Transcript Lester.ppt

Embry-Riddle’s NextGen Role
Wade Lester
Program Manager
NextGen
Research
NextGen
Program
Management
DB NextGen
Test Bed
Management
Consortium
Leadership
Overview
•
•
•
•
Integrated Airport Initiative
Daytona Beach NextGen Test Bed
Other Transaction Agreement (OTA)
Work Under the OTA
– Integrate Weather into TMA and ERAM
– International Flight Data Object
– Unmanned Arial Vehicle Research
NextGen
Research
NextGen
Program
Management
DB NextGen
Test Bed
Management
Consortium
Leadership
Embry-Riddle’s NextGen Role
Consortium Leadership
NextGen
Research
NextGen
Program
Management
DB NextGen
Test Bed
Management
Consortium
Leadership
Integrated Airport Initiative
• A consortium of industry leaders to research
and promote NextGen concepts
• Formed March, 2006
• Catalyst for the development of what is now
the Daytona Beach NextGen Test Bed
Consortium
Leadership
Integrated Airport Initiative
•
•
•
•
IR&D
Surface Research
Member and Sponsor Supported
Roadmap Complete by February 2009
Consortium
Leadership
Membership
*ERAU
*Lockheed Martin
Boeing
CSC
Ensco
Frequentis
Mosaic ATM
Sensis
Volpe Center
Barco
Harris
* co-lead
Consortium
Leadership
Embry-Riddle’s NextGen Role
Test Bed Management
NextGen
Research
NextGen
Program
Management
DB NextGen
Test Bed
Management
Consortium
Leadership
Daytona Beach NextGen
Test Bed (DBNTB)
• Initially named the Integrated Airport
• DBNTB provides the platform for research and
development of NextGen concepts
• DBNTB will evolve into a robust platform that will
support myriad systems and technologies
Learn more: www.nextgenair.org
DB NextGen
Test Bed
Management
DBNTB Enhancements
• Installed additional data storage capacity
• Install Lockheed-Martin’s ERAM system – limited
capability – mid-October
• Install CSC’s Traffic Management Advisor (TMA) –
limited capability – mid-October
• Install additional power capacity – in progress
• Install 10mbps Internet connectivity – in progress
• AT Coach simulation software – procurement in
progress
DB NextGen
Test Bed
Management
DBNTB Future Plans
 Future Plans
◦ Possible second site
◦ Future funding for DBNTB
DB NextGen
Test Bed
Management
NextGen Test Bed Systems Architecture
ENSCO WRF
Model
ERAU Weather
Application Server
Forecast Convection Data
Lightning
Data
RUC Weather
Service
ENSCO Weather Application Server
Forecast
Convection
Service
Lightning
Provider
ENSCO
Lightning
Service
NEXRAD
Service
National SWIM Application Server
ERAM
Flight
Object
Status Service
Time Service
National Flight
Information
Service
SAA
Information
Service
Status Service
UDDI
Registry
ERAU Weather Services ESB
National SWIM ESB
RUC Data
Ensco Weather Services ESB
Forecast Convection
Product
TMA
Flight Object
RUC
Weather
Client
RUC Data
FPPP
Forecast Convection
Product
Radar Data,
NEXRAD Data,
RUC Data,
User Commands
ERAM Flight
Information
Service
ERAM
SAA
Status Service
SAA Web
Page
ZJX ERAM SWIM ESB
Surveillance Application Server
ADS-B Service
TIS-B Service
TIS-B
ADS-B
TIS-B
Provider
ADS-B
Provider
Radar Data
Radar Service
Status
Status Service
Radar
Provider
FltWinds
CMS
ZJX ERAM SWIM Application Server
ATCoach
Flight Object
Forecast
Convection
Product,
Lightning,
NEXRAD
Status
Status Client
Flight Object,
SAA
Visualization
Tool
Radar Data,
ADS-B,
TIS-B
Status
Flight Object
Status
Surveillance ESB
Status
Terminal System Track,
Conformance Bounds,
Conformance Alerts,
RVR
Flight Object
RVR Data
MCO TDDS Application Server
Terminal
System Track
Info Service
TDDS Flight
Information
Service
Conformance
Alert Service
Conformance
Bounds Service
Runway Visual
Range Service
MCO TDDS ESB
TDDS
Flight Object,
Conformance
Alerts,
Conformance
Bounds
Terminal
System
Track
TDDS
Flight
Object
Surface
Flight
Data
TDDS
Flight
Object
TDDS
Flight
Object,
Terminal
System
Track
Conformance
Alerts,
Conformance
Bounds
Radar Data
CARTS
SDSS
Lightning Object
SAA
Radar Data
EFS
Conf Monitor
Status Service
RVR
Provider
RUC Data
Ensco Weather Services ESB
Forecast Convection
Product
Forecast Convection
Product
RUC
Weather
Client
RUC Data
CMS
ZJX ERAM SWIM Application Server
ATCoach
Radar Data,
NEXRAD Data,
RUC Data,
User Commands
ERAM Flight
Information
Service
ERAM
Status Service
ZJX ERAM SWIM ESB
e Application Server
S-B Service
TMA
Radar Data
Radar Service
TIS-B
ADS-B
TIS-B
Provider
ADS-B
Provider
Status
Status Service
Radar
Provider
Status
Status Client
Status
Flight Object
Status
Surveillance ESB
Status
Flight Object
MCO TDDS Application Server
Terminal
System Track
Info Service
TDDS Flight
Information
Service
Conformance
Alert Service
Conformance
Bounds Service
Runway Visual
Range Service
Status Service
Embry-Riddle’s NextGen Role
Program Management
NextGen
Research
NextGen
Program
Management
DB NextGen
Test Bed
Management
Consortium
Leadership
Other Transaction Agreement
(OTA)
• Key Points
–
–
–
–
–
In effect until 2013
Embry-Riddle is the prime
Embry-Riddle provides the Program Manager
Tasks assigned to consortium members
Other agencies can use this contract vehicle
NextGen
Program
Management
The “OTA”
• Work under this OTA … expands the integrated airport
concept and laboratory to serve as a Next Generation Air
Transportation System (NextGen) Test Bed
• ERAU and the FAA will perform operational research,
evaluation and demonstration of synergy among available,
emerging and planned NextGen concepts, procedures,
technologies and capabilities at the NextGen Test Bed, and
at other facilities or locations as required by specific tasking.
