GLAST LAT Project 3-4 May 2005 LAT Environmental Test Planning and Design Review 3-4 May 2005 Logistics Martin Nordby LAT Environmental Test PDR 1 GLAST LAT Project 3-4 May 2005 Environmental Test Logistics Planning • • Still in the early stages of logistics planning Major issues at-hand (in rough order of decreasing impact) – Cleanliness and contamination control: the A-59 high and test facilities are NOT clean rooms started working on contamination issues with GLAST contamination control lead • • – – – CPT’s and LPT’s are still a not fully defined final definitions of these will impact test durations (see charts to follow) Defining required pre-test checking/test runs of LAT EGSE and facility data acquisition system this impacts the off-critical path schedule and drives need dates for EGSE and facility systems System safety and flight hardware protection • • • What are controls needed for fully-integrated LAT What are protocols that need to be implemented at NRL to meet these controls Mechanical: hoisting and rigging requirements per LAT req’s from SLAC and NRL policy Electrical: once power and conditioning needs are understood, we will address protections – Personnel protection, access, and workspace needs and availabilities: not started Staffing plans (see charts to follow) – Started putting together personnel list for each test – Staffing plans are less well understood: these will combine personnel lists with test schedules based on the tests scoped in the Test Plans LAT Environmental Test PDR 2 GLAST LAT Project 3-4 May 2005 LAT Level CPT Time Estimate • LAT Level Comprehensive Performance Test (CPT) Time Estimate – Estimate is 90.5 hrs of test time • • • Does not include assumptions for overhead Does not include SVAC runs Basis of Estimate – Single tower test run time actuals • • • – – – Identified LAT Level test cases that will sell all requirements and validate all functions Engineering judgment was used to estimate the time required for each test case Assumes a high degree of parallel testing of the Detector Subsystems • • – Unfortunately these actuals may or may not apply since there is uncertainty as to the effect of testing multiple towers in parallel Data will not be available on parallel tower test until 4 Tower testing (late May – early April) Data only available for CAL and TKR testing I&T has taken this as a requirement and is currently working on a solution to make this happen Will have a better idea that parallel test of the Detectors is feasible by 4 Tower test Assumes Flight Software tools are used (Config files, LCI, Event Handling) to conduct almost all tests LAT Environmental Test PDR 3 GLAST LAT Project 3-4 May 2005 LAT Level CPT Test Cases (1 of ) Group Test Title Time Estimate (Hrs) LAT Level Tests LAT Level LAT Level LAT Level LAT Level LAT Level LAT Level LAT Level LAT Level LAT Level LAT Level LAT Level LAT Level LAT Level LAT Level LAT Level LAT Level LAT Level LAT Level LAT Level LAT Level LAT Level LAT Level LAT Level LAT Level LAT Level LAT Level LAT Level LAT Level LAT Level LAT Level LAT Level LAT Level LAT Level LAT Level LAT Environmental Test PDR LAT001 – LAT Config 1 Initialization LAT002 – LAT Config 2 Initialization LAT003 – LAT Config 3 Initialization LAT004 – LAT Config 4 Initialization LAT005 – LAT Config 5 Initialization LAT006 – LAT Config 6 Initialization LAT011 – LAT Config 1 Power Off LAT012 – LAT Config 2 Power Off LAT013 – LAT Config 3 Power Off LAT014 – LAT Config 4 Power Off LAT015 – LAT Config 5 Power Off LAT016 – LAT Config 6 Power Off LAT021 – LAT Config 1 Reinitialization LAT022 – LAT Config 2 Reinitialization LAT023 – LAT Config 3 Reinitialization LAT024 – LAT Config 4 Reinitialization LAT026 – LAT Config 6 Reinitialization LAT031 – LAT Config 1 Narrowband Telemetry LAT032 – LAT Config 2 Narrowband Telemetry LAT033 – LAT Config 3 Narrowband Telemetry LAT034 – LAT Config 4 Narrowband Telemetry LAT035 – LAT Config 5 Narrowband Telemetry LAT036 – LAT Config 6 Narrowband Telemetry LAT041 – LAT Config 1 Cmd & Cmd Response LAT042 – LAT Config 2 Cmd & Cmd Response LAT043 – LAT Config 3 Cmd & Cmd Response LAT044 – LAT Config 4 Cmd & Cmd Response LAT045 – LAT Config 5 Cmd & Cmd Response LAT046 – LAT Config 6 Cmd & Cmd Response LAT051 – LAT Config 1 Wideband Telemetry LAT052 – LAT Config 2 Wideband Telemetry LAT053 – LAT Config 3 Wideband Telemetry LAT054 – LAT Config 4 Wideband Telemetry LAT055 – LAT Config 5 Wideband Telemetry 1 1 1 1 1 1 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.25 0.25 0.25 0.25 1 1 0.25 0.25 0.25 0.25 0.5 0.5 0.5 0.5 0.5 4 GLAST LAT Project 3-4 May 2005 LAT Level CPT Test Cases (2 of 2) Group Test Title Time Estimate (Hrs) LAT Level Tests LAT Level LAT Level LAT Level LAT Level LAT Level LAT Level LAT Level LAT Level LAT Level LAT Level LAT Level LAT Level LAT Level LAT Level LAT Level LAT Level LAT Level LAT Level LAT Level LAT Level LAT Level LAT Level LAT Level LAT Level LAT Level LAT Level LAT Level LAT Level LAT Level LAT Level LAT Level LAT Environmental Test PDR LAT061 – LAT Config 1 File Management LAT062 – LAT Config 2 File Management LAT071 – LAT Config 1 Configuration File Test LAT072 – LAT Config 2 Configuration File Test LAT081 – LAT Config 1 Safe Modes LAT082 – LAT Config 2 Safe Modes LAT091 – LAT Config 1 Charge Injection Functional LAT092 – LAT Config 2 Charge Injection Functional LAT101 – LAT Config 1 Science Modes LAT102 – LAT Config 2 Science Modes LAT111 – LAT Config 1 Backdoor Functional LAT112 – LAT Config 2 Backdoor Functional LAT121 – LAT/Spacecraft Interface Config 1 Test LAT122 – LAT/Spacecraft Interface Config 2 Test LAT150 – LAT Survival Heater Test LAT151 – LAT Config 1 Temp Control LAT152 – LAT Config 2 Temp Control LAT201 – LAT Config 1 Detector Threshold LAT202 – LAT Config 2 Detector Threshold LAT211 – LAT Config 1 Detector Functions LAT212 – LAT Config 2 Detector Functions LAT221 – LAT Config 1 Diagnostic Mode LAT222 – LAT Config 2 Diagnostic Mode LAT231 – LAT Config 1 Timing Measurement & Adjust LAT232 – LAT Config 2 Timing Measurement & Adjust LAT241 – LAT Config 1 Instrument Calibration LAT232 – LAT Config 2 Instrument Calibration LAT251 – LAT Config 1 Event Filtering & Pointing LAT252 – LAT Config 2 Event Filtering & Pointing LAT261 – LAT Config 1 GRB Handling LAT262 – LAT Config 2 GRB Handling 1 1 2 2 0.5 0.5 2 2 1 1 1 1 1 1 0.5 4 4 4 4 2 2 4 4 4 4 4 4 4 4 1 1 90.5 5 GLAST LAT Project 3-4 May 2005 Key Personnel • • All key personnel have been identified and are actively working on test preparations In addition to test-specific personnel, there a number of functional support people – Functional Support Leads • • • • • • • • Test Personnel LAT functional test planning: Rich Baun Facilities manager: Bill Raynor Logistics: Martin Nordby Data systems coordination: Brian Grist MGSE: Marc Campell (with Martin Nordby) EGSE: Mike Huffer (with Rich Bielawski) Test software: Ric Claus Utility infielder: Neil Johnson High-Bay Sine Vibe EMI/EMC Acoustic Micheal Lovellette Test Director Paul Dizon (NRL) John Ku (SLAC) John Ku (SLAC) (NRL) Test conductor --Bob Haynes (NRL) Mike Obara (NRL) Bob Haynes (NRL) John Ku (SLAC) John Ku (SLAC) Rich Bielawski Discipline leads Jim Haughton (NRL) Jim Haughton (NRL) (SLAC) Chris Fransen (GSFC) T-Vac Martin Nordby (SLAC) [Jack Goodman (SLAC)] Mike VanHerpe (NRL) Jeff Wang (LM) Key Test Personnel LAT Environmental Test PDR 6 GLAST LAT Project 3-4 May 2005 Staffing Plan SLAC and NRL personnel required to staff testing This will be populated as the test plans are finalized LAT Environmental Test PDR T-Vac Acoustic EMI/EMC Sine Vibe Personnel LAT mech tech LAT elec tech NRL operations LAT elec engineer LAT struc engineer LAT thermal NRL test specialists LAT QA NRL QA Total Approx Duration (m) Total MM High-Bay Ops Environmental Test Personnel Loading Ship/Receive • • 7 GLAST LAT Project 3-4 May 2005 QA Support Plans • • • QA support of all testing and operations at NRL will largely be treated as an extension of LAT work done at SLAC – This ensures that environmental testing dovetails with the current QA dataset and protocols already in use for LAT integration – It avoids the need to develop a separate system using NRL procedures QA personnel – SLAC will provide day-shift QE support on the floor at NRL for the duration of the test program – SLAC will provide on-call swing-shift QE support from SLAC, with pager access to offduty day-shift QE as-needed – LAT will augment this as-needed (especially during T-Vac) with NRL/Swales QE’s – Once the test schedule solidifies, this plan will be refined NCR/MRB processes – The online SLAC NCR database will be used for all non-compliance reporting at NRL – The MRB process will work similar to integration MRB’s • Scheduled MRB’s: there will be recurring MRB’s to handle non-critical NCR’s (e.g.: those related to test set-up) LAT Environmental Test PDR 8 GLAST LAT Project 3-4 May 2005 Summary • • • Most of the key logistics issues need to be worked still Once Test Plans are mature, test durations will be scoped and much of the staffing plans will then be developed (ECD: mid-June) Many of the operations-level logistics will be worked over the summer after the final designs and configurations of the tests are in place LAT Environmental Test PDR 9