Transcript ppt
GLAST LAT Project I&T Integration Kickoff Meeting 03/09/04 GLAST Large Area Telescope: Gamma-ray Large Area Space Telescope I&T Integration Kickoff Meeting Overview March 9th, 2004 Pat Hascall SLAC System Engineering Manager [email protected] 650-926-4266 LAT System Engineering 1 GLAST LAT Project I&T Integration Kickoff Meeting 03/09/04 Topics • • • • Test plan flow Strategy for completion Documentation Schedules LAT System Engineering 2 GLAST LAT Project I&T Integration Kickoff Meeting 03/09/04 Test Planning Flow Test Plan Flow Test Flow Pat Hascall Feb 9, 2004 Test Flow Mechanical Subsystem Test Plan LAT-TD-00493 LAT Instrument Performance Verification Plan LAT-MD-00408 LAT Flight Software Test Plan LAT-TD-00786 SVAC Plan LAT-MD-00446 LAT Environmental Test Sequence LAT-MD-02717 LAT Assembly Sequence LAT-MD-00676 Thermal System Test Plan LAT-TD-tbd Work Orders Work Orders Electronics Test Plan LAT-TD-00296 Tracker Tower Test Plan LAT-TD-00155 Test definitions Calorimeter Test Plan LAT-TD-00262 High Level Test Plans ACD Test Plan ACD-PLAN000050 LAT Performance and Operations Test Plan LAT-MD-02730 Test Toolbox -Comprehensive Test Proc -Functional Test Proc -Mechanical Procedures -Lower level generic procedures LAT Integration and Test Plan LAT-MD-01376 Test Proc Integration Test Proc Comp. Test Proc Commisioning LAT Instrument Survey Plan LAT-MD-00895 Survey Proc Mass/ CG Proc Comp. Test Proc EMI/ EMC Proc Dynamics Proc Comp. Test Proc Thermal Vac Proc Comp. Test Proc Mass/ CG Proc Envir. Test LAT Weight and CG Measurement Plan LAT-MD-01598 LAT EMI/EMC Plan LAT-MD-0xxxx LAT Dynamics Plan LAT-MD-01196 LAT Thermal Test Plan LAT-MD-01600 Required Tests Per Phase MAR Generic Test Requirements Test Flow Other notes/issues 1-Van De Graf test, how and where does it fit 2-The science cal plan calls for EM tests, not covered under this flow 3-How does Steve Ritz data flow verification fit into this plan? 4-Where are algorithms for EGSE software (and SAS software) specified? They need to be consistent Required Tests Per Phase Generic Processes and Requirements Other plans/procedures that are valuable resources: LAT Integration and Test Subsystem Electrical Performance Test Plan (Wai-LAT-MD-01055) GLAST LAT I&T Testing Requirements Document - (Claus - LAT -TD-02834) LAT SVAC Test Requirements Plan (Eduardo, LAT-MD-01587) Sequencing Test Specific Rqmts LAT System Engineering 3 GLAST LAT Project I&T Integration Kickoff Meeting 03/09/04 Strategy for Completion • Phased approach to provide planning necessary for first 6 months of integration • Focus is on Calorimeter and Tracker first, followed by DAQ boxes, then ACD LAT System Engineering 4 GLAST LAT Project I&T Integration Kickoff Meeting 03/09/04 Near Term Test Planning Flow Test Flow Mechanical Subsystem Test Plan LAT-TD-00493 LAT Instrument Performance Verification Plan LAT-MD-00408 LAT Assembly Sequence LAT-MD-00676 Thermal System Test Plan LAT-TD-tbd LAT Flight Software Test Plan LAT-TD-00786 SVAC Plan LAT-MD-00446 Work Orders Electronics Test Plan LAT-TD-00296 Tracker Tower Test Plan LAT-TD-00155 Test definitions Calorimeter Test Plan LAT-TD-00262 High Level Test Plans ACD Test Plan ACD-PLAN000050 LAT Performance and Operations Test Plan LAT-MD-02730 Test Toolbox -Comprehensive Test Proc -Functional Test Proc -Mechanical Procedures -Lower level generic procedures Test Proc Test Proc Integration LAT Integration and Test Plan LAT-MD-01376 LAT System Engineering 5 GLAST LAT Project I&T Integration Kickoff Meeting 03/09/04 LAT Assembly Sequence • LAT Assembly Sequence LAT-MD-00676 – Contents • Defines in detail the sequence of operations necessary to integrate