Installation Review
L
A
T
Tracker Tower
Installation Review
Peter Amnuaypayoat
July 28 2004
[email protected] x8985
1
GLAST Project
Installation Review
L
A
T
Agenda
•
•
•
•
•
•
•
•
•
•
Tracker- Mock-up Eng. Dev. (R. Ruland)
Lessons Learned (Peter A.)
I&T Flow for Tracker Installation (T. Borden)
Grid Interface Hardware List
Notation
Coordinate System
Side Wall Identification
Flexure Identification
Installation Procedure – INFN
Static Test (Non-Aligning)
Presetting Procedure
Alignment of inner cone relative to outer cone
Installation Procedure – INFN
Vibration Test (Aligning to CMM measurement)
Dithering Procedure
Shimming Procedure
Cone Removal Procedure
July 28 2004
•
•
•
•
Alignment Tools
Optical Survey Tools
Near-Term Plans
Final CMM of Mock-up at SLAC (8/5-6 tbd)
I&T Training
Grid I/F Hardware for I&T
Future Topics (Next Meeting)
Flex Circuit Cable Installation
Cable Bending
Cable Bonding
Connector Saver Plan
2
GLAST Project
Installation Review
L
A
T
Tracker Mock-up Engineering Development
•
CMM Program established from Tower Mock-up
model
Developed in Bay area and at INFN
•
Experience gained from Mock-up
Tower to Grid simulator installation
Alignment of Eccentric cones
Testing of the CMM program
•
Differences between Mock-up model and E.M.
(Flight like) model
Corner Flexures are non flight like (older rev.)
Does not contain corner brackets or flight like
reflector ball nests
July 28 2004
3
GLAST Project
Installation Review
L
A
T
Tower Alignment Summary
•
Measurements at INFN
–
–
–
–
–
–
–
•
Used their CMM which runs PC-DMIS
Created measurement scripts for automated measurements
Derived CS which puts tower in optimized position, i.e. Z-axis vertical wrt gravity, X, Y
symmetrical to actual shape
Determined coordinates of flexure conicals in tower CS
Comparing actuals vs design yields dial-in settings for cones
Applied settings, mounted tower to base
Cross-checks good to 500 µm (TBs too small and loose)
Planned measurements at SLAC
– Verify procedure by independently creating equivalent measurement routine on our
Leitz PMM using Quindos
– Repeat measurement / alignment cycle at least three times
July 28 2004
4
GLAST Project
Installation Review
L
A
T
I&T Flow For Tracker Installation
Remove CAL,
TEM, TEM-PS, &
TKR Tower from
Single Bay
Install TKR
into alignment
fixture
Prepar
e
Grid
Bay
Inspect,
Metrology
& El Test
Test
Measure
TKR and
Align
Cones
Install TKR
Tower into
Grid Bay
Install TKR
Tower into
Single Bay
Install CAL,
TEM, &
TEM-PS
Receive
TKR
Tower
July 28 2004
Final
Test
Install
CAL, TEM,
& TEM-PS
5
GLAST Project
Installation Review
L
A
T
Grid Interface Hardware list
•
•
•
•
•
•
Installation Shims: LAT-DS-03506
Outer Eccentric Cone: LAT-DS-02788
Inner Eccentric Cone: LAT-DS-02787
Hex Bushing: LAT-DS-02789
Hex Nut: LAT-DS-03925
Shoulder Stud: LAT-DS-02791
Corner Flexure
Grid
July 28 2004
6
GLAST Project
Installation Review
L
A
T
Notation
-X,+Y
+Y, -x
-X, +y
Grid Simulator
(Tower base plate)
-X,-y
+Y, +x
+X,+Y
-X,-Y
+Y
(reference location)
(reference location)
+X
+Z
-Y, -x
+X, +y
+X, +y designates
the stud on the + y
side of the flexure
which is on located
on the +X side wall.
July 28 2004
For all side flexures, the side
flexure identifier is capitalized,
while the side flexure conical
(stud) is in lower case.
+X,-y
+X, -Y
(reference location)
-Y, +x
7
GLAST Project
Installation Review
L
A
T
Installation Procedure (Static test) - INFN
•
Refer to section 2.1 of LAT-DS-0425-01
•
Installed Grid simulator with no Aligning
– Performed on Tower Mock-up
– requires no Aligning tools
– Adjusting tools required
•
Preset three inner and outer cones to the
concentric position
For three reference locations
Used to locate the position of Tower
Align slots on both cones
•
Remaining cones are to be “Dithered”
Process in which cones seat to their required
position
July 28 2004
8
GLAST Project
Installation Review
L
A
T
Presetting Procedure
Refer to section 6.1 of LAT-DS-04245
Section 6.1.9: determine α by using Matlab program “angtool”
Setting α, “inner to outer cone angle”
July 28 2004
9
GLAST Project
Installation Review
L
A
T
Installation Procedure (Aligning to CMM measurement) - INFN
•
Refer to LAT-MD-03566 and LAT-PS-04245
Determine β for each reference location
LAT-PS-04245: Section 2.3
Tower C.S
+Z
Tower C.S
+Z
Calculate Flexure Point
offsets from nominal
and check against
available travel
Struc C.S
+Z
Define a coordinate system
based on the location of
Top and Bottom Tray Hardware.
