MGSE
March 9th, 2004
Eric M. Gawehn
SU-SLAC
MGSE Department Manager
[email protected]
650 – 926 – 3622 Office
650 – 796 – 2576 Cell
LAT I&T MGSE
Page 1 of 11
GLAST LAT Project
I&T Integration Kickoff Meeting 03/09/04
AGENDA
• MGSE Required for Assembly / Disassembly of the LAT ( SLAC Ops )
– Hardware List
• Long Lead Items
– Status
– Readiness Verification
• Procedures
– List
– Training
• Schedule
LAT I&T MGSE
Page 2 of 11
GLAST LAT Project
I&T Integration Kickoff Meeting 03/09/04
LAT MGSE Hdwr List, Cont.
• Long Lead Items
•
•
•
•
•
•
•
•
LAT 4 x 4 Rotation / Support Stand (including drive system and flex coupling)
Personnel Access Platform { Interfaces to Rotation Stand Weldment }
GPR and GPR to Grid attach bracketry
Support Shaft-Flange Assemblies, GPR to Rotation / Support Stand
LAT Z Axis Vertical Lift Fixture
LAT Z Axis Horizontal Lift Fixture
Proof test weights for LAT Lift Fixture, GPR, GPR to Grid brackets, Support
Shaft Flange Assemblies and Rotation Stand
1x4 Lift Fixture
• Short Lead Items
•
•
•
•
•
•
•
CAL –Z Up Lift Fixture, Complete and Ready for Use
CAL +Z Up Lift Fixture
TKR Lift Fixture – Provided by TKR
TKR Alignment System
Crane Scale; Being Modified; Will Require Re-Calibration
CAL Alignment Tool
EM-2 Single Bay Mod ( Updated TKR Interface Plate )
- Items Needed at Integration Start
LAT I&T MGSE
- Provided by Other Group, or Needed Later
Page 3 of 11
GLAST LAT Project
I&T Integration Kickoff Meeting 03/09/04
LAT MGSE Hdwr List, Cont.
• Short Lead Items, Continued
•
•
•
•
•
•
•
•
•
•
•
•
•
CAL Alignment Rods
TKR to TKR No Touch During Ascent Verification Tool
CAL Inversion Stand
Metrology Bay for Shimming E-Box Height with respect to CAL Grid Interface
TWR ( TKR, CAL, TEM, TEM PS ) Mass Simulators
Lift Fixture relocation dollies; Use Lead Stack dollies from EM Series
LAT Z Axis Horizontal Support Braces / Counterweight Moment Arms
Menning Plate Installation Equipment
Interim Integration E-Box support brackets TBD
ACD Low Profile Integration Stand
Brackets to hold Lift Fixture Spreaders on top of Bonded Stores Containers
Ambient Test Thermal Control System
1 x 4 EM-Calibration Unit Rotation Stand
- Items Needed at Integration Start
LAT I&T MGSE
- Provided by Other Group, or Needed Later
Page 4 of 11
GLAST LAT Project
I&T Integration Kickoff Meeting 03/09/04
LAT MGSE Images
LAT I&T MGSE
Page 5 of 11
GLAST LAT Project
I&T Integration Kickoff Meeting 03/09/04
LAT MGSE Images
LAT I&T MGSE
Page 6 of 11
GLAST LAT Project
I&T Integration Kickoff Meeting 03/09/04
LAT MGSE Images
ACD Low
Profile
Integration
Stand
ACD on
8’ by 8’
Dolly
Integration
Stand is Placed
to Allow Range
of Motion for
PAPs
LAT I&T MGSE
Page 7 of 11
GLAST LAT Project
I&T Integration Kickoff Meeting 03/09/04
MGSE Status Tracking Matrix
LAT I&T MGSE
Page 8 of 11
GLAST LAT Project
I&T Integration Kickoff Meeting 03/09/04
MGSE Status Tracking Matrix
LAT I&T MGSE
Page 9 of 11
GLAST LAT Project
I&T Integration Kickoff Meeting 03/09/04
LAT MGSE Procedures
• Assemble MGSE Per Design Drawings
– Procedures will point to drawings
– Procedures will capture trace ability for installation of Certified
Fasteners
• Special Procedures and Travelers for Qualification Steps
• Training Procedures to ensure team is ready
– 4x4 Integration Stand
• For Range of Motion Checks Prior to PAP Relocation Events
– Lift Fixtures
– Stand Relocations in Rm 104
– Shipment Preps
LAT I&T MGSE
Page 10 of 11
GLAST LAT Project
I&T Integration Kickoff Meeting 03/09/04
LAT MGSE Subsystem Schedule
LAT I&T MGSE