Migration of Part 68 Related
Technical Criteria and Test
Methods Documents to a
Joint T1/TIA Standard
Finalized Plan
November 2002
TR419-03-02-008
Review of US Telecom Approval Documents
7/23/2016, #1
Where are we starting from?
Technical Criteria
Test Methods
PART 68, Telephone
TSB-31-B
TIA-IS-968, Telephone
TIA-IS-883, SDT, ADSL
T1.TRQ.6-2001, DSL Services
Future Requirements
TR419-03-02-008
Review of US Telecom Approval Documents
7/23/2016, #2
Where did we agree we want to be!
Technical Criteria
Test Methods
PART 68, Telephone
Joint T1/TIA Document Series
Requirements, TIA
Requirements, T1E1
Future Requirements
TR419-03-02-008
Joint T1/TIA
Document Series
Test Methods
Test Method, TIA
Test Method, T1E1
Test Methods
Review of US Telecom Approval Documents
7/23/2016, #3
How do we get there?
• Need to plan steps to change each affected
document from current form into desired form.
-TIA-968
-T1.TRQ.6-2001
-TSB-31
-TSB-129-A
• Ensure all affected groups are involved or aware
• Set numbering scheme and sub-document content
for new documents
• Document the agreement and desired structure so
each SDO has something to follow.
• Check on any legal wrinkles between SDO’s
TR419-03-02-008
Review of US Telecom Approval Documents
7/23/2016, #4
Questions that need answers.
•
•
•
•
•
•
•
•
•
•
What must happen in general?
What must happen to TIA-968?
What must happen to T1.TRQ.6-2001?
What must happen to TSB-31?
What must happen to TSB-129-A?
Who needs to be involved and when?
What is the SDO Agreement for Joint Standards?
Document Numbering Scheme
Sub-Document Content
Schedule (very tentative)
TR419-03-02-008
Review of US Telecom Approval Documents
7/23/2016, #5
What must happen in general?
• A joint standard must be opened through ANSI.
Number J-STD-068 has been reserved for this work.
• Joint publication between TIA and T1 is possible.
ATIS and TIA have given the go-ahead to proceed.
• Generic document template to be created so all subdocuments have same look and feel. This task has
been assigned to Greg Slingerland and has begun.
• ANSI requires a single “lead” for the overall
document, this still allows for T1E1 or TR41 to “lead”
formulating groups for each of the sub-documents.
TIA has been proposed as the main SDO.
TR419-03-02-008
Review of US Telecom Approval Documents
7/23/2016, #6
What must happen to TIA-968?
• Changes planned prior to now, are still to be made
• Divided into sub-documents according to new plan
• T1E1 DSL sub-document shall include ADSL
material from TIA-968 and be completed in same
time frame as other documents.
• Write Index and General Overview sub-documents
• When J-STD-068 submitted to the ACTA, must
request that TIA-968 be rescinded by TIA and the
ACTA.
TR419-03-02-008
Review of US Telecom Approval Documents
7/23/2016, #7
What must happen to T1.TRQ.6-2001?
• Plan ahead for next revision and see if it can
coincide with move of TIA-968 to new structure (not
gating to TIA-968 plans).
• Rewrite under new document number
• Include ADSL criteria from TIA-968
• Write test methods for all criteria (currently there is
nothing).
• If not coincident with new document then to
supercede TIA’s DSL sub-document.
• When submitted to the ACTA, must request that
T1.TRQ.6 be rescinded by T1E1 and the ACTA.
TR419-03-02-008
Review of US Telecom Approval Documents
7/23/2016, #8
What must happen to TSB-31?
• Existing work to update test methods can continue
except that integrating it into final document is not
required.
• Be sure to write test methods for all criteria that is in
TIA 968 and Part 68
• Individual sections to be divided into new document
structure as TIA-968 is divided up.
• Project for TSB-31-C can be closed afterward since
it will never be published.
