Transcript ppt)
GLAST LAT Project Gamma-ray Large Area Space Telescope Subsystem Managers Meeting March 17, 2005 GLAST Large Area Telescope: March ’05 Face to Face Meeting Introduction Lowell A. Klaisner Project Manager Stanford Linear Accelerator Center [email protected] 650-926-2726 Rev A 1 GLAST LAT Project Subsystem Managers Meeting March 17, 2005 Master Schedule • LAT complete and tested December 2005 – To NRL for environmental testing • Delivery to Observatory Integration June 1, 2006 – Mate with spacecraft and GBM and test • Launch August 31, 2007 – Kennedy Space Flight Center SIRTF Launch on a Delta II Heavy 2 GLAST LAT Project Subsystem Managers Meeting March 17, 2005 LAT Schedule TKR A 2/4/05 TKR 14 9/2/05 ACD 6/9/05 CAL A 12/08/04 CAL 5/2/05 DAQ 8/19/05 FSW Complete 4/1/05 TEM/PS A 2/17/05 TEM/PS 7/26/05 X-LAT 4/20/05 FSW Formal Test 07/14/05 Install Twrs 1-13 13 wks Install Tower 14 1 wk Install Gbl Items 4 wks GRID Assembly 2/25/05 Install Twrs A&B 8 wks 2 Tower CPT 3 wks 09/14/05 10/13/05 04/17/06 12/20/05 System Test 9 wks Ship LAT 1 wk PreReview Jan '05 Enviro Test 12 wks LAT RFI Observ. Integration Launch 2007 Color Code Subsystem I&T Test Mission 3 GLAST LAT Project Subsystem Managers Meeting March 17, 2005 Module Schedule M/E February 2005 Grid Module A Module B Module 1 Module 2 Module 3 Module 4 Module 5 Module 6 Module 7 Module 8 Module 9 Module 10 Module 11 Module 12 Module 13 Module 14 ACD X-LAT Harness PDU GASU EPU SIU FSW Inst Global Items System Test LAT Arrives at NRL EMI/EMC Test Sine Vibe Acoustic Test TVAC Weight & CG Preship Review Ship LAT Forecast Dates and Float (working days) to June 1, 2006 delivery Mech/ACD TKR CAL ELEC I&T 11/08/04A 02/04/05A - 12/08/04A - 02/17/05A - 29-Mar-05 02/24/05A - 01/14/05A 7-Mar-05 69 26-Apr-05 30-Mar-05 72 01/14/05A - 22-Apr-05 55 3-May-05 8-Apr-05 70 01/14/05A - 29-Apr-05 55 10-May-05 3-May-05 58 01/14/05A 6-May-05 55 17-May-05 16-May-05 54 02/22/05A - 13-May-05 55 24-May-05 3-Jun-05 46 02/22/05A - 20-May-05 55 13-Jun-05 16-Jun-05 42 18-Apr-05 55 27-May-05 55 24-Jun-05 28-Jun-05 39 21-Apr-05 52 6-Jun-05 55 7-Jul-05 7-Jul-05 38 25-Apr-05 50 13-Jun-05 55 15-Jul-05 18-Jul-05 36 2-May-05 45 20-Jun-05 55 26-Jul-05 27-Jul-05 34 10-May-05 39 27-Jun-05 55 4-Aug-05 5-Aug-05 32 18-May-05 33 5-Jul-05 55 15-Aug-05 16-Aug-05 30 13-May-05 36 12-Jul-05 55 24-Aug-05 25-Aug-05 28 23-May-05 30 19-Jul-05 55 2-Sep-05 2-Sep-05 27 25-May-05 28 26-Jul-05 55 13-Sep-05 9-Jun-05 108 1-Jun-05 117 5-Jul-05 75 1-Jul-05 76 14-Jul-05 68 19-Aug-05 42 2-Sep-05 32 22-Apr-05 126 13-Oct-05 20-Dec-05 26-Dec-05 1-Feb-06 14-Feb-06 26-Feb-06 15-Apr-06 17-Apr-06 18-Apr-06 23-Apr-06 54 54 54 54 54 54 46 42 39 38 36 34 32 30 28 27 27 27 27 27 27 27 27 27 27 27 4 GLAST LAT Project Subsystem Managers Meeting March 17, 2005 Mission office schedule options • NASA management investigated an option to preserve schedule – The configuration investigated was: • 16 Calorimeters • 12 Tracker towers • Remaining instrument per the current baseline – Saves approximately 1 month of schedule – Steve Ritz and Peter Michelson presented the