Transcript 802.11

July 2011
doc.: IEEE 802.11-11/1075r1
802.11 July 2011 Closing Plenary Reports
Date: 2011-07-22
Authors:
Name
Company
Adrian Stephens
Intel
Corporation
Report
Address
Phone
email
+44 792 008
4900 (mobile)
[email protected]
Slide 1
Adrian Stephens, Intel Corporation
July 2011
doc.: IEEE 802.11-11/1075r1
Abstract
• This document is a digest of the closing reports of all
802.11 sub-groups for presentation at the July 2011
closing plenary meeting.
Report
Slide 2
Adrian Stephens, Intel Corporation
July 2011
doc.: IEEE 802.11-11/1075r1
802.11 WG Editor’s Meeting (July ‘11)
Date: 2011-06-01
Authors:
Name
Affiliation
Address
Phone
email
Peter Ecclesine
Cisco Systems
170 W. Tasman Dr.,
MS SJ-14-4, San
Jose, CA 951341706
+1-408-527-0815
[email protected]
Report
Slide 3
Adrian Stephens, Intel Corporation
from slide 1/7 of 11-11/0849r2 by Peter Ecclesine (Cisco Systems)
July 2011
July 2011
doc.: IEEE 802.11-11/1075r1
Volunteer Editor Contacts
•
•
•
•
•
•
•
•
•
•
Report
TGs – Kazuyuki Sakoda – [email protected]
TGmb – Adrian Stephens – [email protected]
TGaa – Alex Ashley – [email protected]
TGac – Robert Stacey – [email protected]
TGad – Carlos Cordeiro – [email protected]
TGae – Henry Ptasinski – [email protected]
TGaf – Peter Ecclesine – [email protected]
TGah – Minyoung Park – [email protected]
TGai – Tom Siep – [email protected]
Editors Emeritus:
– TGk – Joe Kwak– [email protected]
– TGp – Wayne Fisher – [email protected]
– TGr – Bill Marshall – [email protected]
– TGu – Necati Canpolat – [email protected]
– TGv – Emily Qi – [email protected]
– TGw – Nancy Cam-Winget – [email protected]
– TGz – Menzo Wentink – [email protected]
Slide 4
Adrian Stephens, Intel Corporation
from slide 2/7 of 11-11/0849r2 by Peter Ecclesine (Cisco Systems)
July 2011
July 2011
doc.: IEEE 802.11-11/1075r1
ANA Announcements
• Current ANA announced to group is 802.11-11-0270r6. (2011 Jul 12)
– See https://mentor.ieee.org/802.11/dcn/11/11-11-0270-06-0000-ana-database.xls
– All new requests received by end of meeting will be uploaded and announced
via 802.11 WG reflector
• Procedure for ANA is contained in 07/0827r0.
– See http://mentor.ieee.org/802.11/public/07/11-07-0827-00-0000-assigned-number-authority-ana-mechanisms.ppt
• Editorial Guidance
– ANA assignments should be done before the time of moving from WG LB to
Sponsor ballot.
– If a resource number is not in the ANA Database, please use <ANA> in drafts!
– Editors to replace any ANA controlled resources numbers with <ANA> upon
incorporation of material into drafts.
– Editors need to check the ANA database to determine which resources are
controlled and ensure that values are requested from the ANA.
Report
Slide 5
Adrian Stephens, Intel Corporation
from slide 3/7 of 11-11/0849r2 by Peter Ecclesine (Cisco Systems)
July 2011
doc.: IEEE 802.11-11/1075r1
Editor’s discussion of 802.11 MDR
• In May, we discussed holding draft reviews in
preparation for requesting approval from the Sponsor
•
11-11/615r0 WG 11 MEC Process, 11-09/1034r1 802.11 Style Guide, 11-09/533r1
ARC Recommendation re MIB Attribute Types & Usage, and P802.11REVmb
Draft 8.0 Annex C.2 Guidelines for 802.11 MIB authors and editors
• In July, after having performed the review of 11ae,
11aa and 11ad drafts, and refined the review and
reporting process,
– See 11-11/872 TGaa, 11-11/873 TGae and 11-11/874 TGad MEC Reports
• The editors strawpolled of the draft review process
– July 18 PM2 Editor’s meeting reviewed 11-11/615r3 Procedure, and a strawpoll
approved the procedures therein 7-0-0. Some editorial errors were noted and
resolved in 11-11/615r4 WG802.11 MEC Procedures.
– We expect the process to be renamed the WG802.11 Mandatory Draft Review
Process.
Report
Slide 6
Adrian Stephens, Intel Corporation
from slide 4/7 of 11-11/0849r2 by Peter Ecclesine (Cisco Systems)
July 2011
doc.: IEEE 802.11-11/1075r1
802.11 Style Guide
• See 11-09-1034-03-0000-wg11-style-guide.doc
• Editor’s responsibility includes checking the 2009 IEEE
Standards Style Manual when creating or updating
drafts.
• Submissions with draft text should conform to both the
WG11 Style Guide and IEEE Standards Style Manual
Report
Slide 7
Adrian Stephens, Intel Corporation
from slide 5/7 of 11-11/0849r2 by Peter Ecclesine (Cisco Systems)
July 2011
•
•
doc.: IEEE 802.11-11/1075r1
Amendment numbering is
editorial! No need to make
ballot comments on these
dynamic numbers!
Editor Amendment Ordering
Data as of July 2011
See http://grouper.ieee.org/groups/802/11/Reports/802.11_Timelines.htm
Amendment Number
Task Group
REVCOM Date
802.11 Amendment 8
TGv
Feb 2011
802.11 Amendment 9
TGu
Feb 2011
802.11 Amendment 10
TGs
Sept 2011
802.11 Revision
802.11mb
Mar 2012*est.
802.11-2011 Amendment 1
TGae
Jun 2012
802.11-2011 Amendment 2
TGaa
Jun 2012
802.11-2011 Amendment 3
TGad
Dec 2012
802.11-2011 Amendment 4
TGaf
Sep 2012
802.11-2011 Amendment 5
TGac
Dec 2013
802.11-2011 Amendment 6
TGah
July 2013
802.11-2011 Amendment 7
TGai
Sept 2013
Report
Slide 8
Adrian Stephens, Intel Corporation
from slide 6/7 of 11-11/0849r2 by Peter Ecclesine (Cisco Systems)
July 2011
July 2011
July 2011
doc.: IEEE 802.11-11/1075r1
Draft Development Snapshot
Changes from last
report shown in red.
TG
Published or Draft Baseline Documents
Publi
shed
s
mb
ae
aa
s
Y
12.0
mb
Y
ae
Y
12.0
9.0
5.0
aa
Y
11.0
9.0
3.0
5.01
ad
Y
12.0
9.0
4.0
5.0
af
Y
12.0
9.0
4.0
5.0
ac
Y
12.0
9.0
4.0
5.0
ad
af
ac
9.1
4.0
1.02
3.0
1.0
1.0
ah
ai
Most current
doc shaded
green.
