Transcript ppt
GLAST LAT Project Gamma-ray Large Area Space Telescope Subsystem Managers Meeting May 12, 2004 GLAST Large Area Telescope: LAT Schedule Lowell A. Klaisner Stanford Linear Accelerator Center Project Manager [email protected] 650-926-2726 1 GLAST LAT Project Subsystem Managers Meeting May 12, 2004 LAT Schedule • “Tight and success oriented” – Too little success • Tighter now than a month ago • We are still at the starting gate • Adding schedule won’t solve problem by itself – Slipping 4 weeks in a month does not converge – Need to improve our execution • We can not “sell” a schedule until we have demonstrated some success fabricating flight hardware • This is a project wide issue and we need to work together to resolve the issue – no whining – no blame • Need to develop work arounds and ways to execute in parallel • The other option is descoping the instrument – Removing towers • Very painful to delay delivery of the instrument to observatory integration 2 GLAST LAT Project Subsystem Managers Meeting May 12, 2004 Major Schedule Issues Through CD-4 • Tracker – MCM startup and production rate – Attachment to the Grid and associated fixtures – 2 per month limit on final assembly and check out at Pisa • Work is expanding – Alignment • Calorimeter – AFEE boards • DAQ – Parts procurement – EGSE procedures – Startup of manufacturing • Design closure and drawings – Late flight software • Mechanical – Tracker to Grid interface design and implementation 3 GLAST LAT Project Subsystem Managers Meeting May 12, 2004 Issues Continued • Integration and Test – Timely completion and qualification of the GSE • General – EMI/EMC issues developing late – Incomplete documentation 4 GLAST LAT Project Subsystem Managers Meeting May 12, 2004 Tracker MCM Production TMCM FLIGHT PRODUCTION 220 200 TMCM Units 180 160 140 MIP-4 Baseline 120 100 80 60 40 20 WeekEnding MIP-1 MIP-2 MIP-3 MIP-4 Baseline /2 00 4 6/ 26 /2 00 4 6/ 19 /2 00 4 6/ 12 20 04 6/ 5/ /2 00 4 5/ 29 /2 00 4 5/ 22 /2 00 4 5/ 15 20 04 5/ 8/ 5/ 1/ 20 04 /2 00 4 4/ 24 /2 00 4 4/ 17 /2 00 4 4/ 10 4/ 3/ 20 04 0 Week Ending 04/03/04 04/10/04 04/17/04 04/24/04 05/01/04 05/08/04 05/15/04 05/22/04 05/29/04 06/05/04 06/12/04 06/19/04 06/26/04 0 0 0 0 0 0 6 5 9 25 17 50 28 75 40 100 125 150 175 200 225 5 5 9 25 17 50 28 75 40 100 125 150 175 Post Burn-in Shipped Baseline Note: The numbers are accumulative Shaded cells contain projected data 5 GLAST LAT Project Subsystem Managers Meeting May 12, 2004 One Plan for Schedule Recovery • Complete 2 tower testing in parallel with remaining integration – Components of Towers A&B to I&T without thermal vacuum testing – They will be installed in the 1X4 grid for single tower testing and two tower Comprehensive Performance Test on the original schedule – Tower 1 components will go through thermal vacuum test at the subsystem and be delivered to I&T on approximately the original schedule. Integration will proceed as planned – The 1X4 assembly will be put through thermal vacuum test in California making components of A&B towers ready for integration – Risk is that a systemic problem will show up in the T/V test of tower 1 (the third tower) • Mitigated by EM and Tray level testing 6 GLAST LAT Project Subsystem Managers Meeting May 12, 2004 Other possibilities • System test – What can be begun before all equipment integrated? – Can some tests be delayed until NRL? • Can we reduce and/or consolidate component testing? – With minimal increase in risk • Can work be redistributed to where resources are available? – Some of Tracker tower integration at Alenia? – Some alignment moved to SLAC? • Etc? – Discuss at this meeting – Where are the bottlenecks and what can we do about them? 7 GLAST LAT Project Subsystem Managers Meeting May 12, 2004 Working Schedule TKR A 07/02/04 TKR 14 12/21/04 ACD 11/03/04 07/28/04 01/25/05 01/05/05 CAL A 07/09/04 CAL 14 12/2/04 DAQ 11/01/04 01/11/05 01/21/05 TEM/PS 14 10/05/04 01/07/04 X-LAT 08/12/04 08/12/04 FSW Formal Test 02/18/05 12/15/04 Install Twrs 1-13 13 wks Install Tower 14 1 wk Install Gbl Items 6 wks 08/12/04 07/12/04 08/13/04 TEM/PS A 05/12/04 08/02/04 GRID Assembly 06/11/04 07/22/04 Install Twrs A&B 8 wks 2 Tower CPT 3 wks 01/04/05 01/28/05 FSW Complete 12/13/04 12/15/04 01/10/05 02/04/05 02/23/05 03/18/05 05/11/05 06/07/05 System Test 11 wks 10/31/05 10/31/05 Float 9 wks Ship LAT 1 wk Enviro Test 15 wks Float 4 wks LAT RFI Observ. Integration Launch 02/07 5 Weeks Dates Nov '03 May '04 Pre-Test / CD-4 Review 07/14/05 Pre-Ship Review 12/01/05 Color Code Subsystem I& T Test Mission 8 GLAST LAT Project Subsystem Managers Meeting May 12, 2004 LAT Schedule • “Tight and success oriented” – Too little success • Tighter now than a month ago • We are still at the starting gate • Adding schedule won’t solve problem by itself – Slipping 4 weeks in a month does not converge – Need to improve our execution • We can not “sell” a schedule until we have demonstrated some successful fabrication of flight hardware • This is a project wide issue and we need to work together to resolve the issue • Need to develop work arounds and ways to execute in parallel • The other option is descoping the instrument – Removing towers • Very painful to delay delivery of the instrument to observatory integration 9