scientific implications of exercising this option to Anne Kinney, Director, Universe Division, on February 24 – Decision to adopt this option was postponed to give the LAT the opportunity to demonstrate execution to the proposed schedule 5 GLAST LAT Project Subsystem Managers Meeting March 17, 2005 Status as of January 31, 2005 • Cost and Commitments through January 31, 2005 $129M • Planned Budget at Completion of fabrication $156M • Cost to go for fabrication $ 27M • Cost and Commitments as percent of planned budget 83% 6 GLAST LAT Project Subsystem Managers Meeting March 17, 2005 FY 06 & 07 Costs Sum of Cost WBS OBS 4.1.1 INSTRUMENT MANAGEMENT DG *** GSFC Budget Element RL LABOR RM MATERIAL & SERVICES RT TRAVEL RX MPS & LAB TAX DG *** GSFC Total DH *** HEPL RL LABOR RM MATERIAL & SERVICES RT TRAVEL DH *** HEPL Total DL *** SLAC RL LABOR RM MATERIAL & SERVICES RT TRAVEL DL *** SLAC Total DN *** NRL RL LABOR RT TRAVEL DN *** NRL Total DU *** UCSC RL LABOR DU *** UCSC Total 4.1.1 INSTRUMENT MANAGEMENT Total 4.1.2 SYSTEM ENGINEERING DH *** HEPL RM MATERIAL & SERVICES DH *** HEPL Total DL *** SLAC RL LABOR RM MATERIAL & SERVICES DL *** SLAC Total 4.1.2 SYSTEM ENGINEERING Total 4.1.4 TRACKER DL *** SLAC RL LABOR RM MATERIAL & SERVICES RT TRAVEL DL *** SLAC Total DU *** UCSC RL LABOR RM MATERIAL & SERVICES RT TRAVEL DU *** UCSC Total 4.1.4 TRACKER Total FY 2006 96 12 17 53 177 406 29 36 471 1,047 432 171 1,650 74 9 83 125 125 2,506 363 363 59 1,022 1,081 1,445 131 3 41 175 274 2 17 293 468 2007 Grand Total 50 146 4 16 4 21 59 111 117 294 290 696 24 53 29 65 342 814 693 1,740 331 763 73 244 1,097 2,747 52 126 5 14 57 140 119 244 119 244 1,733 4,239 327 690 327 690 51 110 862 1,884 913 1,994 1,240 2,684 27 158 3 42 83 69 244 238 512 2 14 31 252 545 321 789 7 GLAST LAT Project Subsystem Managers Meeting March 17, 2005 FY 06 & 07 Costs 4.1.5 CALORIMETER DN *** NRL RL LABOR RM MATERIAL & SERVICES RT TRAVEL DN *** NRL Total 4.1.5 CALORIMETER Total 4.1.6 ANTICOINCIDENCE DETECTORDG *** GSFC RL LABOR DG *** GSFC Total 4.1.6 ANTICOINCIDENCE DETECTOR Total 4.1.7 ELECTRONICS DL *** SLAC RL LABOR RM MATERIAL & SERVICES RT TRAVEL DL *** SLAC Total DN *** NRL RL LABOR RT TRAVEL DN *** NRL Total 4.1.7 ELECTRONICS Total 4.1.8 MECHANICAL SYSTEMS DL *** SLAC RL LABOR RM MATERIAL & SERVICES RT TRAVEL DL *** SLAC Total 4.1.8 MECHANICAL SYSTEMS Total 4.1.9 INTEGRATION & TEST DL *** SLAC RL LABOR RM MATERIAL & SERVICES RT TRAVEL DL *** SLAC Total DN *** NRL RL LABOR RM MATERIAL & SERVICES RT TRAVEL DN *** NRL Total 4.1.9 INTEGRATION & TEST Total 1,526 32 132 1,690 1,690 225 225 225 1,251 8 64 1,322 187 8 195 1,517 348 140 35 523 523 1,480 292 231 2,004 706 330 15 1,051 3,055 856 29 885 885 170 170 170 745 2 51 797 49 4 53 850 238 0 238 238 963 150 188 1,300 1,300 2,382 32 160 2,575 2,575 395 395 395 1,996 10 114 2,120 236 12 247 2,367 586 140 35 761 761 2,443 442 419 3,304 706 330 15 1,051 4,356 8 GLAST LAT Project Subsystem Managers Meeting March 17, 2005 FY 06 & 07 Costs 4.1.A PERFORMANCE AND SAFETY ASSURANCE DL *** SLAC RL LABOR RM MATERIAL & SERVICES RT TRAVEL DL *** SLAC Total