GLAST Monthly
Mission Review
August 6, 2007
GLAST LAT Instrument
Monthly Mission Review
Gamma-ray Large
Area Space
Telescope
Project Status Overview
August 6, 2007
Ken Fouts
SLAC
[email protected]
K. Fouts, SLAC
1
GLAST LAT Instrument
K. Fouts, SLAC
LAT Project Status
GLAST Monthly
Mission Review
August 6, 2007
7/14
LAT FSW 1-0-1 installation & regression test complete
7/16
LAT Radiators Removed
7/17
LAT Radiator velcro and ACD blanket cleaning complete
7/23
Completed LAT A-side CPT
7/28
Completed LAT B-side CPT
2
GLAST LAT Instrument
LAT Planned Milestones
Activity
LAT Radiator Flight Install & test
LAT MLI Closeout for TVAC
K. Fouts, SLAC
GLAST Monthly
Mission Review
August 6, 2007
ECD
8/9?
Pre-TVAC
3
I&T/Online Progress
GLAST LAT Instrument





GLAST Monthly
Mission Review
August 6, 2007
FSW B1-0-1 fall-out script and configuration issues
Configuration files updated for compatibility with FSW B1-0-1
ACD cable 14 issue resolved (red herring)
GRB handling scripts updated
Various JIRAed bug fixes
K. Fouts, SLAC
4
GLAST LAT Instrument
Online JIRA issues (as of 7/30)
GLAST Monthly
Mission Review
August 6, 2007
Issues opened
since 7/10
Issues closed
since 7/10
Total # of issues
currently open
LICOS
4
5
6
LICOS_Config
11
14
4
LICOS_ETC
3
6
15
LICOS_Scripts
12
13
16
INT
8
5
19
LDF
0
0
1
LSF
0
0
0
E-Logbook
0
0
20
38
43
81
Package
Totals
K. Fouts, SLAC
5
GLAST LAT Instrument

LAT Issues and Concerns
GLAST Monthly
Mission Review
August 6, 2007
Command & Data Dropouts
 2 Command dropouts during CPT