• When J-STD for test methods published by TIA,
must request that TSB-31-B be rescinded by TIA.
TR419-03-02-008
Review of US Telecom Approval Documents
7/23/2016, #9
What must happen to TSB-129-A?
• Section 9 on component approval contains
requirements and must be moved to J-STD-068.
• Work to publish TSB-129-B with only references to
the requirements now in J-STD-068 needs to occur
within TR41.11.
TR419-03-02-008
Review of US Telecom Approval Documents
7/23/2016, #10
Who needs to be involved and when?
• TR41 and T1E1 have gotten approval to adopt the
general concept on 23-Aug-2002. They gave
approval on the detailed plan on 22-Nov-2002.
• ACTA needs to be informed of this upcoming
changes and be asked to comment if they see any
concerns. A joint letter will be sent after Nov meeting.
• The FCC also will be informed via a joint letter.
• The finalized document migration plan was
communicated to:
-TR41
-TR41.9
-TR41.11
TR419-03-02-008
-T1E1
-T1E1.3
-T1E1.4
Review of US Telecom Approval Documents
7/23/2016, #11
What is the SDO Agreement for Joint Standard?
• All technical requirements and test methods from
either T1E1 or TIA intended for adoption by the
ACTA are to be included in this joint document and
not published and submitted separately.
• There will be a lead SDO chosen for each subdocument based on who has the best technical
expertise in the given area (new or revision).
• Any project to be opened by either T1E1 or TR41 on
this document will be communicated to the other.
• Involvement by the non-lead SDO during subdocument development or revision, will be obtained
as needed
TR419-03-02-008
Review of US Telecom Approval Documents
7/23/2016, #12
What is the SDO Agreement for Joint Standard?
• All sub-documents (new or revised) are to be jointly
balloted by both T1E1 and TR41.
• Ballot comment resolution is to be conducted during a
joint meeting of the appropriate T1E1 and TR41
committee or sub-committee.
• All sub-documents will be published by T1 and TIA.
• Formal submission to the ACTA of a newly published
sub-document to be done by its lead SDO.
• Sub-documents with technical requirements will be
submitted to the ACTA for formal adoption.
• ACTA will need to clarify submission procedures for
completely informative documents (e.g. -000).
TR419-03-02-008
Review of US Telecom Approval Documents
7/23/2016, #13
Document Numbering Scheme
(Requirements)
J-STD-068 Technical Requirements for Connection of
Terminal Equipment to the Telephone Network
•
J-STD-068-000 Index
•
J-STD-068-100 General Information
•
J-STD-068-200 Reserved
•
J-STD-068-300 Connector Requirements
•
J-STD-068-400 Common Requirements
•
J-STD-068-500 Voiceband Analog Interface Requirements
•
J-STD-068-600 DS1, ISDN PRI, DDS, PSDS and LADC Interface
Requirements
•
J-STD-068-700 DSL and ISDN BRI Interface Requirements
TR419-03-02-008
Review of US Telecom Approval Documents
7/23/2016, #14
Document Numbering Scheme
(Test Methods)
J-STD-069 Test Methods for Connection of Terminal
Equipment to the Telephone Network
•
J-STD-069-000 Index
•
J-STD-069-100 General Information
•
J-STD-069-200 Part 68 Test Methods
•
J-STD-069-300 Connector Test Methods
•
J-STD-069-400 Common Test Methods
•
J-STD-069-500 Voiceband Analog Interface Test Methods
•
J-STD-069-600 DS1, ISDN PRI, DDS, PSDS and LADC Interface
Test Methods
•
J-STD-069-700 DSL and ISDN BRI Interface Test Methods
TR419-03-02-008
Review of US Telecom Approval Documents
7/23/2016, #15
Sub-Document Content (Both Documents)
•
J-STD-06x-000 Index
– Lead TR41.9, Others N/A
– Describes the contents of overall document and includes the high level contents
from each sub-document. Generated as each sub-document is completed.
