MB Meeting 10/3/2007 - RIGO Update
Download
Report
Transcript MB Meeting 10/3/2007 - RIGO Update
RIGO Update
Xcel Energy
Jason Standing
Jeffrey Norman
October 3, 2007
Updates Since Last Meeting
Options 1,2,3, and 4 (western options) have
been dismissed as possible options.
Focus instead on the southeastern portion of
Minnesota.
Created a few combination options.
Option 5: Owatonna-Austin
Corner 161 kV
53 MW of outlet
Option 5b
– Second Pleasant Valley
345/161 kV line
– 308 MW of outlet
Option 8: Blue Earth-Loon
Lake 161 kV
220 MW of outlet
Option 9: Pleasant Valley-Blue
Earth 161 kV
43 MW of outlet
Option 9b
– Second Pleasant Valley
345/161 kV line
– 330 MW of outlet
Option 11: Loon Lake-Jackson
161 kV
130 MW of outlet
Option 11a
– Reconductor of the
Lakefield-Triboji 161 kV
line
– 255 MW of outlet
Option 5b9
Option 5b9:
– Owatonna-Austin
Corner 161 kV
– Pleasant Valley-Blue
Earth 161 kV
– Pleasant Valley
345/161 kV tx
268 MW of outlet
Option 5b9a
– Second Maple Leaf-Byron
circuit
– 412 MW of outlet
Option 5b9ab
– Option 5b9a with tripping
of new generation for loss
of Pleasant Valley 345/161
tx
– 617 MW of outlet
Option 89: Pleasant ValleyBlue Earth-Loon Lake 161 kV
47 MW of outlet
Option 89a
– Second Pleasant Valley 345/161 kV tx
– 365 MW of outlet
Option 89ab
– Second Maple Leaf-Byron circuit
– 572 MW of outlet
Where to go from here?
Run a few more sensitivity cases.
Determine which option to go forward with.
Write up a draft report and send it out for
review.
Write the final report.