Status of the AASHTO Roadside
Design Guide Update
Annual AASHTO Subcommittee on Design Meeting
July 25-29, 2010 Columbia, South Carolina
Rod Lacy, P.E.
Kansas Department of Transportation
July 27,2010
2010 SCOD Columbia, SC
RDG Update Objectives
 Statistics Updated
 Incorporated Research
 Incorporated AASHTO “MASH” document
 Referenced safety hardware websites for
designer use.
July 27,2010
2010 SCOD Columbia, SC
2
RDG 2010 – Highlights of Changes

Chapter 1 – An Introduction to Roadside
Safety
– Updated roadside crash statistics
– References FHWA Acceptance Letter Web Site
July 27,2010
2010 SCOD Columbia, SC
4
Percent distribution of fixed-object fatalities by object struck, 2008
July 27,2010
2010 SCOD Columbia, SC
5
1975-2008
July 27,2010
2010 SCOD Columbia, SC
6
RDG 2010 – Highlights of Changes

Chapter 2 – Economic Evaluation of
Roadside Safety
– Editorial updating only
July 27,2010
2010 SCOD Columbia, SC
7
RDG 2010 – Highlights of Changes

Chapter 3 – Roadside Topography and
Drainage Features
– “Clear-Zone” terminology coordinated with
Green Book
– Clear-Zone for auxiliary lanes defined
– Curb discussion moved to Chapter 5
July 27,2010
2010 SCOD Columbia, SC
8
RDG 2010 – Highlights of Changes

Chapter 4 – Sign, Signal, and Luminaire
Supports, Utility Poles, Trees, and Similar
Roadside Features
– Update breakaway discussion re: MASH –
pickup test, windshield damage, roof crush
– Cites MUTCD Breakaway Requirement
– Recommends breakaway devices in urban
areas
July 27,2010
2010 SCOD Columbia, SC
9
RDG 2010 – Highlights of Changes

Chapter 4 – Continued
– Requires electrical quick disconnect devices
– Emphasizes the need for omni-directional
supports in various locations
– Discusses high mast lighting supports and
traffic signal supports
– Refers to NCHRP Report 500, Volume 8 for
dealing with utility poles
July 27,2010
2010 SCOD Columbia, SC
10
RDG 2010 – Highlights of Changes

Chapter 5 – Roadside Barriers
– References MASH and Implementation Plan
– Discusses motorcycles and barrier design
– Links to Task Force 13 Guide to Standardized
Highway Barriers and FHWA Acceptance Letters
– New W-beam systems, including MGS and the
proprietary 31-inch systems
July 27,2010
2010 SCOD Columbia, SC
11
Typ. W-Beam
July 27,2010
2010 SCOD Columbia, SC
MGS
12
5:1 Flare Rate
- 65.1 mph
- 4440 lbs
- 36.8 deg
I.S. = 226 kip-ft
Eff. Flare Rate = 4.0:1
July 27,2010
2010 SCOD Columbia,
at 2000P/25 deg/100
kph SC
13
LSC-1
July 27,2010
2010 SCOD Columbia, SC
14
Culvert Opening Protection
July 27,2010
2010 SCOD Columbia, SC
15
RDG 2010 – Highlights of Changes

Chapter 5 – Continued
– Zone of Intrusion concept
– Revised discussion of guardrail behind curbs
– Runout lengths reduced for barrier design
– Guardrail posts in rock or mow strips
– Upgrading existing systems revised
July 27,2010
2010 SCOD Columbia, SC
16
Zone of Intrusion
F:\Roadside Safety\Median
Barrier\Semi over CMB
in Dallas on north
tollway.wmv
July 27,2010
2010 SCOD Columbia, SC
17
Zone of Intrusion
When practical, accommodation of ZOI
should be considered on new and
reconstruction projects.
 Generally, narrowing of the roadway
(including shoulders) is not recommended
on existing high speed facilities to
accommodate this additional distance
behind the barrier.

July 27,2010
2010 SCOD Columbia, SC
18
LRFD Bridge Pier Protection
Requirements
Piers within 30 ft. (9m) of traveled way
– Design for load equivalent to large truck impact
OR
– Shield with barrier to prevent impact by truck
 <10 Feet – Use 54” (1370 mm) high rigid barrier
 >10 ft. (3m) – Use 42” (1070mm) high rigid barrier
 RDG recommends LON based on 15 departure angle,
then transition to appropriate barrier for facility.
July 27,2010
2010 SCOD Columbia, SC
20
LRFD Barrier Offset Guidelines

Need national risk-based warrants
for this criteria that consider:
 AADT,
 Route Classification,
 Bridge Type,
 Site Location Details,
 Risk vs Benefit of Tall Barrier per LRFD
Criteria
 Length of barrier for LRFD criteria, etc

More research needed
July 27,2010
2010 SCOD Columbia, SC
22
RDG 2010 – Highlights of Changes

Chapter 7 – Bridge Railings
– Discusses MASH and LRFD
– Incorporates “Protective Screening at
Overpasses”
– References Task Force 13 Bridge Rail Guide
July 27,2010
2010 SCOD Columbia, SC
23
RDG 2010 – Highlights of Changes

Chapter 8 – End Terminals
– Discusses grading in advance of and behind
terminals
– Lists numerous new terminals and crash
cushions
– Includes a table of Comparative Maintenance
Requirements
July 27,2010
2010 SCOD Columbia, SC
24
RDG 2010 – Highlights of Changes

Chapter 9 – Work Zone Devices
– Generic and Proprietary PCB designs
enumerated
– Reduce deflection / pinned barriers
– Water filled barriers v longitudinal
channelizers
July 27,2010
2010 SCOD Columbia, SC
25
RDG 2010 – Highlights of Changes

Chapter 10 – Roadside Safety in Urban or
Restricted Environments
– Describes an urban clear zone of 4 feet
minimum, 6 feet desirable
– Urban control zone concept: keep obstacles
away from intersections, driveways, speed
change lanes
– Emphasizes 1.5 foot min lateral offset to
obstructions is not a clear zone
July 27,2010
2010 SCOD Columbia, SC
26
RDG 2010 – Highlights of Changes

Chapter 11 - Mailboxes
– Vandal proof mailboxes
– Secure, locked mailboxes
– Lightweight plastic designs
July 27,2010
2010 SCOD Columbia, SC
27
RDG 2010 – Highlights of Changes

Chapter 12 - ROADSIDE SAFETY ON LOWVOLUME ROADS AND STREETS
– New chapter to RDG
– Low cost strategies: SIGNING, MARKING,
AND DELINEATION
– Clear zone
– Roadside hardware
July 27,2010
2010 SCOD Columbia, SC
28
RDG Schedule

Schedule for Publication
– Final balloting by TCRS Summer 2010
– Ballot to SCOD Summer/Fall 2010
– TCRS to address SCOD ballot comments by
Fall/Winter
– Ballot to SCOH by Spring 2011
– Publish Update Summer 2011