•
J-STD-06x-100 General Information
– Lead TR41.9, Others T1E1.3
– Includes history of Part 68, Scope of document series (each sub-document will
have its own scope), applicable Part 68 criteria, e.g. grandfathering, component
approval, etc.
•
J-STD-06x-200 Part 68 Test Methods
– Lead TR41.9, Others TR41.3.5, T1E1.3 (Liaison)
– Includes only the test methods for those technical requirements still retained in
CFR 47, Part 68. TR41.3.5 will look after the HAC and Volume Control portion
and TR41.9 will look after everything else.
•
J-STD-06x-300 Connector Requirements and Test Methods
– Lead TR41.9, Others T1E1.3
– Contains materials from section 6 of TIA-968 and test methods from Appendix of
TSB-31-B
TR419-03-02-008
Review of US Telecom Approval Documents
7/23/2016, #16
Sub-Document Content (Both Documents)
•
J-STD-06x-400 Common Requirements and Test Methods
– Lead TR41.9, Others T1E1.7, T1E1.3
– Contains the Environmental Simulations, Leakage Current, Hazardous Voltage and
other common stuff.
•
J-STD-06x-500 Voiceband Analog Interface Requirements and Test Methods
– Lead TR41.9, Others T1E1.3
– Voiceband analog interfaces, Loop Start, Ground Start, Reverse Battery, E&M, PBX
OPS, Ring Down, Private Line Automatic Ringdown and Coin operated equip.
•
J-STD-06x-600 DS1, ISDN PRI, DDS, PSDS and LADC Interface
Requirements and Test Methods
– Lead TR41.9, Others T1E1.3
– Existing requirements from sections 4.5 and 4.6 of TIA-968.
•
J-STD-06x-700 DSL and ISDN BRI Interface Requirements and Test Methods
– Lead T1E1.4, Others TR41.9
– Ultimately the existing DSL and ISDN requirements from TIA-968, TRQ.6, possibly
VDSL and more. If TRQ.6 isn’t ready for first publication of J-STD-068, then TR41.9
will be the lead for the first version of this sub-document and it will only contain the
ADSL interfaces currently in TIA-968.
TR419-03-02-008
Review of US Telecom Approval Documents
7/23/2016, #17
Schedule (very tentative)
• TSB-31 revision to be complete Spring 2003, this is
the technical changes not the editorial structure
• TIA-968 next technical revision complete Summer
2003 (not the version currently under ballot)
• First publication of TIA-968 and TSB-31 parts as JSTD-068 to be complete Fall 2003.
• T1.TRQ.6 technical revision not yet planned
• Publication of second revision of DSL portion to
include T1.TRQ.6 not yet planned.
TR419-03-02-008
Review of US Telecom Approval Documents
7/23/2016, #18
Conclusion
• This is the way all the committees listed below,
agreed to go during the Joint T1E1/TR41 meetings
held during the week of 18 to 22 November, 2002.
-TR41
-TR41.9
-TR41.11
TR419-03-02-008
-T1E1
-T1E1.3
-T1E1.4
Review of US Telecom Approval Documents
7/23/2016, #19
Who Contributed to This Plan?
• Working Group Members
–
–
–
–
–
–
Greg Slingerland, Mitel Networks, [email protected]
Phillip Havens, Teccor Electronics, [email protected]
Trone Bishop, Verizon, [email protected]
Cliff Chamney, Sprint, [email protected]
Ed Eckert, Catena Networks, [email protected]
Bill Buckley, Excelsus Technologies, [email protected]
– Massimo Sorbara, Globespan Virata,
[email protected]
– Peter Walsh, Paradyne, [email protected]
– Tim Lawler, Cisco Systems, [email protected]
• Other Interested Parties
– Steve Whitesell, VTech, [email protected], Chair TR41
– Rick Townsend, Lucent, [email protected], Chair T1E1
TR419-03-02-008
Review of US Telecom Approval Documents
7/23/2016, #20