UC Science Building conditions
Download
Report
Transcript UC Science Building conditions
LSA Testbed: Preliminary Contents Data
University Science Building Case Study
Laboratory Details
Life Safety
Chemical Hazard
High Value
Important
Critical Contents by Importance, Value,
Life Safety and Chemical Hazard
Specialized
Equipment is
Costly and
Irreplaceable
Fragile Biological
Samples are Critical
to Researchers
Storage has Life
Safety and
Chemical Hazards
Contents Database: Basis for Cost
Estimating and Loss Modeling
NUMBER OF ITEMS BY LIFE SAFETY PRIORITY
D
4%
C/SL
2%
D/SL
0%
CH CH/SL
2%
2%
A
11%
A
A/SL
15%
C
26%
A/SL
B
B/SL
C
C/SL
D
D/SL
B/SL
2%
CH
B
36%
CH/SL
NUMBER OF ITEMS BY LIFE SAFETY PRIORITY
2
468
260
216
A
1178
A/SL
187
1615
B
B/SL
2700
C
C/SL
D
D/SL
158
3673
CH
CH/SL
PERCENT OF ITEMS IN EACH VALUE GROUP
3
1.61%
4
0.47%
5
0.05%
6
0.08%
7
0.03%
2
9.23%
1
2
3
4
5
6
7
1
88.54%
PERCENT OF TOTAL VALUE BY VALUE GROUP
2
17.1%
3
6.0%
4
4.1%
1
2
3
4
5
0.9%
6
3.3%
1
65.8%
7
2.8%
5
6
7
RETROFIT COSTS
$1,000,000
$883,205
$900,000
$800,000
$668,715
$700,000
NOTE:
AN ITEM COULD BE IN MORE THAN
ONE CATEGORY.
$600,000
$500,000
$392,040
$357,818
$400,000
$300,000
$128,862
$200,000
$100,000
$14,820
$0
A
B
C
D
LIFE SAFETY DESIGNATION
SL
CH
RETROFIT COSTS ASSUMING IN-PLACE MEASURES ARE EFFECTIVE
$1,000,000
$900,000
NOTE:
AN ITEM COULD BE IN
MORE THAN ONE
$800,000
TOTAL RETROFIT COST
$700,000
RETROFIT COST EXCLUDING WORK
PERFORMED
$600,000
$500,000
$400,000
$300,000
$200,000
$100,000
$0
A
B
C
D
LIFE SAFETY DESIGNATION
SL
CH
CUMULATIVE RETROFIT COSTS BY PROPOSED COMBINATION
$2,500,000
$2,316,598
$2,000,000
$1,595,908
$1,500,000
$914,408
$1,000,000
$500,000
$0
VALUE(4+5+6+7)+IMP+B+SL+C+D+CH
VALUE(4+5+6+7)+IMP+C+D+CH
VALUE(6+7)+IMP+D+CH
LIFE SAFETY / IMPORTANCE/VALUE DESIGNATION