Snapshot
Source
MEC
Style
Guide
Editor
Date
Frame 8.0
Yes
2009
Kazuyuki Sakoda
19-Jul
Frame 9.0
Yes
2009
Adrian Stephens
19-Jul
OpenOffic
e 3.2
Yes
2009
Henry Ptasinski
19-Jul
Word
Yes
2009
Alex Ashley
19-Jul
Word
Yes
2009
Carlos Cordero
19-Jul
Frame 9.0
No
2009
Peter Ecclesine
19-Jul
Frame 9.0
No
2009
Robert Stacey
19-Jul
ah
Minyoung Park
ai
Tom Siep
Report
Slide 9
Adrian Stephens, Intel Corporation
from slide 7/7 of 11-11/0849r2 by Peter Ecclesine (Cisco Systems)
July 2011
doc.: IEEE 802.11-11/1075r1
Closing Report
Date: 2011-07-22
Authors:
Name
Company
Clint Chaplin
Samsung Electronics
Report
Address
3000 Orchard Parkway
San Jose, Ca 95134
Phone
email
+1 408 544 2740
firstname dot lastname at
gmail dot com
Slide 10
Adrian Stephens, Intel Corporation
from slide 1/3 of 11-11/1062r0 by Clint Chaplin, Chair (Samsung)
July 2011
doc.: IEEE 802.11-11/1075r1
Abstract
Closing report for WNG SC for July 2011,
San Francisco, CA, USA
Report
Slide 11
Adrian Stephens, Intel Corporation
from slide 2/3 of 11-11/1062r0 by Clint Chaplin, Chair (Samsung)
July 2011
doc.: IEEE 802.11-11/1075r1
• Presentations at July 2011 meeting
– Improving the Case for Wireless LAN Transmit Power Control—
including to better service Mobile Telephones? (11-11-1036-00-0wngimproving-tpc-case.ppt) – Lawrence Zuckerman
– Channel Contention with a Large Number of Devices (11-11-0953-00-0wngchannel-contention-with-a-large-number-of-devices.ppt) – Ed Reuss
– PTC Radio and System Architecture (11-11-1032-00-0wng-positive-traincontrol-radio-and-system-architecture.ppt) – Jia-Ru Li
• Minutes
– 11-11-1043-00-0wng-july-2011-meeting-minutes.doc
• Plans for September 2011
– 1 2 hour session
Report
Slide 12
Adrian Stephens, Intel Corporation
from slide 3/3 of 11-11/1062r0 by Clint Chaplin, Chair (Samsung)
July 2011
doc.: IEEE 802.11-11/1075r1
ARC Closing Report
Date: 2011-07-22
Authors:
Name
Affiliations
Address
Phone
email
Mark Hamilton
Polycom, Inc.
1765 W 121st Ave,
Westminster, CO,
80234
720-872-7445
mark.hamilton@polycom.
com
Report
Slide 13
Adrian Stephens, Intel Corporation
from slide 1/5 of 11-11/1082r1 by Mark Hamilton, Polycom, Inc.
July 2011
doc.: IEEE 802.11-11/1075r1
Abstract
This document is the closing report for ARC SC, July
2011, San Francisco meeting
Report
Slide 14
Adrian Stephens, Intel Corporation
from slide 2/5 of 11-11/1082r1 by Mark Hamilton, Polycom, Inc.
July 2011
doc.: IEEE 802.11-11/1075r1
Work Completed
• 802 Overview and Architecture Draft 1.2 letter ballot
– Provided several comment resolutions, all accepted
• https://mentor.ieee.org/802.11/dcn/11/11-11-1053-00-0arc-802rev-d12-comment-resolutions-v4.ods
– Proposed text for 802.11RM Annex, accepted
• https://mentor.ieee.org/802.11/dcn/10/11-10-1450-00-0arc-802rev802-11-rm-proposal.docx
• Updated to Figure 4-12 in REVmb D9.0 to include 802.11u/802.21
concepts
– Participated in comment resolution sessions
• Raised concern about 802 Overview and Architecture
definition of “end station” and “bridge” versus 802.11
concepts
– Will be discussed on teleconference(s); probably submit comment
on next ballot of 802 O&A
• Minutes are in 11-11/1054
Report
Slide 15
Adrian Stephens, Intel Corporation
from slide 3/5 of 11-11/1082r1 by Mark Hamilton, Polycom, Inc.
July 2011
doc.: IEEE 802.11-11/1075r1
Notable issues raised at 802 O&A sessions
• Handling/mapping of EtherType in 802.11
• Error rate requirements for 802 networks
• Service availability upon device insertion/removal requirements
for 802 networks
• See https://mentor.ieee.org/802.11/dcn/11/11-11-1054-02-0arc-arcsc-agenda-report-and-minutes.ppt for details
Report
Slide 16
Adrian Stephens, Intel Corporation
from slide 4/5 of 11-11/1082r1 by Mark Hamilton, Polycom, Inc.
July 2011
doc.: IEEE 802.11-11/1075r1
September 2011 Goals
• Respond to (expected) 802 Overview and Architecture
recirculation letter ballot
• Formulate specific proposal for changes to “end station” and
“bridge” concepts in 802 O&A
Report
Slide 17
Adrian Stephens, Intel Corporation
from slide 5/5 of 11-11/1082r1 by Mark Hamilton, Polycom, Inc.
July 2011
doc.: IEEE 802.11-11/1075r1
July 2011 Closing Report -TGmb
Date: 2011-07-21
Authors:
Name
Dorothy Stanley
Report
Affiliations
Address
Phone
Aruba Networks 1322 Crossman Ave +1 630-363Sunnyvale, CA
1389
94089
email
dstanley@arubanetworks.
com
Slide 18
Adrian Stephens, Intel Corporation
from slide 1/6 of 11-11/1092r0 by Dorothy Stanley (Aruba Networks)
July 2011
doc.: IEEE 802.11-11/1075r1
Abstract
This document contains the TGmb closing report for July
2011.
