IEEE 802.16gman-10/0025

Download Report

Transcript IEEE 802.16gman-10/0025

Session #68 802.16 GRIDMAN SG Closing Report
IEEE 802.16 Presentation Submission Template (Rev. 9)
Document Number:
IEEE 802.16gman-10/00025
Date Submitted:
2010-07-15
Source:
Tim Godfrey
EPRI
Chair 802.16 GRIDMAN SG
Voice:
E-mail:
Venue:
IEEE 802.16 Session #68
Base Contribution:
N/A
Purpose:
For review
Notice:
This document does not represent the agreed views of the IEEE 802.16 Working Group or any of its subgroups. It represents only the views of the participants listed in
the “Source(s)” field above. It is offered as a basis for discussion. It is not binding on the contributor(s), who reserve(s) the right to add, amend or withdraw material
contained herein.
Release:
The contributor grants a free, irrevocable license to the IEEE to incorporate material contained in this contribution, and any modifications thereof, in the creation of an
IEEE Standards publication; to copyright in the IEEE’s name any IEEE Standards publication even though it may include portions of this contribution; and at the IEEE’s
sole discretion to permit others to reproduce in whole or in part the resulting IEEE Standards publication. The contributor also acknowledges and accepts that this
contribution may be made public by IEEE 802.16.
Patent Policy:
The contributor is familiar with the IEEE-SA Patent Policy and Procedures:
<http://standards.ieee.org/guides/bylaws/sect6-7.html#6> and <http://standards.ieee.org/guides/opman/sect6.html#6.3>.
Further information is located at <http://standards.ieee.org/board/pat/pat-material.html> and <http://standards.ieee.org/board/pat >.
1
Session #68
GRIDMAN SG
Closing Report
July 15, 2010
2
Activities for the week
• Participation: 10-50 attendees with good cross-section of affiliations
• Reviewed SRD outline from Session #67 in document
IEEE C802.16gman-10/0022
• Discussed integration of 802.16n amendment with base
standard
– After some discussion a conclusion was reached to complete SRD to
determine requirements and decide the baseline for their applicability
later.
•
•
•
•
•
Established and agreed on GRIDMAN work plan
Presentation of 6 contributions related to the SRD
Consolidation of text proposals for the SRD
Review, editing, and agreement on SRD baseline document
Approved “Working Draft for 802.16n System Requirements
Document” - 80216gman-10_0024.doc
3
• Develop SRD
–
–
–
–
–
Agreed Work Plan
Accept contributions through July 2010 meeting
Approve D1.0.
Call for comments on Draft 1.0 will be issued at end of July 2010
Process comments, resolve, and refine D1.0 in September 2010
Finalize and approve SRD Document in September 2010.
• Call for contributions for SARM and P802.16n Working Document
– Opening after September 2010 meeting, contributions to be presented at November 2010
– Develop System Architecture Reference Model (as an annex to SRD)
•
–
–
–
–
We believe that the SARM is part of the SRD so it constrains the overall system architecture and is an official
document.
In parallel, will take contributions toward the baseline P802.16n Draft Standard and TOC
Develop first draft of SARM annex (Nov ember 2010)
Call for comments on first draft of SARM Annex (after November 2010)
Editor issues Table of Contents for P802.16n Working Document (November 2010)
•
From this point, contributions to working document are based on TOC
– Process comments on first draft of SARM annex, resolve and complete SARM Annex
– Finalize and Approve SARM annex to SRD (January 2011)
• Drafting of baseline P802.16n Working Document
– Develop P802.16n Working Document
– Contributions are voted into the working document
– Ballot Schedule….
GRIDMAN Session #68
Output Documents
• Opening report: 80216gman-10_0023r1.ppt
• GRIDMAN SRD working draft: 80216gman-10_0024.doc
• Closing report: 80216gman-10_0025.ppt
• Draft Minutes for Session #68: 802.16gman-10_0026.doc
5
Further Activities Required
• Three teleconferences to continue review of SRD draft
–
–
–
First Call Time Slot 2 on July 27.
Second Call Time Slot 1 on Aug 12
Third Call Time Slot 2 on Aug 31
•
•
Time Slot 1: 5pm Eastern US, 2pm Pacific, 6am Korea, Midnight Israel
Time Slot 2: 9am Eastern US, 6am Pacific, 10pm Korea, 4pm Israel
• Call for comments and contributions addressing open issues or
missing sections in SRD draft.
• Process comments, resolve, and refine SRD Draft in Sep 2010
• Finalize and approve SRD Document in Sept 2010
6
Draft TG Timetable
•
•
•
•
•
•
•
•
•
•
Start SRD
Start of TG, complete and approve SRD
CFP issued for System Architecture
System Design Doc
Interim Doc
WG LB issued
Recirc 1
Recirc 2
Sponsor
Approved Std
July 2010
Sept 2010
Sept 2010
Jan 2011
July 2011
Sept 2011
Nov 2011
Jan 2012
Mar 2012
Nov 2012