LAT Watt-rod Cage Rework





Cages have been re-assembled
Shipping container mods underway
Additional shielding to be received 8/15
Return to GD by end of August
Timely delivery of configuration definitions prior to TVAC
K. Fouts, SLAC
6
GLAST Monthly
Mission Review
August 6, 2007
GLAST LAT Instrument
Gamma-ray Large
Area Space
Telescope
Cost Reports for
4.1 LAT
June 2007 Month End
K. Fouts, SLAC
7
Cost Status by Organization
GLAST Monthly
Mission Review
August 6, 2007
GLAST LAT Instrument
June 07 Month-End
By Institution
K$
Current Period
Cumulative to Date
Budgt'd
Actual
Budgt'd
Actual
Cost
Cost
Cost
Cost
Work
Work
Cost
Work
Work
Cost
Scheduled Performed Variance Scheduled Performed Variance
Budgeted
at
Completion
DG *** GSFC
57
33
24
21,254
20,669
586
21,489
DH *** HEPL
110
95
15
11,291
10,779
512
11,797
DL *** SLAC
545
633
-88
107,261
106,449
811
109,489
DN *** NRL
178
207
-29
34,735
34,750
-15
35,456
0
0
0
59
59
0
59
52
38
14
3,734
3,441
292
3,937
0
0
0
15
15
0
15
DU *** UCSC
29
29
1
2,913
2,857
55
3,034
DW *** UW
10
12
-1
491
386
105
538
982
1,047
-65
181,754
179,407
2,347
185,813
DO *** Financial Plan Transfer/Sub Out
DS *** SSU
DT *** Texas A&M
Sub Total
Contingency
Total
K. Fouts, SLAC
2,242
982
1,047
-65
181,754
179,407
2,347
188,055
8
GLAST LAT Instrument
Cost by Orgs with Variances
≥$100K
June 07 Month-End
By Institution & WBS Level 3
K$
DG *** GSFC
4.1.1 INSTRUMENT MANAGEMENT
4.1.6 ANTICOINCIDENCE DETECTOR
4.1.D SCIENCE ANALYSIS SOFTWARE
4.1.E SUBORBITAL FLIGHT TEST
OBSTotals:
DH *** HEPL
4.1.1 INSTRUMENT MANAGEMENT
4.1.2 SYSTEM ENGINEERING
4.1.4 TRACKER
4.1.7 ELECTRONICS
4.1.A PERFORM & SAFETY ASSURANCE
4.1.B INSTRUMENT SCIENCE OPS CENTER
4.1.D SCIENCE ANALYSIS SOFTWARE
4.1.E SUBORBITAL FLIGHT TEST
OBSTotals:
DL *** SLAC
4.1.1 INSTRUMENT MANAGEMENT
4.1.2 SYSTEM ENGINEERING
4.1.4 TRACKER
4.1.5 CALORIMETER
4.1.6 ANTICOINCIDENCE DETECTOR
4.1.7 ELECTRONICS
4.1.8 MECHANICAL SYSTEMS
4.1.9 INTEGRATION & TEST
4.1.A PERFORM & SAFETY ASSURANCE
4.1.B INSTRUMENT SCIENCE OPS CENTER
4.1.C EDUCATION & PUBLIC OUTREACH
OBSTotals:
DS *** SSU
4.1.C EDUCATION & PUBLIC OUTREACH
OBSTotals:
DW *** UW
4.1.D SCIENCE ANALYSIS SOFTWARE
OBSTotals:
K. Fouts, SLAC
GLAST Monthly
Mission Review
August 6, 2007
Current Period
Cumulative to Date
Budgt'd
Actual
Budgt'd
Actual
Cost
Cost
Cost
Cost
Work
Work
Cost
Work
Work
Cost
Scheduled Performed Variance Scheduled Performed Variance
Budgeted
at
Completion
30
0
27
0
57
18
0
16
0
33
12
0
12
0
24
2,016
17,479
1,381
378
21,254
1,629
17,482
1,180
378
20,669
387
-3
201
0
586
2,139
17,479
1,493
378
21,489
78
0
0
0
0
0
32
0
110
76
0
0
0
0
0
20
0
95
2
0
0
0
0
0
12
0
15
3,670
2,681
1,475
1,021
263
258
1,463
460
11,291
3,476
2,638
1,475
1,019
248
257
1,206
461
10,779
194
43
0
2
16
0
257
0
512
4,051
2,681
1,475
1,021
263
258
1,588
460
11,797
42
144
0
0
0
68
0
250
42
0
0
545
20
326
0
0
0
49
0
236
3
0
0
633
22
-182
0
0
0
19
0
14
39
0
0
-88
14,383
8,906
18,144
721
685
28,324
17,441
13,595
4,998
59
5
107,261
14,325
8,877
18,097
718
683
28,372
17,417
12,853
5,049
59
0
106,449
58
29
47
2
3
-48
25
742
-51
0
5
811
14,495
9,643
18,144
721
685
28,605
17,441
14,566
5,124
59
5
109,489
52
52
38
38
14
14
3,734
3,734
3,441
3,441
292
292
3,937
3,937
10
10
12
12
-1
-1
491
491
386
386
105
105
538
538
9
FTE Report
GLAST LAT Instrument
GLAST Monthly
Mission Review
August 6, 2007
LAT PROJECT FTEs
120.0
110.0
ACTUALS
PLANNED
100.0
90.0
80.0
70.0
60.0
50.0
40.0
30.0
20.0
K. Fouts, SLAC
OCT07
SEP07
AUG07
JUL07
JUN07
MAY07
APR07
MAR07
FEB07
JAN07
DEC06
NOV06
0.0
OCT06
10.0
10