the LAT • Focuses on mechanical operations, and calls out electrical tests to be run from separate procedures – Status • Draft completed, some refinement needed – Schedule • Personnel reprioritized, ETC TBD • Mitigation – Sufficient detail available to proceed, remaining work is primarily clean up LAT System Engineering 6 GLAST LAT Project I&T Integration Kickoff Meeting 03/09/04 LAT Performance and Operations Test Plan • LAT Performance and Operations Test Plan LAT-MD-02730 – Contents • Defines at a high level each of the individual tests (e.g. TE103, Tracker Bias Current) • Define when the test will be run (Functional Test, Comprehensive Test, Integration test …) – Status • Draft initiated (samples on next viewgraphs) • Details worked in weekly meetings with I&T and subsystems • Will include definition of 2 tower test derived from End-to-End Committee results – Schedule • First cut out by end of month as part of an incremental release series • Mitigation – Information generated by a team effort (including members of End-to-End Committee), so test development can proceed in parallel LAT System Engineering 7 GLAST LAT Project I&T Integration Kickoff Meeting 03/09/04 Test Definition Sample • Tracker GTRC configuration register and readback – The GTRC chips are sequentially addressed and their configuration registers loaded with a bit pattern. Each time the register is read back and checked for errors. The test is repeated with the complement of the bit pattern. The test then is repeated with a broadcast address for writing the register, followed by sequential readback. (Based on Tracker Test TE201) • FSW Tracker Configuration Test – This test shall verify the ability of the SIU to configure the TKR subsystem as desired and read back the necessary configuration information to completely determine the TKR subsystem configuration (Based on FSW test 7b) LAT System Engineering 8 GLAST LAT Project I&T Integration Kickoff Meeting 03/09/04 Test Instance Format Sample ID Two Tower … Test Incoming Tower Comp. Power Consumption X X X Temperature X X X Leakage Current X X X GTRC configuration X X X GFTE left/right configuration X X X GFTE split configuration X X X Reset X X Threshold Scan X X X X Charge Injection Scan X Gain and Noise X X X X Layer Timing X X X X Occupancy X X X X Occupancy w/readout X X X X Muon Scan X X High Rate/ Deadtime X X X X X X … Combined Charge Injection Scan … FSW Tracker Configuration Test LAT System Engineering X 9 GLAST LAT Project I&T Integration Kickoff Meeting 03/09/04 Integration Drawings • Integration Drawings – Contents • Defines how the pieces delivered to I&T relate and provides some assembly information • In some cases, provide a model with internal details removed to facilitate model usage (outline drawings) – Status • Drawing tree defined • Model and drawing completion on hold – Schedule • Will take approximately 2 months after effort is restarted to complete model integration and drawings • Mitigation – Many of the models can be used now to get views necessary for integration procedures LAT System Engineering 10 GLAST LAT Project I&T Integration Kickoff Meeting 03/09/04 Drawing Tree LAT Level Drawing Tree LAT-DS-01624 LAT Assembly Drawing Rev 5 Jan 15, 2004 LAT-DS-01628 -Y Radiator Outline Drawing LAT-DS-TBD01 MLI Pat Hascall LAT-DS-01629 +Y Radiator Outline Drawing LAT-DS-02563 LAT Instrument Assembly LAT-DS-TBDxx X-LAT Plate Assembly Outline Drawing LAT-DS-02443 Heat Pipe EMI Cover LAT-DS-01626 Anticoincidence Detector Assembly LAT-DS-02111 Cable Assy, DAQACD External LAT-DS-01247 X-LAT Plate Assembly LAT-DS-2812 ACD to Temperature Sensor Bracket LAT-DS-02110 ACD to RF Shield (telemetry) LAT-TBD41 Bracket Assy, Temperature Sensor LAT-DS-02137 Assembly,Heater Control Interface Box LAT-DS-02109 Heater Control Interface, Box to RF Shield LAT-DS-TBD15 MLI 2054500 Anticoincidence Detector LAT-DS-02561 LAT Tower and Electronics Assembly LAT-DS-02562 LAT Internal Cable Assy LAT-DS-01494 GASU Spider LAT-DS-01696 Power Distribution Unit LAT-DS-01264 EMI Skirt Connector Panel1 LH +X LAT-DS-01862 SIU Assembly LAT-DS-02533 EPU Assembly LAT-DS-01611 GASU Box Assembly LAT-DS-01988 EMI Skirt Connector Panel2 RH +X LAT-DS-01989 EMI Skirt Connector Panel3 LH -Y LAT-DS-01990 EMI Skirt Connector Panel4 LH -Y LAT-DS-01734 Support, Cable Way LAT-DS-01487 Flange Screw LAT-DS-01741 Upper Tray, Narrow, Cable Way LAT-DS-02560 LAT Tower Assembly Drawing LAT-DS-02211 Cable Guide, +Y Side, Thermal Shunt LAT-DS-02559 CAL-TEM-PS Module Assembly LAT-DS-01643 Assembly, Tower Electronics Module/Power Supply LAT-DS-01735 Two Way Transition, Cable Way LAT-DS-01742 Standoff Modification, Cable Way LAT-DS-02212 Cable Guide, -Y Side, Thermal Shunt LAT-DS-01580 Grid Box Base Assembly LAT-DS-01554 Calorimeter -TEM Standoff LAT-DS-01625 Calorimeter Module Outline Drawing LAT-DS-01736 Three Way Transition, Cable Way LAT-DS-02192 Lower Tray End, Cable Way LAT-DS-02213 Bottom Top Cable Block LAT-DS-1627 Tracker Module Outline Drawing LAT-DS-01392 LH Down Spout Heat Pipe SCD LAT-DS-02004 LH Heat Pipe Patch Panel LAT-DS-02005 RH Heat Pipe Patch Panel LAT-DS-02003 X Center EMI Shield LAT-DS-02007 RH X EMI Shield LAT-DS-02006 LH X Emi Shield LAT-DS-02002 Center EMI Shield LAT-DS-02179 Empty Box LAT-DS-01991 EMI Skirt Connector Panel6 LH -X LAT-DS-01737 Four Way Transition, Cable Way LAT-DS-01992 EMI Skirt Connector Panel6 RH -X LAT-DS-01738 Lower Tray, Short, Cable Way LAT-DS-02194 Upper TrayNarrow End, Cable Way LAT-DS-02193 Upper Tray-Wide End, Cable Way LAT-DS-02214 Middle Cable Block LAT-DS-01391 RH Down Spout Heat Pipe SCD LAT-DS-02215 Cover Plate +Y Side Thermal Shunt LAT-DS-02576 LH Corner Shear Plate LAT-DS-01993 EMI Skirt Connector Panel7 LH +Y LAT-DS-01739 Lower Tray, Long, Cable Way LAT-DS-02195 Baseplate, Cable Way LAT-DS-01994 EMI Skirt Connector Panel8 LH +Y LAT-DS-02092 Cable Assy, DAQACD Internal LAT-DS-02099 Cable Assy, DAQ/ SIU-Spacecraft Power LAT-DS-01740 Upper Tray, Wide, Cable Way LAT-DS-02196 Baseplate Standoff Modification, Cable Way LAT-DS-02093 Cable Assy, DAQSpacecraft 1PPS LAT-DS-02100 Cable Assy, DAQ/ PDU-VHCP Temp Monitor LAT-DS-02094 Cable Assy, DAQSpacecraft 1553 LAT-DS-02101 Cable Assy, DAQ/ PDU-Radiator Temp Monitor LAT-DS-02102 Cable Assy, DAQ/ PDU-ACD Bea Temp Monitor LAT-DS-02106 Cable Assy, DAQ/ TEM-GASU Command LAT-DS-02333 Support Post, Cable Way LAT-DS-02096 Cable Assy, DAQ/ PDU-Spacecraft Power LAT-DS-02095 Cable Assy, TEM PDU Power LAT-DS-02103 Cable Assy, DAQ/ PDU-GASU Command and Power LAT-DS-02107 Cable Assy, Grid Temp Base Plate LAT-DS-02097 Cable Assy, DAQ/ SIU-Spacecraft Discrete LAT-DS-02104 Cable Assy, DAQ/ SIU-GASU Communications LAT-DS-02098 Cable Assy, DAQ/ SIU-Radiator Heater Control LAT-DS-02105 Cable Assy, DAQ/ SIU-PDU Command LAT-DS-02108 Cable Assy, DAQ/ EPU-PDU Power LAT-DS-02216 Cover Plate -Y Side Thermal Shunt LAT-DS-02577 RH Corner Shear Plate LAT-DS-02578 Quarter Point Shear Plate LAT-DS-02579 Center Shear Plate LAT-DS-02581 CAL Plate Washer LAT-DS-02651 Dowel Pin, 0.25 OD by .875 L LAT-DS-02653 Dowel Pin, 0.375 OD by .875 L LAT-DS-02493 Corner Pin Retainer LAT-DS-02494 Quarter Point Pin Retainer LAT-DS-02495 Center Pin Retainer LAT-DS-00722 Tracker Module Assembly Xxx Calorimeter LAT-DS-01481 Tower Electronics Module LAT-DS-01482 Tower Power Supply LAT System Engineering 11