LAT F2F Meeting 15 June 2005 GLAST Calorimeter Subsystem Mgrs F2F Meeting Calorimeter Subsystem 15 June 2005 J. Eric Grove Naval Research Lab [email protected] J Eric Grove 1 Naval Research Lab Washington DC GLAST Calorimeter LAT F2F Meeting 15 June 2005 CAL Status Completed final CPTs and calibrations on FM 111 – FM 118 Completed ATDPs and PreShip Reviews on FM 111 – FM 118. Shipped to SLAC FM 108 – FM 114 Post-ship testing in progress for FM 111 – FM 114 Preparing FM 115 – FM 118 for shipment on 23 June. Assembly and Test of Module 119 PEM assembled and tested AFEE boards installed and soldered TEM/TPS safe-to-mate in progress J Eric Grove 2 Naval Research Lab Washington DC 114 115 116 117 118 J Eric Grove ] ] ] ] ] ] ] ] ] ] ] ] ] ] ] ] ] ] ] ] ] ] ] ] ] ] ] ] ] ] ] ] ] ] ] ] ] ] ] ] ] ] ] ] ] ] ] ] ] ] ] ] ] ] ] ] ] ] ] ] ] ] ] ] ] ] ] ] ] ] ] ] ] ] ] ] ] ] ] ] ] ] ] ] ] ] ] ] ] ] ] ] ] ] ] ] ] ] ] ] ] ] ] ] ] ] ] ] ] ] ] ] ] ] ] ] ] ] ] ] ] ] ] ] ] ] ] ] ] ] ] ] ] ] ] ] ] ] ] ] ] ] ] ] ] ] ] ] ] ] ] ] ] ] ] ] ] ] ] ] ] ] 3 ] ] ] ] ] ] ] ] ] ] ] ] ] ] Post Ship Test ] ] ] ] ] ] ] ] ] ] ] ] ] ] ] ] ] ] TEM/TPS Data Review 113 Final CPT Calibration 112 Mass Properties 111 TVAC 110 Vibration 109 EMI/EMC 108 Initial CPT 107 Conformal Coat 106 TEM/TPS Installation 105 ] ] ] ] ] ] ] ] ] ] ] ] ] ] ] ] ] ] Safe-to-Mate 104 AFEE Installation 103 PEM Assembly Module S/N 102 ] ] ] ] ] ] ] ] ] ] ] ] ] ] ] ] ] ] Ship Assembly and Test GLAST Calorimeter 101 LAT F2F Meeting 15 June 2005 ] ] ] ] ] ] ] ] ] ] Completion ] ] Started This month Previously * * * * Naval Research Lab Washington DC GLAST Calorimeter LAT F2F Meeting 15 June 2005 CAL Module Milestones Deliveries or Ready to Ship J Eric Grove December ’04 FM 101 January ’05 FM 102 – 105 February ’05 FM 106 – 107 March ’05 --- April ’05 FM 108 – 110 May ’05 FM 111 – 114 June ’05 FM 115 – 118 4 Shipped 6/6/05 Shipped 6/13/05 Ship 6/23/05 Naval Research Lab Washington DC