GLAST LAT Project
3-4 May 2005
LAT Environmental Test Planning and Design Review
3-4 May 2005
Logistics
Martin Nordby
LAT Environmental Test PDR
1
GLAST LAT Project
3-4 May 2005
Environmental Test Logistics Planning
•
•
Still in the early stages of logistics planning
Major issues at-hand (in rough order of decreasing impact)
– Cleanliness and contamination control: the A-59 high and test facilities are NOT clean
rooms  started working on contamination issues with GLAST contamination control
lead
•
•
–
–
–
CPT’s and LPT’s are still a not fully defined  final definitions of these will impact test
durations (see charts to follow)
Defining required pre-test checking/test runs of LAT EGSE and facility data acquisition
system  this impacts the off-critical path schedule and drives need dates for EGSE and
facility systems
System safety and flight hardware protection
•
•
•
What are controls needed for fully-integrated LAT
What are protocols that need to be implemented at NRL to meet these controls
Mechanical: hoisting and rigging requirements per LAT req’s from SLAC and NRL policy
Electrical: once power and conditioning needs are understood, we will address protections
– Personnel protection, access, and workspace needs and availabilities: not started
Staffing plans (see charts to follow)
– Started putting together personnel list for each test
– Staffing plans are less well understood: these will combine personnel lists with test
schedules based on the tests scoped in the Test Plans
LAT Environmental Test PDR
2
GLAST LAT Project
3-4 May 2005
LAT Level CPT Time Estimate
•
LAT Level Comprehensive Performance Test (CPT) Time Estimate
– Estimate is 90.5 hrs of test time
•
•
•
Does not include assumptions for overhead
Does not include SVAC runs
Basis of Estimate
– Single tower test run time actuals
•
•
•
–
–
–
Identified LAT Level test cases that will sell all requirements and validate all functions
Engineering judgment was used to estimate the time required for each test case
Assumes a high degree of parallel testing of the Detector Subsystems
•
•
–
Unfortunately these actuals may or may not apply since there is uncertainty as to the effect of
testing multiple towers in parallel
Data will not be available on parallel tower test until 4 Tower testing (late May – early April)
Data only available for CAL and TKR testing
I&T has taken this as a requirement and is currently working on a solution to make this happen
Will have a better idea that parallel test of the Detectors is feasible by 4 Tower test
Assumes Flight Software tools are used (Config files, LCI, Event Handling) to conduct
almost all tests
LAT Environmental Test PDR
3
GLAST LAT Project
3-4 May 2005
LAT Level CPT Test Cases (1 of )
Group
Test Title
Time
Estimate
(Hrs)
LAT Level Tests
LAT Level
LAT Level
LAT Level
LAT Level
LAT Level
LAT Level
LAT Level
LAT Level
LAT Level
LAT Level
LAT Level
LAT Level
LAT Level
LAT Level
LAT Level
LAT Level
LAT Level
LAT Level
LAT Level
LAT Level
LAT Level
LAT Level
LAT Level
LAT Level
LAT Level
LAT Level
LAT Level
LAT Level
LAT Level
LAT Level
LAT Level
LAT Level
LAT Level
LAT Level
LAT Environmental Test PDR
LAT001 – LAT Config 1 Initialization
LAT002 – LAT Config 2 Initialization
LAT003 – LAT Config 3 Initialization
LAT004 – LAT Config 4 Initialization
LAT005 – LAT Config 5 Initialization
LAT006 – LAT Config 6 Initialization
LAT011 – LAT Config 1 Power Off
LAT012 – LAT Config 2 Power Off
LAT013 – LAT Config 3 Power Off
LAT014 – LAT Config 4 Power Off
LAT015 – LAT Config 5 Power Off
LAT016 – LAT Config 6 Power Off
LAT021 – LAT Config 1 Reinitialization
LAT022 – LAT Config 2 Reinitialization
LAT023 – LAT Config 3 Reinitialization
LAT024 – LAT Config 4 Reinitialization
LAT026 – LAT Config 6 Reinitialization
LAT031 – LAT Config 1 Narrowband Telemetry
LAT032 – LAT Config 2 Narrowband Telemetry
LAT033 – LAT Config 3 Narrowband Telemetry
LAT034 – LAT Config 4 Narrowband Telemetry
LAT035 – LAT Config 5 Narrowband Telemetry
LAT036 – LAT Config 6 Narrowband Telemetry
LAT041 – LAT Config 1 Cmd & Cmd Response
LAT042 – LAT Config 2 Cmd & Cmd Response
LAT043 – LAT Config 3 Cmd & Cmd Response
LAT044 – LAT Config 4 Cmd & Cmd Response
LAT045 – LAT Config 5 Cmd & Cmd Response
LAT046 – LAT Config 6 Cmd & Cmd Response
LAT051 – LAT Config 1 Wideband Telemetry
LAT052 – LAT Config 2 Wideband Telemetry
LAT053 – LAT Config 3 Wideband Telemetry
LAT054 – LAT Config 4 Wideband Telemetry
LAT055 – LAT Config 5 Wideband Telemetry
1
1
1
1
1
1
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.5
0.25
0.25
0.25
0.25
1
1
0.25
0.25
0.25
0.25
0.5
0.5
0.5
0.5
0.5
4
GLAST LAT Project
3-4 May 2005
LAT Level CPT Test Cases (2 of 2)
