GLAST LAT Project Gamma-ray Large Area Space Telescope Subsystem Managers Meeting, June 15, 2005 GLAST Large Area Telescope: Overview Lowell A. Klaisner Stanford Linear Accelerator Center Project Manager [email protected] 650-926-2726 1 GLAST LAT Project Subsystem Managers Meeting, June 15, 2005 Schedule Status as of June 13, Forecast Dates and Float (working 2005 Mech/ACD TKR Grid 11/08/04A 1st Module 02/04/05A 2nd Module 02/24/05A 3rd Module 05/10/05A 4th Module 05/10/05A 5th Module 05/10/05A 6th Module 06/08/05A 7th Module 06/08/05A 8th Module 07/06/05 41 9th Module 07/08/05 52 10th Module 07/29/05 43 11th Module 08/02/05 50 12th Module 08/16/05 45 13th Module 08/18/05 50 14th Module 08/25/05 47 15th Module 09/07/05 44 16th Module 09/09/05 44 ACD 07/29/05 91 X-LAT 06/21/05 122 Radiators 08/09/05 152 Harness PDU GASU 1st EPU/SIU Last EPU/SIU FSW Cand Test Start FSW FQT Inst Global Items System Test LAT Arrives at NRL Sine Vibe EMI/EMC Test Acoustic Test TVAC Weight & CG Preship Review Ship LAT days) to "Ship LAT" CAL 12/08/04A 01/14/05A 01/14/05A 01/14/05A 01/14/05A 02/22/05A 02/22/05A 04/25/05A 04/25/05A 04/25/05A 05/25/05A 05/25/05A 05/25/05A 05/25/05A 06/10/05A 06/10/05A - ELEC I&T 02/17/05A 03/09/05A 05/19/05A 05/19/05A 06/02/05A 06/06/05A 06/06/05A 06/13/05 06/17/05 06/17/05 06/24/05 06/24/05 07/01/05 07/01/05 07/11/05 07/11/05 57 66 72 76 81 83 85 85 87 07/15/05 10/03/05 09/16/05 10/20/05 11/08/05 06/14/05A 08/30/05 91 35 45 24 10 39 04/07/05A 04/13/05A 05/27/05A 06/06/05A 06/27/05 06/27/05 07/26/05 07/26/05 08/16/05 08/16/05 09/01/05 09/01/05 09/13/05 09/13/05 09/27/05 09/27/05 43 43 41 41 41 41 41 41 41 41 41 42 12/02/05 02/06/06 02/12/06 03/10/06 03/31/06 04/11/06 05/10/06 05/12/06 05/13/06 05/14/06 10 10 10 10 10 10 10 10 10 10 2 GLAST LAT Project Subsystem Managers Meeting, June 15, 2005 Lien List Available contingency as of end-May 2005: Contingency if below changes are approved: Sum of Cost Status Pending Subsystem 4.1.2 Sys Eng 4.1.2 Sys Eng Total 4.1.4 Tracker 4.1.4 Tracker Total 4.1.6 ACD 4.1.6 ACD Total 4.1.A PSA 4.1.A PSA Total 4.1.7 Elex 4.1.7 Elex Total Pending Total Grand Total Item Manufacturing engineering support DOE 1,400 1,315 Funding DOE 50 50 ASIC grinding & dicing Cable productivity improvements Tracker schedule delay (cost TBD) MCMs MMS/TB bakeout Incorporate thermal loads imparted by MMS/TB MMS schedule recovery Additional S&MA support Alignment H/W for optical fiber to PMT connection 18+ days schedule delay cost 3 add'l vibe tests to analyze freq shift Additional facilities costs Tracker simulator Extend QA support (cost TBD) Thermal vacuum labor (cost TBD) SIB/UTMC receiver chips DAQ schedule delay (cost TBD) Flight software schedule delay 0 35 0 35 85 85 NASA 384 -569 Total 1,784 746 NASA Grand Total 50 50 33 33 120 120 0 0 120 120 273 273 35 35 9 9 35 35 15 15 8 8 140 140 29 29 30 30 6 6 307 307 0 0 0 0 0 35 0 373 373 373 408 953 1,038 953 1,038 3