Then move it so it is centered
on the shape and size of the
Sidewalls
Set Eccentric Cone rotation,
then mount Grid Simulator
and fit with shims.
July 28 2004
10
GLAST Project
Installation Review
L
A
T
Installation Adjusting Procedures
•
Dithering
Process in which cones seat to their
required position
Tool LAT-DS-04337
•
Shimming Procedure
Refer to LAT-PS-04245 section 9
•
•
•
Measurement of gap
Selection of shim stack
Cone removal procedure
Refer to LAT-PS-04245 section 8
•
•
•
•
Assembly of the cone Extractor
Removal of the Inner cone from the
Corner Flexure
Removal of the Outer cone from the
Corner Flexure
Separation of Inner cone from Outer cone
July 28 2004
11
GLAST Project
Installation Review
L
A
T
Alignment Tools
INTERFACE AND ALIGNMENT TOOLS FOR TOWER "A"
Item
Drawing
Number
Title
LAT-DS-04336
Outer Cone
Adjuster,
Spanner
Inner Cone
Adjuster,
Spanner
LAT-DS-04337
Dithering
Tool
1
LAT-DS-04335
2
Vendor
Contact Cost
Number Total
CONE ADJUSTING TOOLS
Recommended
Quantity Needed
at each
Installation sight
Quantity at
INFN
Quantity at
SLAC
3 (Sets)
2 (Sets)
0
SLAC
3
2
0
10?
3?
0
Need
Date
Delivery
Date
Comments
TBD
30-Jul-04
30-Jul-04
Need to order sets for I&T
need date
SLAC
TBD
30-Jul-04
30-Jul-04
SLAC?
TBD
30-Jul-04
30-Jul-04
3
Done
Need to order sets for I&T
need date
Need to order for I&T need
date, possible outside
vendor
CONE ALIGNMENT TOOLS
4
LAT-DS-04345
Alignment
Template
Alignment
Block
LAT-DS-04346
Alignment
Dial
2
1
1
SLAC
TBD
13-Aug-04
TBD
LAT-DS-04347
Cones
Aligner
2
2
0
SLAC
TBD
13-Aug-04
TBD
LAT-DS-04348
Clamping
Template
6
3
1
SLAC?
TBD
13-Aug-04
TBD
LAT-DS-04344
5
2
1
2?
SLAC
TBD
13-Aug-04
TBD
2
1
0
SLAC
TBD
13-Aug-04
TBD
6
7
8
Touches Cones, need
Q.C.?? Possible material
change to steel?
Need to order one for I&T
need date
Touches Flight Cones,
need Q.C.?? Need to order
for I&T need date.
Touches Flight Cones,
need Q.C.?? Need to order
for I&T need date.
Contact Flight Flexure,
need Q.C.?? Need to order
for I&T need date.
CONE EXTRACTION TOOLS
LAT-DS-04339
Extraction
Rod
2
2
0
SLAC
TBD
30-Jul-04
30-Jul-04
LAT-DS-04340
Extraction
Tube, Inner
Cone
4
3
0
SLAC
TBD
30-Jul-04
30-Jul-04
4
2
0
SLAC
TBD
30-Jul-04
30-Jul-04
2
2
0
SLAC
TBD
30-Jul-04
30-Jul-04
2
0
0
SLAC
TBD
TBD
TBD
9
10
11
LAT-DS-04341
12
LAT-DS-04342
13
TBD
July 28 2004
Extraction
Tube, Outer
Cone
Pull Rod
Base
Extraction
Bracket
Need to order some for I&T
need date
INFN will be able to use
future extraction bracket,
due to access from behind.
Need to order some for I&T
need date
INFN will be able to use
future extraction bracket,
due to access from behind.
Need to order some for I&T
need date
Need to order some for I&T
need date
Needs to be Designed. For
use at INFN (Arthur?)
12
GLAST Project
Installation Review
L
A
T
Additional Topics
•
Optical Survey Tools
•
Near-Term Plans
Final CMM of Mock-up at SLAC (8/5-6 tbd)
I&T Training
Grid I/F Hardware for I&T
•
Future Topics (Next Meeting)
Flex Circuit Cable Installation
Cable Bending
Cable Bonding
Connector Saver Plan
July 28 2004
13
GLAST Project