Report
Slide 19
Adrian Stephens, Intel Corporation
from slide 2/6 of 11-11/1092r0 by Dorothy Stanley (Aruba Networks)
July 2011
doc.: IEEE 802.11-11/1075r1
Accomplishments
• Completed Third Recirculation SB Comment Resolution
(D9.0)
– 208 comments (+17 post SB)
– Fourth Recirculation SB (20 day) to start later in August,
incorporating 11s amendment
• Scheduled teleconference calls on
– September 13, 30
– 10am Eastern (7am Pacific), 2 hours
Report
Slide 20
Adrian Stephens, Intel Corporation
from slide 3/6 of 11-11/1092r0 by Dorothy Stanley (Aruba Networks)
July 2011
doc.: IEEE 802.11-11/1075r1
Current TGmb Plan of Record
 May 2008 – Issue Call for Comment/Input
 July 2008 – begin process input and old Interpretation requests
Acknowledge previous Task Group referrals









•
•
•
Report
Sept 2008 – PAR revision process started
Nov 2008 – close receipt of new input
Nov 2008 – WG/EC approval of PAR Revision
Dec 2008 – NesCom/SASB approval PAR Revision
May 2009 – First WG Letter ballot
Nov 2009 – Recirc start
July 2010 – Conditional Sponsor Ballot Approval from EC
August 2010 – Form Sponsor Pool (45 days) – Closes Sept 14
November 2010 – Initial Sponsor Ballot completion
Jan 2011 – Sponsor Recirc. Start
Nov 2011 – WG/EC Final Approval
March 2012 – RevCom/SASB Approval
Slide 21
Adrian Stephens, Intel Corporation
from slide 4/6 of 11-11/1092r0 by Dorothy Stanley (Aruba Networks)
July 2011
doc.: IEEE 802.11-11/1075r1
Goals for September 2011
• Recirculation Sponsor Ballot comment resolution
(D10.0)
Report
Slide 22
Adrian Stephens, Intel Corporation
from slide 5/6 of 11-11/1092r0 by Dorothy Stanley (Aruba Networks)
July 2011
doc.: IEEE 802.11-11/1075r1
References
Report
Slide 23
Adrian Stephens, Intel Corporation
from slide 6/6 of 11-11/1092r0 by Dorothy Stanley (Aruba Networks)
July 2011
doc.: IEEE 802.11-11/1075r1
TGs SF Closing Report
Date: 2011-07-22
Author:
Name
Address
Affiliation
Phone
Email
Dee Denteneer
HTC 37; 5656 AE
Eindhoven; The
Netherlands
Philips
+31 40
2749743
Dee.Denteneer@phil
ips.com
Report
Slide 24
Adrian Stephens, Intel Corporation
from slide 1/6 of 11-11/1083r1 by Dee Denteneer (Philips)
July 2011
doc.: IEEE 802.11-11/1075r1
Abstract
TGs closing report for the July 2011 meeting.
Report
Slide 25
Adrian Stephens, Intel Corporation
from slide 2/6 of 11-11/1083r1 by Dee Denteneer (Philips)
July 2011
doc.: IEEE 802.11-11/1075r1
Status
• Discussed a number of suggestions made by the
Publication Editor
• Prepared the report 11-11-0990r3 to the EC to
request approval to forward D12.0 to RevCom
• Prepared a press release 11-11-984r7
Report
Slide 26
Adrian Stephens, Intel Corporation
from slide 3/6 of 11-11/1083r1 by Dee Denteneer (Philips)
July 2011
doc.: IEEE 802.11-11/1075r1
Plan
• To disband the group once approval to forward D12.0
to RevCom has been obtained
Report
Slide 27
Adrian Stephens, Intel Corporation
from slide 4/6 of 11-11/1083r1 by Dee Denteneer (Philips)
July 2011
doc.: IEEE 802.11-11/1075r1
Motion
• Moved to approve document 11-11-0990r3 as the
report to the IEEE 802 Executive Committee on the
requirements for approval to forward P802.11s to
RevCom, and
• Request the IEEE 802 Executive Committee to forward
P802.11s to RevCom.
• Moved by Dee Denteneer on behalf of TGs
•
TGs vote:
– Moved: Stephen McCann Seconded: Dan Harkins
– Honorary Seconder: Donald E. Eastlake
– Result: 8-0-0
Report
Slide 28
Adrian Stephens, Intel Corporation
from slide 5/6 of 11-11/1083r1 by Dee Denteneer (Philips)
July 2011
doc.: IEEE 802.11-11/1075r1
Motion
•
Moved to approve document 11-11-0984r7 “TGs Press
Release” and forward it to the IEEE-SA Marketing
Director in preparation for ExCom ballot.
To authorise the IEEE 802.11 WG chair to make any
necessary editorial changes.
•
• Moved by Dee Denteneer on behalf of TGs
•
TGs vote:
– Moved: Dan Harkins Seconded: Peter Yee
– Result: 4-0-0
Report
Slide 29
Adrian Stephens, Intel Corporation
from slide 6/6 of 11-11/1083r1 by Dee Denteneer (Philips)
July 2011
doc.: IEEE 802.11-11/1075r1
802.11aa – Robust Audio Video Transport Streaming
San Francisco Closing Report
Date: 2011-07-21
Authors:
Name
Affiliation
Address
th
Phone
email
Ganesh.Venkatesan@intel
.com
[email protected]
Ganesh Venkatesan
Intel Corporation
JF3-336 2111NE 25 Ave
+1 503 334 6720
Alex Ashley
NDS Ltd
One London Road, Staines,
Middlesex, TW18 4EX,
England
+44 1784 848770
Report
Slide 30
Adrian Stephens, Intel Corporation
from slide 1/7 of 11-11/1071r0 by Ganesh Venkatesan, Intel Corporation et al
July 2011
doc.: IEEE 802.11-11/1075r1
Technical Presentations
Document number
Title
1
11/920
LB179 GCR Comment Resolutions
Alex Ashley
2
11/923
LB179 OBSS Comment Resolutions
Alex Ashley
3
11/903
LB179/MEC Editorial Comment
Resolutions
Alex Ashley
4
11/939
Resolution to CID #4112
Ganesh Venkatesan
5
11/941
LB179 SCS Comment Resolutions
Ganesh Venkatesan
6
11/1005
Sponsor Ballot Request
Ganesh Venkatesan
Report
Author(s)
Slide 31
Adrian Stephens, Intel Corporation
from slide 2/7 of 11-11/1071r0 by Ganesh Venkatesan, Intel Corporation et al
July 2011
doc.: IEEE 802.11-11/1075r1
LB179 Comment Resolution Status
Blank
Accept
Principle
Editor
31
GCR
3
General
12
2, 13
30
1
OBSS
4
SCS
39
63
1
1
Interworking
Total
Total
16
Declined,
Withdrawn
16
1
19
6
3
5
26
54
39
132
11
100% Resolved
Report
Slide 32
Adrian Stephens, Intel Corporation
from slide 3/7 of 11-11/1071r0 by Ganesh Venkatesan, Intel Corporation et al
July 2011
doc.: IEEE 802.11-11/1075r1
Joint Meeting with 802.1AVB
• Discussed TGaa timeline going forward
• In the March meeting we committed to bring in details on the following
but the details are not ready yet:
–
–
–
–
what are the .11k/v capabilities are at the devices?
On what 802.11 parameters, can triggers be set?
what 802.11 action frames are used to set triggers?
what reports are generated?
• No updates on MaxRes and STA-Bridge issues.
• Provided a comment on 802.1BA
• All 6 .1AVB suite of specifications are done. The team is working on
AVB Rev 2
– Redundant flows to listeners,
– SRP over prioritized QoS
– .1AS updates to auto-detect support for .1AS over mediums like Moca.
