Transcript ppt
LAT F2F Meeting 17 Mar 2005 GLAST Calorimeter Subsystem Mgrs F2F Meeting Calorimeter Subsystem 17 Mar 2005 W. Neil Johnson Naval Research Lab [email protected] W Neil Johnson 1 Naval Research Lab Washington DC GLAST Calorimeter CAL Status LAT F2F Meeting 17 Mar 2005 Crystal Detector Element (CDE) Manufacturing - Complete PreElectronic Modules (PEMs) - Complete Analog Front End Electronics (AFEE) - Complete All flight boards complete, burned in and conformal coated. 4 spares and 4 more for T&DF support are finishing burn in. CAL Modules 15 modules have been completely assembled. – 101 - 107 have been delivered – 108 – 110 are in TVAC chamber, pump down on Friday. PEMs 116 & 117 are in AFEE card installation All required EM2 TEM/TPS for 18 CAL modules are at NRL W Neil Johnson 2 Naval Research Lab Washington DC 109 110 111 112 113 114 115 116 117 118 W Neil Johnson ] ] ] ] ] ] ] ] ] ] ] ] ] ] ] ] ] ] ] ] ] ] ] ] ] ] ] ] Post Ship Test ] ] ] ] ] ] ] Ship Data Review ] ] ] ] ] ] ] ] ] ] ] ] ] Final CPT Calibration ] ] ] ] ] ] ] ] ] ] ] ] Mass Properties ] ] ] ] ] ] ] ] ] ] ] ] ] ] TVAC ] ] ] ] ] ] ] ] ] ] ] ] ] ] ] TEM/TPS ] ] ] ] ] ] ] ] ] ] ] ] ] ] ] Vibration 108 ] ] ] ] ] ] ] ] ] ] ] ] ] ] ] EMI/EMC 107 Conformal Coat 106 ] ] ] ] ] ] ] ] ] ] ] ] ] ] ] TEM/TPS Installation 105 ] ] ] ] ] ] ] ] ] ] ] ] ] ] ] ] ] ] Safe-to-Mate 104 AFEE Installation 103 PEM Assembly Module S/N 102 Initial CPT Assembly and Test GLAST Calorimeter 101 LAT F2F Meeting 17 Mar 2005 Completion ] ] ] ] ] ] ] ] ] Started This month Previously 3 Naval Research Lab Washington DC GLAST Calorimeter Issues LAT F2F Meeting 17 Mar 2005 Use of QUAL flight TEM/TPS for FM116 or FM117 environmental testing at NRL. Need next week for safe to mate for FM116 or week later for FM117 Restarting TVAC at NRL on 3/21 but without checkout of “Big Blue” Thermal Control System Not needed for CAL testing – individual cold plates for each CAL and TEM/TPS. “Big Blue” TCS will be checked out between CAL tests. Next CAL TVAC will be FM111 – FM114 Need to re-install (rent) humidity control system (dehumidification) for work in May and June Approx $25K cost expected to be covered within existing budget. W Neil Johnson 4 Naval Research Lab Washington DC GLAST Calorimeter W Neil Johnson LAT F2F Meeting 17 Mar 2005 CAL Module Deliveries December ’04 FM 101 January ’05 FM 102 – 105 February ’05 FM 106 – 107 March ’05 --- April ’05 FM 108 – 110 May ’05 FM 111 – 114 June ’05 FM 115 – 118 5 Naval Research Lab Washington DC