Group
Test Title
Time
Estimate
(Hrs)
LAT Level Tests
LAT Level
LAT Level
LAT Level
LAT Level
LAT Level
LAT Level
LAT Level
LAT Level
LAT Level
LAT Level
LAT Level
LAT Level
LAT Level
LAT Level
LAT Level
LAT Level
LAT Level
LAT Level
LAT Level
LAT Level
LAT Level
LAT Level
LAT Level
LAT Level
LAT Level
LAT Level
LAT Level
LAT Level
LAT Level
LAT Level
LAT Level
LAT Environmental Test PDR
LAT061 – LAT Config 1 File Management
LAT062 – LAT Config 2 File Management
LAT071 – LAT Config 1 Configuration File Test
LAT072 – LAT Config 2 Configuration File Test
LAT081 – LAT Config 1 Safe Modes
LAT082 – LAT Config 2 Safe Modes
LAT091 – LAT Config 1 Charge Injection Functional
LAT092 – LAT Config 2 Charge Injection Functional
LAT101 – LAT Config 1 Science Modes
LAT102 – LAT Config 2 Science Modes
LAT111 – LAT Config 1 Backdoor Functional
LAT112 – LAT Config 2 Backdoor Functional
LAT121 – LAT/Spacecraft Interface Config 1 Test
LAT122 – LAT/Spacecraft Interface Config 2 Test
LAT150 – LAT Survival Heater Test
LAT151 – LAT Config 1 Temp Control
LAT152 – LAT Config 2 Temp Control
LAT201 – LAT Config 1 Detector Threshold
LAT202 – LAT Config 2 Detector Threshold
LAT211 – LAT Config 1 Detector Functions
LAT212 – LAT Config 2 Detector Functions
LAT221 – LAT Config 1 Diagnostic Mode
LAT222 – LAT Config 2 Diagnostic Mode
LAT231 – LAT Config 1 Timing Measurement & Adjust
LAT232 – LAT Config 2 Timing Measurement & Adjust
LAT241 – LAT Config 1 Instrument Calibration
LAT232 – LAT Config 2 Instrument Calibration
LAT251 – LAT Config 1 Event Filtering & Pointing
LAT252 – LAT Config 2 Event Filtering & Pointing
LAT261 – LAT Config 1 GRB Handling
LAT262 – LAT Config 2 GRB Handling
1
1
2
2
0.5
0.5
2
2
1
1
1
1
1
1
0.5
4
4
4
4
2
2
4
4
4
4
4
4
4
4
1
1
90.5
5
GLAST LAT Project
3-4 May 2005
Key Personnel
•
•
All key personnel have been identified and are actively working on test preparations
In addition to test-specific personnel, there a number of functional support people
– Functional Support Leads
•
•
•
•
•
•
•
•
Test Personnel
LAT functional test planning: Rich Baun
Facilities manager: Bill Raynor
Logistics: Martin Nordby
Data systems coordination: Brian Grist
MGSE: Marc Campell (with Martin Nordby)
EGSE: Mike Huffer (with Rich Bielawski)
Test software: Ric Claus
Utility infielder: Neil Johnson
High-Bay
Sine Vibe
EMI/EMC
Acoustic
Micheal Lovellette
Test Director
Paul Dizon (NRL) John Ku (SLAC)
John Ku (SLAC)
(NRL)
Test conductor
--Bob Haynes (NRL) Mike Obara (NRL) Bob Haynes (NRL)
John Ku (SLAC)
John Ku (SLAC)
Rich Bielawski
Discipline leads
Jim Haughton (NRL)
Jim Haughton (NRL) (SLAC)
Chris Fransen (GSFC)
T-Vac
Martin Nordby (SLAC)
[Jack Goodman (SLAC)]
Mike VanHerpe (NRL)
Jeff Wang (LM)
Key Test Personnel
LAT Environmental Test PDR
6
GLAST LAT Project
3-4 May 2005
Staffing Plan
SLAC and NRL personnel required to staff testing
This will be populated as the test plans are finalized
LAT Environmental Test PDR
T-Vac
Acoustic
EMI/EMC
Sine Vibe
Personnel
LAT mech tech
LAT elec tech
NRL operations
LAT elec engineer
LAT struc engineer
LAT thermal
NRL test specialists
LAT QA
NRL QA
Total
Approx Duration (m)
Total MM
High-Bay Ops
Environmental Test Personnel Loading
Ship/Receive
•
•
7
GLAST LAT Project
3-4 May 2005
QA Support Plans
•
•
•
QA support of all testing and operations at NRL will largely be treated as an extension of LAT
work done at SLAC
– This ensures that environmental testing dovetails with the current QA dataset and
protocols already in use for LAT integration
– It avoids the need to develop a separate system using NRL procedures
QA personnel
– SLAC will provide day-shift QE support on the floor at NRL for the duration of the test
program
– SLAC will provide on-call swing-shift QE support from SLAC, with pager access to offduty day-shift QE as-needed
– LAT will augment this as-needed (especially during T-Vac) with NRL/Swales QE’s
– Once the test schedule solidifies, this plan will be refined
NCR/MRB processes
– The online SLAC NCR database will be used for all non-compliance reporting at NRL
– The MRB process will work similar to integration MRB’s
•
Scheduled MRB’s: there will be recurring MRB’s to handle non-critical NCR’s (e.g.: those related
to test set-up)
LAT Environmental Test PDR
8
GLAST LAT Project
3-4 May 2005
Summary
•
•
•
Most of the key logistics issues need to be worked still
Once Test Plans are mature, test durations will be scoped and much of the staffing plans will
then be developed (ECD: mid-June)
Many of the operations-level logistics will be worked over the summer after the final designs
and configurations of the tests are in place
LAT Environmental Test PDR
9