Report
Slide 33
Adrian Stephens, Intel Corporation
from slide 4/7 of 11-11/1071r0 by Ganesh Venkatesan, Intel Corporation et al
July 2011
doc.: IEEE 802.11-11/1075r1
Change of TGaa Chair
• Graham Smith (DSP Group) was unanimously
elected as the chair of TGaa
Report
Slide 34
Adrian Stephens, Intel Corporation
from slide 5/7 of 11-11/1071r0 by Ganesh Venkatesan, Intel Corporation et al
July 2011
doc.: IEEE 802.11-11/1075r1
Teleconferences
Aug 15, Sep 01, Oct 24, 27, 31, Nov 03 2011
1130-1330 Hrs ET
Report
Slide 35
Adrian Stephens, Intel Corporation
from slide 6/7 of 11-11/1071r0 by Ganesh Venkatesan, Intel Corporation et al
July 2011
doc.: IEEE 802.11-11/1075r1
Plans
•
After the July 2011 meeting
–
–
•
At the Sep 2011 Meeting
–
Report
Complete Draft 6.0 recirculation, clean recirculation
and satisfy all conditions in order to start Sponsor
Ballot
Start Sponsor Ballot
Since the First Sponsor Ballot will be completed on
Oct 17, 2011, provide WG with a status update
Slide 36
Adrian Stephens, Intel Corporation
from slide 7/7 of 11-11/1071r0 by Ganesh Venkatesan, Intel Corporation et al
July 2011
doc.: IEEE 802.11-11/1075r1
TGac July 2011 Closing Report
Date: 2011-07-21
Authors:
Name
Affiliations
Address
Phone
email
Osama Aboul-Magd
Huawei Technologies
303 Terry Fox Drive,
Kanata, ONT, K2K-3J1
613-287-1405
Osama.aboulmagd@huaw
ei.com
Report
Slide 37
Adrian Stephens, Intel Corporation
from slide 1/7 of 11-11/1086r0 by Osama Aboul-Magd (Huawei Technologies)
July 2011
doc.: IEEE 802.11-11/1075r1
Abstract
This document is the closing report for the TGac for the
July 2011 session.
Report
Slide 38
Adrian Stephens, Intel Corporation
from slide 2/7 of 11-11/1086r0 by Osama Aboul-Magd (Huawei Technologies)
July 2011
doc.: IEEE 802.11-11/1075r1
Work Completed
• Comment resolution on D1.0
– MU: 1057r0, MU comments for motioning (20110719PM2)
• MU-2011-07-19-PM2
– PHY: 1069r2, PHY Comments for Motion
•
•
•
•
•
PHY_07_19_11
PHY_07_21_1009
PHY_07_21_1042
PHY_07_21_11
PHY_07_21_954
– COEX: 11/1067-01-00ac-lb178-coex-comments-tgac-d1-0
• COEX Ready for Motion 1
– MAC: 11/1021r3 lb178-comments-tgac-mac-d1-0
•
•
•
•
•
Report
MAC_07_18_AM1
MAC_07_19_AM2
MAC_07_20_PM1
MAC_07_21_AM2
MAC_07_21_PM1
Slide 39
Adrian Stephens, Intel Corporation
from slide 3/7 of 11-11/1086r0 by Osama Aboul-Magd (Huawei Technologies)
July 2011
doc.: IEEE 802.11-11/1075r1
Work Completed (cntd)
• Number of technical comments resolved per Ad Hoc
Report
Ad Hoc
Number of Comments
MAC
81
PHY
84
MU
44
COEX
21
Total
230 + 10 Editorial
Slide 40
Adrian Stephens, Intel Corporation
from slide 4/7 of 11-11/1086r0 by Osama Aboul-Magd (Huawei Technologies)
July 2011
doc.: IEEE 802.11-11/1075r1
Work Completed (cntd)
• Approved an ad hoc meeting on September 14-16, at
Seoul, Korea to advance comment resolution work.
• Initiated discussion on GCMP related issues. The
discussion is to be continued during the September
IEEE 802.11 meeting
Report
Slide 41
Adrian Stephens, Intel Corporation
from slide 5/7 of 11-11/1086r0 by Osama Aboul-Magd (Huawei Technologies)
July 2011
doc.: IEEE 802.11-11/1075r1
September 2011 Goals
• Continue with comment resolution on
D1.0.
Report
Slide 42
Adrian Stephens, Intel Corporation
from slide 6/7 of 11-11/1086r0 by Osama Aboul-Magd (Huawei Technologies)
July 2011
doc.: IEEE 802.11-11/1075r1
Conference Call Times
• Previously Approved
– Thursday July 28 20:00 -22:00
– Thursday August 4 10:00 -12:00
• Aug 11,Aug 25, Sept 8, Sept 29, Oct 13
– 20:00 – 22:00 ET
• Aug 18, Sept 1, Oct 6,
– 10:00-12:00 ET
Report
Slide 43
Adrian Stephens, Intel Corporation
from slide 7/7 of 11-11/1086r0 by Osama Aboul-Magd (Huawei Technologies)
July 2011
doc.: IEEE 802.11-11/1075r1
TGad July 2011 Closing Report
Date: 2011-07-21
Authors:
Name
Eldad Perahia
Report
Company
Address
Phone
email
Intel
Corporation
2111 NE 25th Ave
Hillsboro, OR 97124
503-712-8081
[email protected]
Slide 44
Adrian Stephens, Intel Corporation
from slide 1/5 of 11-11/0980r0 by Eldad Perahia, Intel Corporation
July 2011
doc.: IEEE 802.11-11/1075r1
Abstract
This document is the closing report for TGad for the July
2011 session.
Report
Slide 45
Adrian Stephens, Intel Corporation
from slide 2/5 of 11-11/0980r0 by Eldad Perahia, Intel Corporation
July 2011
doc.: IEEE 802.11-11/1075r1
Work Completed
• Resolved all comments on LB 177 this week
• TG and WG approved motion for recirculation letter
ballot on D4.0
• CWPAN liaison report (11/1034)
– Overview of proposed modification to TGad to support CWPAN
requirements
– Plan to use Aug 18 conference call to continue discussion on
CWPAN proposal
Report
Slide 46
Adrian Stephens, Intel Corporation
from slide 3/5 of 11-11/0980r0 by Eldad Perahia, Intel Corporation
July 2011
doc.: IEEE 802.11-11/1075r1
Goals for September 2011
• Comment resolution on D4.0
• More planning for Sponsor Ballot
Report
Slide 47
Adrian Stephens, Intel Corporation
from slide 4/5 of 11-11/0980r0 by Eldad Perahia, Intel Corporation
July 2011
doc.: IEEE 802.11-11/1075r1
Conference call times
• Previously approved
conference calls
– July 28, Aug 11
• 10:00 – 12:00 ET
– Aug 4
• 20:00-22:00 ET
• New conference calls
– Not overlap with TGac
– Aug 25, Sept 8, Sept 29, Oct
13
• 10:00 – 12:00 ET
– Aug 18, Sept 1, Sept 15, Oct 6,
• 20:00-22:00 ET
Report
Slide 48
Adrian Stephens, Intel Corporation
from slide 5/5 of 11-11/0980r0 by Eldad Perahia, Intel Corporation
July 2011
doc.: IEEE 802.11-11/1075r1
TGae Closing Report – July 2011
Date: 2011-07-20
Authors:
Name
Affiliations
Address
Phone
email
Michael Montemurro
Research in Motion
4701 Tahoe Blvd.
Mississauga, ON. Canada.
L4W 0B4
+1-905-629-4746
[email protected]
Report
Slide 49
Adrian Stephens, Intel Corporation
from slide 1/5 of 11-11/1059r0 by Michael Montemurro, Research In Motion
July 2011
doc.: IEEE 802.11-11/1075r1
Abstract
This document is the closing report for the TGae Task
Group for the July 2011 session.
