Haiti Wind
Project
(Summer 2011)
By Kacie O’Neil
Introduction
 Energy
Grand Challenges
 Professor Catherine Peters (CEE) was the
advisor
 Internship focused on Sustainable Energy
and easy deployment
 I focused mainly on structural analysis
Initial Challenge
 Generate
a large amount of power (kW)
 Parts had to fit into a standard shipping
container
 Easily deployable wind generator
Background
 Standard




Shipping container holds:
Easily deployable wind turbine
Solar panels to supplement wind turbine
Easily deployable and possibly telescoping
tower to hold turbine
Turbine equipment including generator,
battery, etc.
 Originally
intended for cases such as
disaster relief (Haiti)
How the project has changed
Vertical Axis Wind Turbines
http://www.google.com/imgres?imgurl=http://www.manufacturer
.com/upload/product/6414997/Vertical%2BAxis%2BWind%2BTurbin
e%2BGenerator_0_detail.jpg&imgrefurl=http://www.manufacturer.
com/product/m6414997Vertical%2BAxis%2BWind%2BTurbine%2BGenerator.html&usg=__61k
xs7R1sk8wxRLNSKdb6Nfc5Y=&h=400&w=300&sz=10&hl=en&start=0&z
oom=1&tbnid=c7YpWGWl5qpyM:&tbnh=163&tbnw=110&ei=PK4lTtr6FcmBgAeLnbHvBQ&pre
v=/search%3Fq%3Dvertical%2Baxis%2Bwind%2Bturbine%26um%3D1
%26hl%3Den%26safe%3Doff%26sa%3DN%26biw%3D1599%26bih%3
D789%26tbm%3Disch&um=1&itbs=1&iact=hc&vpx=1029&vpy=226
&dur=1625&hovh=259&hovw=194&tx=104&ty=134&page=1&ndsp=
39&ved=1t:429,r:15,s:0&biw=1599&bih=789
http://www.google.com/imgres?imgurl=http://images.suite1
01.com/821112_com_quietrev01.jpg&imgrefurl=http://www.s
uite101.com/view_image_articles.cfm/821114&usg=__koSp_1
IqWb05hsrk2wPAS7iE1Dg=&h=818&w=567&sz=426&hl=en&sta
rt=39&zoom=1&tbnid=2fisqsurIceNM:&tbnh=180&tbnw=122&ei=PK4lTtr6FcmBgAeLnbHvBQ&
prev=/search%3Fq%3Dvertical%2Baxis%2Bwind%2Bturbine%2
6um%3D1%26hl%3Den%26safe%3Doff%26sa%3DN%26biw%3D
1599%26bih%3D789%26tbm%3Disch&um=1&itbs=1&iact=hc&
vpx=988&vpy=444&dur=96&hovh=270&hovw=187&tx=70&ty=
195&page=2&ndsp=32&ved=1t:429,r:13,s:39&biw=1599&bih=
789
Horizontal Axis Turbine
http://www.google.com/imgres?imgurl=http://wpcore.smallwt.s3.a
mazonaws.com/wp-content/uploads/2009/11/Horizontal-Axis-WindTurbine.jpg&imgrefurl=http://www.smallwindtips.com/2009/11/vertic
al-axis-wind-turbines-vs-horizontal-axis-windturbines/&usg=__pmqWPIk4qVNEK1gL0OLzYxwXzY8=&h=262&w=200
&sz=7&hl=en&start=0&zoom=0&tbnid=omdzP80u4Qj8fM:&tbnh=112
&tbnw=85&ei=VK8lTqi9AZLUgAeW8snvBQ&prev=/search%3Fq%3Dh
orizontal%2Baxis%2Bwind%2Bturbine%26um%3D1%26hl%3Den%26saf
e%3Doff%26biw%3D1599%26bih%3D789%26tbm%3Disch&um=1&itbs
=1&iact=hc&vpx=1082&vpy=443&dur=1719&hovh=112&hovw=85&tx
=64&ty=52&page=1&ndsp=34&ved=1t:429,r:23,s:0&biw=1599&bih=7
89
Goals for Internship

Main Goal: build/design a prototype




Half scale model
For a competition in April
Looking for commercially made parts
This included:




Finding a turbine
Choosing a battery
Finding a mast system that can fit in the
“shipping container” (half size model)
Figuring out how to ship the prototype
Constraints





Size of parts they have to fit into a box of
limited size
Weightwhatever goes up in the air must be
supported on the ground
Deployment  needs to be set up/put up by
humans (no machines)
Construction  must be able to be packed
up and shipped elsewhere
Cost  we currently have a very limited
budget
Current design
Haiti Challenge
Current Design
 Combines
wind and solar power
 The purpose of the solar is make the
power generation more constant
 Intentions: provide energy and possibly a
source of income to pay for repair costs
SAP
Computer Modeling
Examples of Stress on a SAP
Model
SAP Models Material
SAP Model
What I was modeling
http://www.alumatower.com/new/gallery/index.php?action=showGallery&galleryid=14
Deformed Shape
Conclusion
 Prototype
was planned but not built (no
space during the summer)
 Learned a lot about structural analysis
 Gained valuable experience working on
a research project learning about how to
revise plans to make them better