Transcript Powerpoint - Energy Efficiency Opportunities
Page 1
Introduction
Energy Management
• Generally static
• Based on historical data
Control Systems
• Real time control of processes
• Processes track to a collection of set points
• Run the process within certain limits
Systems Optimisation
• Use real time data
• Adjust system wide set points to optimise profits
• Take into account external factors
• Whole of system focus – optimise across whole
system not just individual process
Increasing complexity
Increasing control
Greater efficiency
Page 2
What is System Optimisation?
Optimiser uses historical data and
predictive algorithms to optimise
performance
Information sent back to process via
control system
Controller provides process information
to optimiser
Optimised instructions sent back to
process
Information from process sent to control
system
Optimised instructions sent back to
process
Page 3
What is System Optimisation?
Offline open loop
systems optimisation
Online open loop
systems optimisation
Closed loop real time
systems optimisation
Simplot Australia (energy
metering and energy
performance indicators)
AngloGold Ashanti (singlevariable control)
Worsley Alumina (multivariable control)
Increasing automation
Simplot Australia (variable
head pressure control of
refrigeration plant)
Page 4
Costs and Benefits
BENEFITS
Increased throughput
(3% to 5%)
Increased energy efficiency
(3% to 5%)
Decreased energy costs
Increased product quality
(10 to 20%)
Decreased operator input
Payback periods of 6 months to 4 years
POSSIBLE COSTS
Engineering
New instrumentation
New controls equipment
Training
Page 5
Australian Case Study - Simplot
Background
Food company in Devonport, Tasmania
Produce frozen vegetables
Time critical process
No energy sub-metering
Motivation
Improved energy management – cost increases
Reduce energy intensity by 25%
Benefits
Reduced energy intensity by 20%
Reduced energy costs
Reduced partial loading of compressors
Greater process resilience
Page 6
Australian Case Study – AngloGold Ashanti
Background
Sunrise Dam Gold Mine
Operating since 1995
Typical Carbon-in-leach process
Motivation
Optimise throughput
Eliminate causes of downtime
How Systems Optimisation was implemented
Took stock of existing control systems
Prioritised causes of downtime
Identified control improvements
Trained operators
Monitored results
Page 7
Australian Case Study – AngloGold Ashanti
Benefits
Fewer maintenance events
Increased throughput
Improved energy efficiency
Reduced Unit Costs
Next Steps
Processing plant optimised
Look at upstream processes next
Page 8
Australian Case Study – Worsley Alumina
Background
Refinery opened in 1984
Upgrades started in 2004
Motivation
Improve profitability
Automate operator knowledge
Page 9
Australian Case Study – Worsley Alumina
How Systems Optimisation was implemented
Mandate from Senior Management
Front end study
Implementation of Multi-variable control
Continuous measurement of results
Page 10
Australian Case Study – Worsley Alumina
Benefits
More accurate control, less operator intervention
Optimised set-points = improved profitability
Reduced maintenance costs
Improved reliability
Page 11
Australian lessons learned
Make the most of what you have before you invest
Prepare a persuasive business case – whole of business costs
and benefits
Undertake a staged implementation process
Ensure you have access to the required skills
Manage the learning process
Maintain operator proficiency
Page 12
Key Industries
Overseas industries that have benefited:
Large commercial buildings
Power generation
Cement manufacture
Petrochemical
Steel making
Australian industries that could benefit:
Food processing
Minerals processing
Transport
Commercial buildings
Page 13
Legal Disclaimer
Important Notice
Energy Made Clean Limited [ABN 95 108 702 101] was incorporated on 13 April 2004 and is currently an unlisted public company limited by shares. It was approved and registered as a Pooled Development Fund (PDF) on 31 May 2004.
The Information in this document is to be provided only to those people who have expressed an interest in investing in Energy Made Clean Limited and is personal to them and will only be offered to investors and to persons who qualify for
exempted issues of securities pursuant to section 708 of the Corporations Act ("Recipient").
