Transcript ppt
GLAST LAT Project I&T Integration Kickoff Meeting 03/09/04 GLAST Large Area Telescope: Gamma-ray Large Area Space Telescope I&T Integration Kickoff Meeting MGSE March 9th, 2004 Eric M. Gawehn SU-SLAC MGSE Department Manager [email protected] 650 – 926 – 3622 Office 650 – 796 – 2576 Cell LAT I&T MGSE Page 1 of 11 GLAST LAT Project I&T Integration Kickoff Meeting 03/09/04 AGENDA • MGSE Required for Assembly / Disassembly of the LAT ( SLAC Ops ) – Hardware List • Long Lead Items – Status – Readiness Verification • Procedures – List – Training • Schedule LAT I&T MGSE Page 2 of 11 GLAST LAT Project I&T Integration Kickoff Meeting 03/09/04 LAT MGSE Hdwr List, Cont. • Long Lead Items • • • • • • • • LAT 4 x 4 Rotation / Support Stand (including drive system and flex coupling) Personnel Access Platform { Interfaces to Rotation Stand Weldment } GPR and GPR to Grid attach bracketry Support Shaft-Flange Assemblies, GPR to Rotation / Support Stand LAT Z Axis Vertical Lift Fixture LAT Z Axis Horizontal Lift Fixture Proof test weights for LAT Lift Fixture, GPR, GPR to Grid brackets, Support Shaft Flange Assemblies and Rotation Stand 1x4 Lift Fixture • Short Lead Items • • • • • • • CAL –Z Up Lift Fixture, Complete and Ready for Use CAL +Z Up Lift Fixture TKR Lift Fixture – Provided by TKR TKR Alignment System Crane Scale; Being Modified; Will Require Re-Calibration CAL Alignment Tool EM-2 Single Bay Mod ( Updated TKR Interface Plate ) - Items Needed at Integration Start LAT I&T MGSE - Provided by Other Group, or Needed Later Page 3 of 11 GLAST LAT Project I&T Integration Kickoff Meeting 03/09/04 LAT MGSE Hdwr List, Cont. • Short Lead Items, Continued • • • • • • • • • • • • • CAL Alignment Rods TKR to TKR No Touch During Ascent Verification Tool CAL Inversion Stand Metrology Bay for Shimming E-Box Height with respect to CAL Grid Interface TWR ( TKR, CAL, TEM, TEM PS ) Mass Simulators Lift Fixture relocation dollies; Use Lead Stack dollies from EM Series LAT Z Axis Horizontal Support Braces / Counterweight Moment Arms Menning Plate Installation Equipment Interim Integration E-Box support brackets TBD ACD Low Profile Integration Stand Brackets to hold Lift Fixture Spreaders on top of Bonded Stores Containers Ambient Test Thermal Control System 1 x 4 EM-Calibration Unit Rotation Stand - Items Needed at Integration Start LAT I&T MGSE - Provided by Other Group, or Needed Later Page 4 of 11 GLAST LAT Project I&T Integration Kickoff Meeting 03/09/04 LAT MGSE Images LAT I&T MGSE Page 5 of 11 GLAST LAT Project I&T Integration Kickoff Meeting 03/09/04 LAT MGSE Images LAT I&T MGSE Page 6 of 11 GLAST LAT Project I&T Integration Kickoff Meeting 03/09/04 LAT MGSE Images ACD Low Profile Integration Stand ACD on 8’ by 8’ Dolly Integration Stand is Placed to Allow Range of Motion for PAPs LAT I&T MGSE Page 7 of 11 GLAST LAT Project I&T Integration Kickoff Meeting 03/09/04 MGSE Status Tracking Matrix LAT I&T MGSE Page 8 of 11 GLAST LAT Project I&T Integration Kickoff Meeting 03/09/04 MGSE Status Tracking Matrix LAT I&T MGSE Page 9 of 11 GLAST LAT Project I&T Integration Kickoff Meeting 03/09/04 LAT MGSE Procedures • Assemble MGSE Per Design Drawings – Procedures will point to drawings – Procedures will capture trace ability for installation of Certified Fasteners • Special Procedures and Travelers for Qualification Steps • Training Procedures to ensure team is ready – 4x4 Integration Stand • For Range of Motion Checks Prior to PAP Relocation Events – Lift Fixtures – Stand Relocations in Rm 104 – Shipment Preps LAT I&T MGSE Page 10 of 11 GLAST LAT Project I&T Integration Kickoff Meeting 03/09/04 LAT MGSE Subsystem Schedule LAT I&T MGSE Page 11 of 11