Report
Slide 50
Adrian Stephens, Intel Corporation
from slide 2/5 of 11-11/1059r0 by Michael Montemurro, Research In Motion
July 2011
doc.: IEEE 802.11-11/1075r1
Work Completed
• Completed Comment Resolution for LB 180
– https://mentor.ieee.org/802.11/dcn/11/11-11-0888-08-00ae-lb-180-commentresolutions.xls
• Approved recirculation LB on Draft 5.0
• Approved package for Conditional Sponsor Ballot
– https://mentor.ieee.org/802.11/dcn/11/11-11-0962-02-00ae-conditional-sb-requestto-ec.ppt
• Teleconferences:
– Weekly teleconference on Wednesday Aug 10 at 11am ET for 1
hour.
Report
Slide 51
Adrian Stephens, Intel Corporation
from slide 3/5 of 11-11/1059r0 by Michael Montemurro, Research In Motion
July 2011
doc.: IEEE 802.11-11/1075r1
TGae Timeline – July 2011
• Initial Working Group Letter Ballot: September ‘10
• Re-circulation Working Group Letter Ballot: January
‘11
• Form Sponsor Ballot Pool: May ’11
• Mandatory Editorial Check: May ’11
• Initial Sponsor Ballot: Aug ’11
• Sponsor Ballot Recirculation: Nov ‘11
• Final WG/EC Approval: Mar ‘12
• RevCom/Standards Board Approval: June ‘12
Report
Slide 52
Adrian Stephens, Intel Corporation
from slide 4/5 of 11-11/1059r0 by Michael Montemurro, Research In Motion
July 2011
doc.: IEEE 802.11-11/1075r1
September 2011 Goals
• Resolve comments from initial Sponsor ballot
• Prepare for recirculation Sponsor ballot
Report
Slide 53
Adrian Stephens, Intel Corporation
from slide 5/5 of 11-11/1059r0 by Michael Montemurro, Research In Motion
July 2011
doc.: IEEE 802.11-11/1075r1
TGaf San Francisco Closing Report
Date: 2011-07-22
Authors:
Name
Affiliations
Address
Rich Kennedy
Research In
Motion
Cisco
7305 Napier Trail
+1-972-207-3554
Austin, TX 78729
170 W. Tasman Dr., +1-408-527-0815
San Jose, CA,
95134
Peter Ecclesine
Report
Phone
email
[email protected]
[email protected]
Slide 54
Adrian Stephens, Intel Corporation
from slide 1/9 of 11-11/1068r0 by Rich Kennedy, Research In Motion
July 2011
doc.: IEEE 802.11-11/1075r1
Abstract
This presentation is the closing report for the eleventh
face-to-face meeting of IEEE 802.11 TGaf taking place
the week of July 18, 2011 at the IEEE 802 Plenary in
San Francisco.
Report
Slide 55
Adrian Stephens, Intel Corporation
from slide 2/9 of 11-11/1068r0 by Rich Kennedy, Research In Motion
July 2011
doc.: IEEE 802.11-11/1075r1
Agenda
• Approve meeting and teleconference minutes
• Approve the LB171 comment spreadsheet in 1111/277r14
• Approve draft P802.11af D1.02 as the working draft
• Approve agreed to comment resolution submissions
• Review of the progress since May
• Comment resolution
• PHY planning
Report
Slide 56
Adrian Stephens, Intel Corporation
from slide 3/9 of 11-11/1068r0 by Rich Kennedy, Research In Motion
July 2011
doc.: IEEE 802.11-11/1075r1
TGaf Accomplishments
• Resolved 151 comments
– 626 of 1302 comments have Approved resolutions
• Met with TGac PHY experts to discuss how
TGaf can proceed prior to approval of the
TGac draft
• Revised the P802.11af timeline
• Planned for September ad hoc in Korea, and
weekly teleconferences
– Tuesdays at 21:00 ET
Report
Slide 57
Adrian Stephens, Intel Corporation
from slide 4/9 of 11-11/1068r0 by Rich Kennedy, Research In Motion
July 2011
doc.: IEEE 802.11-11/1075r1
Plans for September
• Ad hoc September 14 - 16 in the Korea
– Sponsored by LG Electronics [Thank you!]
• Complete comment resolution
• Prepare draft 2.0 and ask the WG to begin our
second Letter Ballot
Report
Slide 58
Adrian Stephens, Intel Corporation
from slide 5/9 of 11-11/1068r0 by Rich Kennedy, Research In Motion
July 2011
doc.: IEEE 802.11-11/1075r1
TGaf ad hoc Motion
• Authorize TGaf to hold an ad-hoc meeting on
September 14-16, 2011 in Seoul, ROK with the
preferred venue being LG Electronics for the purpose
of advancing the TGaf draft prior to the September
IEEE 802 Wireless Interim in Okinawa, Japan.
• Moved: Peter Ecclesine, Cisco
• Second
• Result: x/x/x
Report
Slide 59
Adrian Stephens, Intel Corporation
from slide 6/9 of 11-11/1068r0 by Rich Kennedy, Research In Motion
July 2011
doc.: IEEE 802.11-11/1075r1
TGaf Timeline – Updated March 2011
•
•
•
•
•
•
•
•
•
Report
New
Initial Working Group Letter Ballot: January 2011
Second Working Group Letter Ballot: September 2011
Recirculation Letter Ballot: November 2011
Form Sponsor Ballot Pool: February 2012
Initial Sponsor Ballot: March 2012
Recirculate Sponsor Ballot: May 2012
Final WG/EC Approval: July 2012
RevCom/Standards Board Approval: September 2012
Slide 60
Adrian Stephens, Intel Corporation
from slide 7/9 of 11-11/1068r0 by Rich Kennedy, Research In Motion
July 2011
doc.: IEEE 802.11-11/1075r1
TGaf Timeline – Updated July 2011
•
•
•
•
•
•
•
•
•
Report
New
Initial Working Group Letter Ballot: January 2011
Second Working Group Letter Ballot: January 2012
Recirculation Letter Ballot: May 2012
Form Sponsor Ballot Pool: June 2012
Initial Sponsor Ballot: September 2012
Recirculate Sponsor Ballot: November 2012
Final WG/EC Approval: March 2013
RevCom/Standards Board Approval: March 2013
Slide 61
Adrian Stephens, Intel Corporation
from slide 8/9 of 11-11/1068r0 by Rich Kennedy, Research In Motion
July 2011
doc.: IEEE 802.11-11/1075r1
Teleconferences
• Weekly on Tuesdays:
• Time: 21:00 ET for 120 minutes
Report
Slide 62
Adrian Stephens, Intel Corporation
from slide 9/9 of 11-11/1068r0 by Rich Kennedy, Research In Motion
July 2011
doc.: IEEE 802.11-11/1075r1
IEEE 802.11ah Closing Report for
July 2011
Date: 2011-7-21
Authors:
Name
David Halasz
Report
Affiliations
Aclara
Address
th
2315 W. 9 Street
Austin, TX 78703
Phone
email
330-283-2715
dave.halasz@oaktreewirel
ess.com
Slide 63
Adrian Stephens, Intel Corporation
from slide 1/5 of 11-11/1088r0 by David Halasz, OakTree Wireless
July 2011
doc.: IEEE 802.11-11/1075r1
Activity in TGah
• Initial channel model document adopted!
