08:00 Meeting
Download
Report
Transcript 08:00 Meeting
GLAST LAT Project
EM Tests, September 18, 2003
8:00 Meeting
Schedule
Mini-Tower and EM CAL will be integrated on EM Single Bay this morning
New version of TEM/TEM-PS (from Gunther) will be swapped in on
Monday
Shift schedule for characterizing CAL+TKR system before swapping in the
new TEM/TEM-PS
Thursday
12-8pm
Friday
8am-4pm
Friday
4pm-8pm
Saturday
8am-4pm
Saturday
4pm-8pm
Sunday
8am-4pm
Sunday
4pm-8pm
Larry,
Hiro,
Johann
Larry,
Berrie,
Johann
Larry,
Johann
Hiro,
Berrie,
Xin
Larry,
Elliott,
Brian
Hiro,
Johann
Larry,
Gary,
Johann
CAL CPT,
TKR LPT,
TKR
Occupancy,
Noise, Gain
CAL CPT,
TKR LPT,
TKR
Occupancy,
Noise, Gain
CAL TACK
delay
optimization
for TKR
trigger
Collect
Cosmic data
from
CAL+TKR
for TKR
trigger,
analyze
offline
Collect
Cosmic data
from
CAL+TKR
for TKR
trigger,
analyze
offline
Collect
Cosmic data
from
CAL+TKR
for TKR
trigger,
analyze
offline
Collect
Cosmic data
from
CAL+TKR
for TKR
trigger,
analyze
offline
L. Wai