Confidentiality
The Recipient of this Information Memorandum shall be deemed to have acknowledged, upon and solely by virtue of receipt of a copy of this Information Memorandum, to and for the benefit of Energy Made Clean Limited and their
authorised agents, that the contents of the Document, both in whole and in part or parts:
will be treated as strictly confidential;
will not be disclosed to any other persons or entity, whether an associate or related corporation of the recipient, other than an employee or professional advisor to the recipient and then only for the sole purpose of that Recipient
considering and taking advice as to whether to proceed with the offer to invest; and
will not be reproduced, either in whole or in any part or parts, without prior written consent of Energy Made Clean Limited and, if any such written consent is given, only for the purposes referred to in paragraph two above.
Disclaimer
The information contained in this Information Memorandum or subsequently provided to the Recipient of this Information Memorandum, whether orally or in writing by or on behalf of Energy Made Clean Limited or their respective
employees, agents, advisers or consultants ("Information") is provided to the Recipients on the terms and conditions set out in this notice. The Recipient should not treat this Information as advice relating to legal, taxation or investment
matters and should consult their own professional advisers.
The Information includes certain statements, estimates and forecasts which reflect various assumptions. Those assumptions may or may not prove to be correct. The Information does not purport to contain all the information that a
prospective investor may require. The Information may not be appropriate for all persons and it is not possible for Energy Made Clean Limited to have regard to the investment objectives, financial situation and particular needs of each
Recipient who reads or uses this Information. In all cases, before acting in reliance on any Information, the Recipient should conduct their own investigation and analysis in relation to the completeness of the Information and obtain
independent and specific advice from appropriate professional advisers.
The financial projections contained in this Information are necessarily subject to a high degree of uncertainty and may vary materially from actual results. They are based, among other things, on certain key assumptions as set out in this
Information Memorandum, on which each Recipient must make their own independent assessment and investigation. Recipients may request to review all working documents used in preparing the financial projections.
Energy Made Clean Limited and its advisors reserve the right to evaluate any funding offers and to reject any and all offers submitted, without giving reasons for rejection. Energy Made Clean Limited shall not be liable to compensate the
Recipient or any intending investors for any costs or expenses incurred in reviewing, investigating or analysing any information in relation to Energy Made Clean Limited in making an offer or otherwise.
The Information is provided to the recipient only as a matter of interest. It does not amount to a recommendation, either expressly or by implication, with respect to an investment in Energy Made Clean Limited. The Information is subject to
clarification and change and Energy Made Clean Limited may in its absolute discretion, but without being under any obligation to do so, update, amend or supplement the Information.
This Information Memorandum is not, and should not be construed to be, any form of a Prospectus or other disclosure document as required by section 709 of the Corporations Act.
All enquiries regarding this document should be in the first instance directed to:
John Davidson
CEO, Energy Made Clean Limited
18 Colin Street
West Perth WA 6005
Email: [email protected]
Page 14
Spent Liquor Temperature Variation Before & After MVC.
30.0%
25.0%
20.0%
15.0%
10.0%
5.0%
0.0%
70
72
74
76
78
80
82
84
86
88
Temperature (degC)
BaseCase
PerfRun
Page 15
Operator moves for 3 different processes before and after MVC.
140
122.4
120
Moves/day
100
80
60
40
32.7
31.1
20
30.1
28.4
13.9
3.9
3.6
3.8
2.7
0
All MV's
Tr1A
Tr1B
MVC Off
Tr2A
Tr2B
MVC On
Page 16
Levels of Process Control
SO
Systems Optimisation
(multiple process units)
Advanced Process
Control (multivariable
process unit)
Advanced Regulatory Control
(single variable feed forward/back
loop control)
Basic Regulatory Control (single variable, single
loop control)
Instruments & Actuators
Processing Plant
Page 17
Page 18
Discussion – Systems Optimisation
• Do you think your corporation currently optimises its existing
energy management tools?
• Do you think there are aspects of systems optimisation that
could be explored by your corporation?
ENHANCING AUSTRALIA’S ECONOMIC PROSPERITY