– 11-11-0968-01-00ah-channel-model-text.docx
• Initial functional requirements and evaluation
methodology adopted!
– 11-11-0905-03-00ah-tgah-functional-requirements-and-evaluationmethodology.doc
• Addition of leadership role
– Joseph Teo Chee Ming - Secretary
Report
Slide 64
Adrian Stephens, Intel Corporation
from slide 2/5 of 11-11/1088r0 by David Halasz, OakTree Wireless
July 2011
doc.: IEEE 802.11-11/1075r1
Going forward
• Get started on Specification framework
• Updates to Channel Model And FR-EM as needed
Report
Slide 65
Adrian Stephens, Intel Corporation
from slide 3/5 of 11-11/1088r0 by David Halasz, OakTree Wireless
July 2011
doc.: IEEE 802.11-11/1075r1
Teleconferences
•
•
•
Report
August 8th 6:30 PM ET 1.5 hours
August 22nd 6:30 PM ET 1.5 hours
September 11th 6:30 PM ET 1.5 hours
Slide 66
Adrian Stephens, Intel Corporation
from slide 4/5 of 11-11/1088r0 by David Halasz, OakTree Wireless
July 2011
doc.: IEEE 802.11-11/1075r1
Timeline
• Move out end time by 4 months
– See 11/285 for details
Report
Slide 67
Adrian Stephens, Intel Corporation
from slide 5/5 of 11-11/1088r0 by David Halasz, OakTree Wireless
July 2011
doc.: IEEE 802.11-11/1075r1
IEEE 802.11TGai
Closing Report
Date: 2011-07-22
Authors:
Name
Company Address
Phone
email
Hiroshi MANO
ROOT Inc.
8F TOC2 Bldg. 7-21-11 NishiGotanda, Shinagawa-ku, Tokyo
141-0031 JAPAN
+81-3-5719-7630
[email protected]
Marc Emmelmann
Fraunhofer
FOKUS
Fraunhofer FOKUS
Kaiserin-Augusta-Alle 31
10589 Berlin
Germany
+49-30-3463
7268
[email protected]
Report
Slide 68
Adrian Stephens, Intel Corporation
from slide 1/8 of 11-11/1090r0 by Hiroshi Mano (Root Inc.)
July 2011
doc.: IEEE 802.11-11/1075r1
Abstract
This presentation is the closing report for the San Francisco
meeting of the IEEE 802.11 TGai.
Report
Slide 69
Adrian Stephens, Intel Corporation
from slide 2/8 of 11-11/1090r0 by Hiroshi Mano (Root Inc.)
July 2011
doc.: IEEE 802.11-11/1075r1
Plan for this week
San Francisco , July 2011
• Official time slot
–
–
–
–
Monday AM1,PM1
Tuesday AM2, PM1
Wednesday PM1, PM2
Thursday PM1,PM2
• Goals for the Meeting:
– Review and Approve the Palm Springs and Teleconference meeting
minutes
– Presentation of submissions
• Approve Verification of TGai Requirements
• Submission of Initial technical contribution
– TIME line of task group
– Plan for September & Teleconference
Report
Slide 70
Adrian Stephens, Intel Corporation
from slide 3/8 of 11-11/1090r0 by Hiroshi Mano (Root Inc.)
July 2011
doc.: IEEE 802.11-11/1075r1
Accomplishments TGai
•
•
Reviewed and Approved the Singapore and Teleconference meeting minutes
Approved TGai evaluation methodology document
•
•
11/0811r05 TGai evaluation methodology
Technical contribution
–
–
–
–
–
–
–
–
–
–
–
–
•
•
11/0976r1 TGai Authentication Protocol Proposal / Hitoshi Morioka (Root,Inc.)
11/0977r1 TGai Upper Layer Setup Proposal / Hitoshi Morioka (Root,Inc.)
11/1015r0 Network Selection Optimization / Gabor Bajko (Nokia)
11/1012r0 IP address configuration during association / Gabor Bajko (Nokia)
11/1014r0 IP address configuration during association / Gabor Bajko (Nokia)
11/1000r1 TGai FILS proposal / Jihyun Lee (LG)
11/1003r2 TGai Upper layer data for management frames / Hiroki Nakano (TNT)
11/1047r0 Using Upper Layer Message IE in Tgai / Ping Fang (Huawei)
11/1040r0 Editors Report / Tom Siep (CSR)
11/0976r3 TGai Authentication Protocol Proposal / Hitoshi Morioka (Root,Inc.)
11/1015r1 Optimize network selection / Marc Emmelmann (Fokus)
11/1066r1 Fast Security Setup /Robert Moskowitz (Verizon )
Approved Weekly Teleconference schedule
Approved Plan for July
• Submission of technical contribution
• General submission
Report
Slide 71
Adrian Stephens, Intel Corporation
from slide 4/8 of 11-11/1090r0 by Hiroshi Mano (Root Inc.)
July 2011
July 2011
doc.: IEEE 802.11-11/1075r1
Motion to approve TGai evaluation
methodology document
• Move to accept all changes to 11-11-0811-06 and
upload the revised document as rev 07 to the server ,
accept 11-11-0811-07 as TGai evaluation methodology
document.
• Mover : Marc Emmelmann (Fokus)
• Second : Tom Siep (CSR)
• Result 15 - 0 - 0
Report
Slide 72
Adrian Stephens, Intel Corporation
from slide 5/8 of 11-11/1090r0 by Hiroshi Mano (Root Inc.)
July 2011
doc.: IEEE 802.11-11/1075r1
Time line of TGai
PAR Approved, Modified, or Extended [Expires]
2010-12-08
– WG Letter Ballots Initial / Recirc
Mar 12 / Jul 12
– Form Sponsor Ballot Pool / Reform
Jan 13
– MEC Done
Jan13
– IEEE-SA Sponsor Ballots Initial / Recirc
Mar13/ Jul13
– Final 802.11 WG Approval
Jan 14
– final or Conditional 802 EC Approval
Jan 14
– RevCom & Standards Board Final or
Continuous Process Approval
Mar14
– ANSI Approved
N/A
Report
Slide 73
Adrian Stephens, Intel Corporation
from slide 6/8 of 11-11/1090r0 by Hiroshi Mano (Root Inc.)
July 2011
doc.: IEEE 802.11-11/1075r1
Documents
• Approved Minutes
– May 2011 Palm Springs session minutes, 11/11-0832-00-00aimay-2011-palm-springs-session-minutes.doc
– May-July Teleconference minutes, 11/11-0837-07-00ai-may-julyteleconference-minutes.doc
• Approved TGai evaluation methodology
–
Report
11/11-0811r05 TGai evaluation methodology
Slide 74
Adrian Stephens, Intel Corporation
from slide 7/8 of 11-11/1090r0 by Hiroshi Mano (Root Inc.)
July 2011
doc.: IEEE 802.11-11/1075r1
Thanks to all who participated!
Report
Slide 75
Adrian Stephens, Intel Corporation
from slide 8/8 of 11-11/1090r0 by Hiroshi Mano (Root Inc.)
