Transcript (ppt)
Installation Review L A T Tracker Tower Installation Review Peter Amnuaypayoat July 28 2004 [email protected] x8985 1 GLAST Project Installation Review L A T Agenda • • • • • • • • • • Tracker- Mock-up Eng. Dev. (R. Ruland) Lessons Learned (Peter A.) I&T Flow for Tracker Installation (T. Borden) Grid Interface Hardware List Notation Coordinate System Side Wall Identification Flexure Identification Installation Procedure – INFN Static Test (Non-Aligning) Presetting Procedure Alignment of inner cone relative to outer cone Installation Procedure – INFN Vibration Test (Aligning to CMM measurement) Dithering Procedure Shimming Procedure Cone Removal Procedure July 28 2004 • • • • Alignment Tools Optical Survey Tools Near-Term Plans Final CMM of Mock-up at SLAC (8/5-6 tbd) I&T Training Grid I/F Hardware for I&T Future Topics (Next Meeting) Flex Circuit Cable Installation Cable Bending Cable Bonding Connector Saver Plan 2 GLAST Project Installation Review L A T Tracker Mock-up Engineering Development • CMM Program established from Tower Mock-up model Developed in Bay area and at INFN • Experience gained from Mock-up Tower to Grid simulator installation Alignment of Eccentric cones Testing of the CMM program • Differences between Mock-up model and E.M. (Flight like) model Corner Flexures are non flight like (older rev.) Does not contain corner brackets or flight like reflector ball nests July 28 2004 3 GLAST Project Installation Review L A T Tower Alignment Summary • Measurements at INFN – – – – – – – • Used their CMM which runs PC-DMIS Created measurement scripts for automated measurements Derived CS which puts tower in optimized position, i.e. Z-axis vertical wrt gravity, X, Y symmetrical to actual shape Determined coordinates of flexure conicals in tower CS Comparing actuals vs design yields dial-in settings for cones Applied settings, mounted tower to base Cross-checks good to 500 µm (TBs too small and loose) Planned measurements at SLAC – Verify procedure by independently creating equivalent measurement routine on our Leitz PMM using Quindos – Repeat measurement / alignment cycle at least three times July 28 2004 4 GLAST Project Installation Review L A T I&T Flow For Tracker Installation Remove CAL, TEM, TEM-PS, & TKR Tower from Single Bay Install TKR into alignment fixture Prepar e Grid Bay Inspect, Metrology & El Test Test Measure TKR and Align Cones Install TKR Tower into Grid Bay Install TKR Tower into Single Bay Install CAL, TEM, & TEM-PS Receive TKR Tower July 28 2004 Final Test Install CAL, TEM, & TEM-PS 5 GLAST Project Installation Review L A T Grid Interface Hardware list • • • • • • Installation Shims: LAT-DS-03506 Outer Eccentric Cone: LAT-DS-02788 Inner Eccentric Cone: LAT-DS-02787 Hex Bushing: LAT-DS-02789 Hex Nut: LAT-DS-03925 Shoulder Stud: LAT-DS-02791 Corner Flexure Grid July 28 2004 6 GLAST Project Installation Review L A T Notation -X,+Y +Y, -x -X, +y Grid Simulator (Tower base plate) -X,-y +Y, +x +X,+Y -X,-Y +Y (reference location) (reference location) +X +Z -Y, -x +X, +y +X, +y designates the stud on the + y side of the flexure which is on located on the +X side wall. July 28 2004 For all side flexures, the side flexure identifier is capitalized, while the side flexure conical (stud) is in lower case. +X,-y +X, -Y (reference location) -Y, +x 7 GLAST Project Installation Review L A T Installation Procedure (Static test) - INFN • Refer to section 2.1 of LAT-DS-0425-01 • Installed Grid simulator with no Aligning – Performed on Tower Mock-up – requires no Aligning tools – Adjusting tools required • Preset three inner and outer cones to the concentric position For three reference locations Used to locate the position of Tower Align slots on both cones • Remaining cones are to be “Dithered” Process in which cones seat to their required position July 28 2004 8 GLAST Project Installation Review L A T Presetting Procedure Refer to section 6.1 of LAT-DS-04245 Section 6.1.9: determine α by using Matlab program “angtool” Setting α, “inner to outer cone angle” July 28 2004 9 GLAST Project Installation Review L A T Installation Procedure (Aligning to CMM measurement) - INFN • Refer to LAT-MD-03566 and LAT-PS-04245 Determine β for each reference location LAT-PS-04245: Section 2.3 Tower C.S +Z Tower C.S +Z Calculate Flexure Point offsets from nominal and check against available travel Struc C.S +Z Define a coordinate system based on the location of Top and Bottom Tray Hardware. Then move it so it is centered on the shape and size of the Sidewalls Set Eccentric Cone rotation, then mount Grid Simulator and fit with shims. July 28 2004 10 GLAST Project Installation Review L A T Installation Adjusting Procedures • Dithering Process in which cones seat to their required position Tool LAT-DS-04337 • Shimming Procedure Refer to LAT-PS-04245 section 9 • • • Measurement of gap Selection of shim stack Cone removal procedure Refer to LAT-PS-04245 section 8 • • • • Assembly of the cone Extractor Removal of the Inner cone from the Corner Flexure Removal of the Outer cone from the Corner Flexure Separation of Inner cone from Outer cone July 28 2004 11 GLAST Project Installation Review L A T Alignment Tools INTERFACE AND ALIGNMENT TOOLS FOR TOWER "A" Item Drawing Number Title LAT-DS-04336 Outer Cone Adjuster, Spanner Inner Cone Adjuster, Spanner LAT-DS-04337 Dithering Tool 1 LAT-DS-04335 2 Vendor Contact Cost Number Total CONE ADJUSTING TOOLS Recommended Quantity Needed at each Installation sight Quantity at INFN Quantity at SLAC 3 (Sets) 2 (Sets) 0 SLAC 3 2 0 10? 3? 0 Need Date Delivery Date Comments TBD 30-Jul-04 30-Jul-04 Need to order sets for I&T need date SLAC TBD 30-Jul-04 30-Jul-04 SLAC? TBD 30-Jul-04 30-Jul-04 3 Done Need to order sets for I&T need date Need to order for I&T need date, possible outside vendor CONE ALIGNMENT TOOLS 4 LAT-DS-04345 Alignment Template Alignment Block LAT-DS-04346 Alignment Dial 2 1 1 SLAC TBD 13-Aug-04 TBD LAT-DS-04347 Cones Aligner 2 2 0 SLAC TBD 13-Aug-04 TBD LAT-DS-04348 Clamping Template 6 3 1 SLAC? TBD 13-Aug-04 TBD LAT-DS-04344 5 2 1 2? SLAC TBD 13-Aug-04 TBD 2 1 0 SLAC TBD 13-Aug-04 TBD 6 7 8 Touches Cones, need Q.C.?? Possible material change to steel? Need to order one for I&T need date Touches Flight Cones, need Q.C.?? Need to order for I&T need date. Touches Flight Cones, need Q.C.?? Need to order for I&T need date. Contact Flight Flexure, need Q.C.?? Need to order for I&T need date. CONE EXTRACTION TOOLS LAT-DS-04339 Extraction Rod 2 2 0 SLAC TBD 30-Jul-04 30-Jul-04 LAT-DS-04340 Extraction Tube, Inner Cone 4 3 0 SLAC TBD 30-Jul-04 30-Jul-04 4 2 0 SLAC TBD 30-Jul-04 30-Jul-04 2 2 0 SLAC TBD 30-Jul-04 30-Jul-04 2 0 0 SLAC TBD TBD TBD 9 10 11 LAT-DS-04341 12 LAT-DS-04342 13 TBD July 28 2004 Extraction Tube, Outer Cone Pull Rod Base Extraction Bracket Need to order some for I&T need date INFN will be able to use future extraction bracket, due to access from behind. Need to order some for I&T need date INFN will be able to use future extraction bracket, due to access from behind. Need to order some for I&T need date Need to order some for I&T need date Needs to be Designed. For use at INFN (Arthur?) 12 GLAST Project Installation Review L A T Additional Topics • Optical Survey Tools • Near-Term Plans Final CMM of Mock-up at SLAC (8/5-6 tbd) I&T Training Grid I/F Hardware for I&T • Future Topics (Next Meeting) Flex Circuit Cable Installation Cable Bending Cable Bonding Connector Saver Plan July 28 2004 13 GLAST Project