test crate X SIIS, Flight SIU and EPU, external test crate *Flight TEM/TEMPS installed in test article External crate in configs 3 and 4 has a lot of capability, but firm test requirements needing those capabilities are not defined. The crate can: 1-Run subsystem scripts 2-Run flight software 3-With the addition of a 1553 interface, can replace the SIU 4-Can “snoop” on traffic to gather intermediate data for off line analysis Online 3 GLAST LAT Project I&T Integration Kickoff Meeting 03/09/04 Single Tower EGSE Configuration (TS-1 / 2a) Online Workstation Subsystem (or simulator) CPU • Commanding • Telemetry • Monitoring AEM/TEM • Hardware Drivers LAT-COMM DC Power •External Trigger • Test Exec • Configuration • Commanding • Telemetry • Event Processing • Monitoring • Visualization • Data base • Message logger • Alerts • Electronic log Main Dataflow Ethernet Central Database WAN Back door debug RS-232 Ethernet Ethernet Router and Firewall VME Chassis External Hardware Subsystem/simulator Online Electronics/Online 4 GLAST LAT Project I&T Integration Kickoff Meeting 03/09/04 Multi-Tower EGSE (TS-2b) EGSE Crate ACD or Sensor Simulator CPU GASU WAN LCB 28 V Supply VME AEM Central Database EBM TEMs Firewall GEM Online Workstation CAL, TKR or Sensor Simulator T&DF System (LAT) Online SLAC EGSE 5 GLAST LAT Project I&T Integration Kickoff Meeting 03/09/04 ACD or Sensor Simulator GASU SIU Spacecraft simulator CPU Discretes 1553 1553 LCB 28 V Supply EBM GEM 3 EPUs TEMs Test Point on LAT EMI Skirt Firewall CPU LCB LAT Central Database SSR AEM CAL, TKR or Sensor Simulator WAN LAT Assembly Configuration (TS-3x) Online Workstation EGSE Crate CPU LCB SLAC EGSE Online 6 GLAST LAT Project I&T Integration Kickoff Meeting 03/09/04 ACD GASU SIU Spacecraft simulator CPU Discretes 1553 1553 LCB 28 V Supply AEM Central Database SSR EBM GEM 3 EPUs TEMs Test Point on LAT EMI Skirt Firewall CPU LCB CAL, TKR WAN Complete Flight Unit Configuration (TS-4x) Online Workstation EGSE Crate CPU LCB LAT SLAC EGSE Online 7 GLAST LAT Project I&T Integration Kickoff Meeting 03/09/04 Flight Unit On-Orbit Configuration ACD GASU CPU Discretes 1553 1553 LCB 28 V Supply WAN SIU Spacecraft Central Database SSR AEM GEM 3 EPUs Firewall EBM CPU LCB TEMs CAL and TKR LAT Test Point on LAT EMI Skirt IOC Workstation (Flight cover installed Green Tag item) SLAC MOC Online 8 GLAST LAT Project I&T Integration Kickoff Meeting 03/09/04 Test Stand vs Test Test description Power EGSE s/w FSW Tracker or Cal receiving test Stand No. 1 Bench >=LATTE 2 TKR installation in EM single bay 1 Bench >=LATTE 2 ACD receiving test Cal/TEM/TEMPS integration 2c 2a Bench ? Bench TBD LATTE 2+ Tower integration in EM Single Bay and in grid 2+ towers in grid through GASU and PDU installation, can be used up to launch for low level tests including ACD Tests EPU and SIU after installation, including before all 16 towers are integrated Full up LAT testing 2a Bench LATTE 2+ EM1(register drivers + event support + …) EM1(register drivers + event support + …) TBD EM1’ (adds monitoring, housekeeping, config support) EM1’ 2b EM or flight PDU LATTE 3 3x EM or flight PDU LATTE 3 EM2 (PDU support, power up, queuing support, CCSDS packets) TBD (EM2+, FSW?) 4x Flight PDU TBD Flight Software Online 9 GLAST LAT Project I&T Integration Kickoff Meeting 03/09/04 EGSE Need Milestones AV Activity ID ND Activity Description AV: Early FloatFloat Finish -2m -1m Baseline Finish Early Finish FY 04 Q1 Q2 Q3 4.1.7 Ele ctro nic s 4.1 .9 I& T 7 1M7941130 9 EGSE TEM/TEM PS/CTS w/ FE Elec #1-Elec to I&T 01/20/04 -42 12/08/03 02/17/04 7 1M7941150 9 EGSE TEM/TEM PS/CTS w/ FE Elec #2-Elec to I&T 02/12/04 -41 12/22/03 03/01/04 7 1M7941160 9 EGSE TEM/TEM PS/CTS w/ FE Elec #3-Elec to I&T 02/20/04 -41 01/07/04 03/08/04 7 1M7941170 9 EGSE TEM/TEM PS/CTS/GASU FE 02/27/04 -41 01/14/04 03/15/04 7 1M7941180 9 EGSE Development Hrdw/FSW 1st Delivr-Elec 02/27/04 -36 01/22/04 03/15/04 7 1M7941190 9 EGSE TEM/TEM PS/CTS #1 for Bldg 33-Elec to I&T 03/12/04 -41 01/29/04 03/29/04 7 1M7941420 9 EGSE TEM/TEM PS/CTS #2 for Bldg 33-Elec to I&T 03/19/04 -41 02/05/04 04/05/04 7 1M7941430 9 EGSE TEM/TEM PS/CTS w/ GASU for B33-Elec to 03/19/04 -41 02/05/04 04/05/04 This item includes an EM-2 TEM, a TEM Power Supply, a Crate Test System with LCB and Front-end Electronics (shared). It is to be used by Ric Claus for development of Online software. This item includes an EM-2 TEM, a TEM Power Supply, a Crate Test System with LCB and Front-end Electronics (shared). It is to be used by Selim Tuvi for development of Online software. This item includes an EM-2 TEM, a TEM Power Supply, a Crate Test System with LCB and Front-end electronics (shared). It is is to be used by Jim Panetta for development of Online software. This item includes a Crate Test System, an EM GASU and Front-end Electronics (shared). It is to be used by Ric Claus for development of Online software. This item includes an Early Release of Flight Software and Hardware interfaces. It is to be used by Ric Claus for development of Online software for full LAT testing through SIU. Run Date Data Date 02/09/04 11:06 G LA ST L A T PR OJ EC T LT-99: I&&T EGSE MIlestones Report #9 Sheet 1 FL-19 E GS E I& &T milestones Le ve l 3 M ile sto nes This item includes an EM-2 TEM,02/01/04 a TEM Power Supply, a Crate Test System with LCB . It is to be used in the building 33 room 103 Integration Test Facility. AV : Up Triangle, L3: Down Triangl e © Primavera Systems, Inc. A V: F loa t This item includes an EM-2 TEM, a TEM Power Supply, a Crate Test System with LCB . It is to be used in the building 33 room 103 Integration Test Facility. This item includes a Crate Test System with LCB, EM GASU and EM PDU. It is to be used in the building 33 room 104 Integration Test Facility for single and multitower tests during integration. Online 10