July 2011
doc.: IEEE 802.11-11/1075r1
JTC1 ad hoc closing report (July 11)
Date: 2011-7-22
Authors:
Name
Andrew Myles
Report
Company
Address
Phone
Cisco
email
[email protected]
Slide 76
Adrian Stephens, Intel Corporation
from slide 1/10 of 11-11/1091r0 by Andrew Myles, Cisco
July 2011
doc.: IEEE 802.11-11/1075r1
Abstract
Closing report for JTC1 ad hoc
for July 2011, San Francisco
Report
Slide 77
Adrian Stephens, Intel Corporation
from slide 2/10 of 11-11/1091r0 by Andrew Myles, Cisco
July 2011
doc.: IEEE 802.11-11/1075r1
JTC1 ad hoc focused on reporting of recent
SC6 meeting
• Progress in San Francisco (July 2011)
– Welcomed guest
• Chair of SC6 was present
– Approved minutes from July in Palm Springs
• 11/0955
– Reviewed extended goals
• Deals with 802 to SC6 issues
– Reviewed SC6 meeting in San Diego
• Review attendance
– IEEE 802 delegation (8 people) & ten NBs
• Review agenda
– Many topics not related to 802 activities
Report
Slide 78
Adrian Stephens, Intel Corporation
from slide 3/10 of 11-11/1091r0 by Andrew Myles, Cisco
July 2011
doc.: IEEE 802.11-11/1075r1
JTC1 ad hoc focused on reporting of recent
SC6 meeting
• Progress in San Francisco (July 2011)
• Discussed proposed 8802 series withdrawal
– Consensus of .1, .3, .11 participants that “international” is important &
802 should send standards to ISO as long as ISO does not amend our
standards
– 802.11 will not send 802.11-2007 as interim update because 802.11-2012
is very close to completion
• Received WAPI report
– WAPI still at NP stage & not at WD stage
– A CRM will be held with 802 delegation in August, with the output to be
considered by SC6 NBs in Feb 2012
– Not clear on process for WAPI project approval
Report
Slide 79
Adrian Stephens, Intel Corporation
from slide 4/10 of 11-11/1091r0 by Andrew Myles, Cisco
July 2011
doc.: IEEE 802.11-11/1075r1
JTC1 ad hoc focused on reporting of recent
SC6 meeting
• Progress in San Francisco (July 2011)
• Received 802.1X/AE replacement report
– Will ask what additional function provided by TePA?
– Will need to review TePA in longer term
– Not clear if proposal will proceed in SC6
• Received 802.16 security replacement report
– Not clear if proposal will proceed in SC6
• Received 802.11 replacement report (Thursday)
–
–
–
–
Report
Explained 802.11ac and critiqued N-UHT
Late news: N-UHT proposal will proceed in SC6
Late news: N-UHT is linked to 5GHz spectrum
Decided need to liaise 802.11ac to SC6 ASAP
Slide 80
Adrian Stephens, Intel Corporation
from slide 5/10 of 11-11/1091r0 by Andrew Myles, Cisco
Adrian Stephens, Intel Corporation
July 2011
doc.: IEEE 802.11-11/1075r1
IEEE 802 members are encouraged to
participate in their SC6 NBs
• SC6 P-Members
– Korea - KATS
– Spain – AENOR
– France – AFNOR
– USA – ANSI
– UK – BSI
– Germany – DIN
– Greece – ELOT
– Russia - GOST R
– Luxemburg – ILNAS
– Tunisia – INNORPI
Report
– Japan - JISC
– Kazakhstan – KAZMEMST
– Kenya – KEBS
– Belgium - NBN
– Netherlands – NEN
– China – SAC
– Canada – SCC
– Finland – SFS
– Switzerland – SNV
– Czech Republic - UNMZ
Slide 81
from slide 6/10 of 11-11/1091r0 by Andrew Myles, Cisco
July 2011
doc.: IEEE 802.11-11/1075r1
JTC1 ad hoc will review results of WAPI
comment resolution in Okinawa
• Plans for Okinawa (Sept 2011)
–
–
–
–
Report
Bruce Kraemer will be acting Chair
Review results of WAPI comments resolution meetings
Review possible liaison to SC6 regarding 8802 series
...
Slide 82
Adrian Stephens, Intel Corporation
from slide 7/10 of 11-11/1091r0 by Andrew Myles, Cisco
July 2011
doc.: IEEE 802.11-11/1075r1
Motion to empower HoD for WAPI
teleconferences
• Motion
– The IEEE 802.11 WG Chair is authorised to appoint a delegation
to the ISO/IEC JTC1/SC6/WG1 teleconference series to resolve
comments on the WAPI NP proposal, and to approve any materials
used by the delegation and positions proposed by the delegation
• Note: equivalent motion in ad hoc passed 21/0/0
• Moved:
• Seconded:
Report
Slide 83
Adrian Stephens, Intel Corporation
from slide 8/10 of 11-11/1091r0 by Andrew Myles, Cisco
July 2011
doc.: IEEE 802.11-11/1075r1
Motion to liaise 802.11ac to SC6
• Motion
– The IEEE 802.11 WG approves the following text be liaised to SC6
by the 802.11 WG Chair
• The IEEE 802.11 WG has previously committed to liaise Sponsor
Ballot draft standards to ISO/IEC JTC1/SC6 to allow SC6 National
Bodies an early opportunity to review standards that may be submitted
to SC6 for ratification under the PSDO agreement.
• However, the IEEE 802.11 WG understands that a Letter Ballot draft
of IEEE 802.11ac may be of interest to the National Body members of
ISO/IEC JTC1/SC6, particularly as they consider the proposal from
the China National Body for a New Project to develop a standard for
an alternate PHY and MAC addressing similar market requirements,
similar techniques and the same targeted spectrum.
Report
Slide 84
Adrian Stephens, Intel Corporation
from slide 9/10 of 11-11/1091r0 by Andrew Myles, Cisco
July 2011
doc.: IEEE 802.11-11/1075r1
Motion to empower 802.11ac to SC6
• It is the intent of the IEEE 802.11 WG to liaise a version of the draft
of IEEE 802.11ac as soon as the draft passes 802.11 Working Group
Letter Ballot. The 802.11ac Task Group is projected to finalize a
letter-ballot by year end 2011.
• Note: equivalent motion not considered in ad hoc
• Moved: Rolf deVegt
• Seconded: Andrew Myles
Report
Slide 85
Adrian Stephens, Intel Corporation
from slide 10/10 of 11-11/1091r0 by Andrew Myles, Cisco
July 2011
doc.: IEEE 802.11-11/1075r1
RR-TAG (IEEE 802.18) Liaison Report
Date: 2011-07-22
Authors:
Name
Rich Kennedy
Report
Affiliations
Address
Phone
email
Research In
Motion
7305 Napier Trail
Austin, TX 78729
+1-972-207-3554
[email protected]
Slide 86
Adrian Stephens, Intel Corporation
from slide 1/9 of 11-11/1065r0 by Rich Kennedy, Research In Motion
July 2011
doc.: IEEE 802.11-11/1075r1
Abstract
This presentation is the liaison statement from the Radio
Regulatory Technical Advisory Group (802.18) to the
IEEE 802.11 Working Group for the July, 2011
plenary meeting in San Francisco.