DN *** NRL RM MATERIAL & SERVICES DN *** NRL Total 4.1.A PERFORMANCE AND SAFETY ASSURANCE Total 4.1.B LAT INSTRUMENT SCIENCE OPERATIONS DL *** SLAC CENTER RL LABOR DL *** SLAC Total 4.1.B LAT INSTRUMENT SCIENCE OPERATIONS CENTER Total 4.1.C EDUCATION AND PUBLIC OUTREACH DS *** SSU RL LABOR RM MATERIAL & SERVICES RT TRAVEL DS *** SSU Total DU *** UCSC RL LABOR DU *** UCSC Total 4.1.C EDUCATION AND PUBLIC OUTREACH Total 4.1.D SCIENCE ANALYSIS SOFTWARE DG *** GSFC RL LABOR RT TRAVEL RX MPS & LAB TAX DG *** GSFC Total DH *** HEPL RL LABOR RM MATERIAL & SERVICES RT TRAVEL DH *** HEPL Total DL *** SLAC RL LABOR DL *** SLAC Total DN *** NRL RL LABOR RT TRAVEL DN *** NRL Total DW *** UW RL LABOR RM MATERIAL & SERVICES RT TRAVEL DW *** UW Total 4.1.D SCIENCE ANALYSIS SOFTWARE Total Grand Total 165 526 40 731 166 166 897 28 28 28 304 268 53 625 10 10 635 228 28 -14 242 185 14 7 207 0 0 252 7 260 71 21 17 108 817 13,806 143 186 25 353 353 24 24 24 91 305 35 430 430 198 24 42 264 148 13 6 166 0 0 220 6 226 60 18 14 92 749 8,294 308 712 65 1,084 166 166 1,250 52 52 52 395 573 88 1,055 10 10 1,065 425 53 28 506 332 27 14 373 0 0 473 14 486 131 39 31 201 1,566 22,100 9 GLAST LAT Project Subsystem Managers Meeting March 17, 2005 FY 06 & 07 FTEs Sum of FTE WBS 4.1.1 INSTRUMENT MANAGEMENT 4.1.1 INSTRUMENT MANAGEMENT Total 4.1.2 SYSTEM ENGINEERING 4.1.2 SYSTEM ENGINEERING Total 4.1.4 TRACKER 4.1.4 TRACKER Total 4.1.5 CALORIMETER 4.1.5 CALORIMETER Total 4.1.6 ANTICOINCIDENCE DETECTOR 4.1.6 ANTICOINCIDENCE DETECTOR Total 4.1.7 ELECTRONICS 4.1.7 ELECTRONICS Total 4.1.8 MECHANICAL SYSTEMS 4.1.8 MECHANICAL SYSTEMS Total 4.1.9 INTEGRATION & TEST OBS DG *** GSFC DH *** HEPL DL *** SLAC DN *** NRL DU *** UCSC DL *** SLAC DL *** SLAC DU *** UCSC DN *** NRL DG *** GSFC DL *** SLAC DN *** NRL DL *** SLAC DL *** SLAC DN *** NRL 4.1.9 INTEGRATION & TEST Total 4.1.A PERFORMANCE AND SAFETY ASSURANCE DL *** SLAC 4.1.A PERFORMANCE AND SAFETY ASSURANCE Total 4.1.B LAT INSTRUMENT SCIENCE OPERATIONS CENTER DL *** SLAC 4.1.B LAT INSTRUMENT SCIENCE OPERATIONS CENTER Total 4.1.C EDUCATION AND PUBLIC OUTREACH DS *** SSU DU *** UCSC 4.1.C EDUCATION AND PUBLIC OUTREACH Total 4.1.D SCIENCE ANALYSIS SOFTWARE DG *** GSFC DH *** HEPL DN *** NRL DW *** UW 4.1.D SCIENCE ANALYSIS SOFTWARE Total Grand Total Fiscal Year 2006 2007 Grand Total 1.2 0.6 1.8 3.1 2.4 5.4 6.0 3.6 9.6 0.3 0.2 0.5 0.4 0.4 0.8 11.0 7.1 18.1 0.7 0.6 1.2 0.7 0.6 1.2 0.8 0.2 1.0 2.9 2.5 5.4 3.6 2.7 6.3 6.3 3.4 9.7 6.3 3.4 9.7 2.1 1.6 3.8 2.1 1.6 3.8 8.8 5.4 14.1 0.8 0.2 1.0 9.6 5.6 15.1 1.6 0.9 2.4 1.6 0.9 2.4 13.1 10.4 23.5 3.4 3.4 16.5 10.4 26.9 0.9 0.7 1.6 0.9 0.7 1.6 0.1 0.1 0.2 0.1 0.1 0.2 2.1 0.7 2.8 0.1 0.1 2.2 0.7 2.8 1.8 1.5 3.3 1.2 1.0 2.2 1.1 0.9 2.0 0.2 0.2 0.4 4.3 3.6 7.9 58.8 37.3 96.1 10 GLAST LAT Project Subsystem Managers Meeting March 17, 2005 Next Step with FY06 and 07 budgets • • • • Consolidate operating and fabrication plans Review with subsystem managers Propose to the mission office Restructure tracking accordingly – i.e. close subsystem budgets at last delivery and track ongoing support in a new contract 11