• This facility is a component of the NextGen Test Bed
centered on the state of Florida.
NextGen
Program
Management
R&D Activities
NextGen
Program
Management
OTA Activities
 Task A – Demonstrate the Integration of Convective
Weather into TMA and ERAM:
◦ Effort supported by: Embry-Riddle, LockheedMartin, CSC, Ensco, Boeing, Volpe Center
◦ Project is well underway and on schedule.
◦ The formal demonstration is scheduled for
November 18, 2008.
◦ A second event for Test Bed ribbon cutting and
demonstrations for VIPs and media is planned for
Spring 2009.
NextGen
Program
Management
OTA Activities
 Task D – Flight Data Object Demonstration
◦ Effort supported by: Lockheed-Martin and EmbryRiddle
◦ The kickoff meeting was conducted and issues
resolved.
◦ The project plan drafted and submitted to
members.
◦ The formal demonstration is scheduled for early
March, 2009.
NextGen
 Task E – UAV Research Opportunity
Program
Management
Program Schedule
NextGen
Program
Management
Task A – Integrated Wx Into
TMA and ERAM
• Network-enabled integration of predictive weather into
TMA and ERAM
– “Reduce Weather Impact” solution set in the
NextGen Implementation Plan
• Concept demonstration, not an acquisition or
implementation solution
• All documents will be made available to the public.
NextGen
Program
Management
Task A – Integrated Wx Into
TMA and ERAM
• Benefits:
– Showing how the integration of predictive weather
into decision support tools may improve operations
by allowing for proactive planning.
– Using an open architecture (swim-like) to integrate
predictive weather into ERAM and TMA.
– Providing RUC data to TMA from an alternative
source via swim-like concepts.
NextGen
Program
Management
D-Pos AT
Controller
R-Pos AT
Controller
PGUI
Operator
TMA
ERAM
D-Pos
TGUI
Operator
R-Pos
PGUI
TGUI
HADDS
Flight Information
Track Information
Route Status
Conflict
Probe
General Information
Metering List Updates
HADDS ZJX
Adaptation
Data
Metering Data
TMA
Processes
TMA ZJX
Adaptation
Data
RUC Data
CREW
Flight
Information
Service
Radar Data
User Commands
NEXRAD Data
RUC Data
Note: This diagram is not
the final “as-is” diagram.
It is for discussion
purposes only at this
time.
Simulation
National
NEXRAD
Data
Route Status
General Information
ERAM ZJX
Adaptation
Data
National
RUC
Data
Flight Plans
Track Information
Metering List Updates
Metering Data
Flight
Objects
Flight Information
HADDS
Interface
Simulation
Generation
Tool (SGET)
ATCoach
Sim
Scenario
Simulation
Engine
(ATCoach)
ATCoach
Weather
Scenario
Flight Plans
ERAM RUC
Data
Flight Plan
Controller
Pseudo
Pilot
RUC Data
D-Pos AT
Controller
R-Pos AT
Controller
PGUI
Operator
TMA
ERAM
D-Pos
TGUI
Operator
R-Pos
PGUI
TGUI
HADDS
Flight Information
Wx Conflicts
Forecast
Convective
Wx
Track Information
Route Status
Conflict
Probe
Forecast Convective Wx
TMA
Processes
Route Status
General Information
General Information
Metering List Updates
Metering Data
Metering Data
HADDS ZJX
Adaptation
Data
ERAM ZJX
Adaptation
Data
FP Updates
Track Information
Metering List Updates
Forecast Convective Wx
IA3
Flight Information
HADDS
Interface
TMA ZJX
Adaptation
Data
Forecast Convective Wx,
RUC Data
CREWS/
CWX
ftp RUC
Data
RUC Data
RUC Data
Forecast Convective Wx
Flight
Objects
Flight
Information
Service
Forecast Convective Wx
Convective
Weather
Client
RUC Weather
Client
RUC Data
Flight Plan Updates
Forecast Convective Wx
SWIM
Radar Data
User Commands
NEXRAD Data
RUC Data
Forecast Convective Wx
Ensco Weather Services
National
RUC
Data
National
NEXRAD
Data
Simulation
ATCoach
Sim
Scenario
Simulation
Generation
Tool (SGET)
Forecast
Convection
Data
Simulation
Engine
(ATCoach)
Ensco Forecast
Convection
Service
RUC Data
Forecast Convective Wx
ERAU Weather Services
ATCoach
Weather
Scenario
ERAM RUC
Data
Flight Plan Updates
Flight Plan
Controller
Ensco Weather Model
Flight Plan Updates
RUC Data
Forecast
Convection
Data
ERAU RUC
Weather Publisher
Service
WRF Model
RUC Data
Pseudo
Pilot
Weather Data
Inputs
NextGen Testbed
Weather Server
Embry-Riddle’s NextGen Role
Wade Lester
Program Manager
NextGen
Research
NextGen
Program
Management
600 South Clyde Morris Blvd
Daytona Beach, FL 32114
[email protected]
386-226-6418
DB NextGen
Test Bed
Management
Consortium
Leadership