Report
Slide 87
Adrian Stephens, Intel Corporation
from slide 2/9 of 11-11/1065r0 by Rich Kennedy, Research In Motion
July 2011
doc.: IEEE 802.11-11/1075r1
RR-TAG Activities
• Introduced ITU-R documents of interest to
IEEE 802 wireless groups
• 802.11 liaison presentation on bills before the
US House of Representatives on opening the 5
GHz band and on auctioning spectrum for
licensed and unlicensed use
• Reviewed two 802.16 documents for ITU-R
Report
Slide 88
Adrian Stephens, Intel Corporation
from slide 3/9 of 11-11/1065r0 by Rich Kennedy, Research In Motion
July 2011
doc.: IEEE 802.11-11/1075r1
ITU-R Documents
• WORKING DOCUMENT TOWARDS A PRELIMINARY
DRAFT NEW REPORT ITU-R SM.[SMART_GRID], WP 1A,
18-11/49r1
– Informational document on smart grid power management systems
• DRAFT NEW QUESTION ITU-R [PWRGRD]/1, WP 1A, 18-
11/51r0
– Impact on radiocommunication systems from wireless and wired
data transmission technologies used for the support of power grid
management system
Report
Slide 89
Adrian Stephens, Intel Corporation
from slide 4/9 of 11-11/1065r0 by Rich Kennedy, Research In Motion
July 2011
doc.: IEEE 802.11-11/1075r1
ITU-R Documents [2]
• PRELIMINARY DRAFT NEW RESOLUTION ITU-R[CRS],
WP 1B, 18-11/52r0
– Studies on the implementation and use of cognitive radio systems
(CRS)
• CORRESPONDENCE GROUP ON NARROW-BAND
WIRELESS HOME NETWORKING, WP 1B, 18-11/53r0
– Establishment of a correspondence group on narrow-band wireless home
networking, including terms of reference
• MULTIPLE GIGABIT WIRELESS SYSTEMS IN
FREQUENCIES AROUND 60 GHz, WP 5A, 18-11/54r0
– Liaison statement to external organizations on “Multi-gigabit Wireless
Systems Operating in Frequencies Around 60 GHz”
Report
Slide 90
Adrian Stephens, Intel Corporation
from slide 5/9 of 11-11/1065r0 by Rich Kennedy, Research In Motion
July 2011
doc.: IEEE 802.11-11/1075r1
ITU-R Documents [3]
• PRELIMINARY DRAFT NEW REPORT ITU-R M.[LMS.WASN
STUDY], WP 5A, 18-11/55r0
– System design guidelines for wide area sensor and/or actuator network
(WASN) systems
• QUALITY OF SERVICE REQUIREMENTS AND OBJECTIVES
FOR WIRELESS ACCESS SYSTEMS, WP 5A, 18-11/56r0
– Liaison statement to ITU-R Working party 5D, ITU-T Study groups 12,
15 and 16, and External organizations on “Quality of Service
Requirements and Objectives for Wireless Access Systems”
• PRELIMINARY DRAFT NEW RECOMMENDATION ITU-R
M.[LMS.WASN], WP 5A, 18-11/57r0
– Objectives, characteristics and functional requirements of wide-area
sensor and/or actuator network (WASN) systems
Report
Slide 91
Adrian Stephens, Intel Corporation
from slide 6/9 of 11-11/1065r0 by Rich Kennedy, Research In Motion
July 2011
doc.: IEEE 802.11-11/1075r1
References
• https://mentor.ieee.org/802.18/dcn/11/18-11-0060-00-0000spectrum-for-innovation-act.pdf
• https://mentor.ieee.org/802.18/dcn/11/18-11-0061-00-0000spectrum-innovation-act.pdf
• https://mentor.ieee.org/802.18/dcn/11/18-11-0062-00-0000unlicensed-spectrum-memo.pdf
• https://mentor.ieee.org/802.18/dcn/11/18-11-0058-00-0000summary-of-itu-r-documents.pptx
• https://mentor.ieee.org/802.18/dcn/11/18-11-0049-01-0000working-document-towards-a-preliminary-draft-new-report-itu-rsm-smart-grid.docx
Report
Slide 92
Adrian Stephens, Intel Corporation
from slide 7/9 of 11-11/1065r0 by Rich Kennedy, Research In Motion
July 2011
doc.: IEEE 802.11-11/1075r1
References [2]
• https://mentor.ieee.org/802.18/dcn/11/18-11-0050-00-0000-furthercollaboration-in-the-development-of-a-preliminary-draft-newreport.docx
• https://mentor.ieee.org/802.18/dcn/11/18-11-0051-00-IMTA-draftnew-question-itu-r-pwrgrd-1.pdf
• https://mentor.ieee.org/802.18/dcn/11/18-11-0052-00-0000preliminary-draft-new-resolution-itu-r-crs.docx
• https://mentor.ieee.org/802.18/dcn/11/18-11-0053-00-0000correspondence-group-on-narrow-band-wireless-homenetworking.docx
Report
Slide 93
Adrian Stephens, Intel Corporation
from slide 8/9 of 11-11/1065r0 by Rich Kennedy, Research In Motion
July 2011
doc.: IEEE 802.11-11/1075r1
References [3]
• https://mentor.ieee.org/802.18/dcn/11/18-11-0054-00-0000multiple-gigabit-wireless-systems-in-frequencies-around-60ghz.docx
• https://mentor.ieee.org/802.18/dcn/11/18-11-0055-00-0000preliminary-draft-new-report-itu-r-m-lms-wasn-study.docx
• https://mentor.ieee.org/802.18/dcn/11/18-11-0056-00-0000-qualityof-service-requirements-and-objectives-for-wireless-accesssystems.docx
• https://mentor.ieee.org/802.18/dcn/11/18-11-0057-00-0000preliminary-draft-new-recommendation-itu-r-m-lms-wasn.docx
Report
Slide 94
Adrian Stephens, Intel Corporation
from slide 9/9 of 11-11/1065r0 by Rich Kennedy, Research In Motion
July 2011
doc.: IEEE 802.11-11/1075r1
Smart Grid ad hoc – July 2011
Name
Company
Address
Phone
email
Bruce Kraemer
Marvell
5488 Marvell Lane,
Santa Clara, CA, 95054
+1-321-751-3988
[email protected]
Date: 21 July 2011
Discussions during July Plenary meeting in San Francisco
Tuesday Abstract:
Thursday Abstract:
1 – SGIP
2 - NIST PAP2
3- ITU Liaison
1- FERC
2 - NIST PAP2
3- ITU Liaisons :WG18 docs 49,51,57
Report
Slide 95
Bruce Kraemer, Marvell
July 2011
doc.: IEEE 802.11-11/1075r1
MEETING TOPICS
Meeting document 11-11-975
1 – SGIP activities
2 - NIST PAP2 project status and plans to complete
3- ITU Liaison regarding Smart Grid
WG 18 documents: 49, 51, 57
4- FERC Order dropping consideration of first 5 SGIP
standards
FERC concluded that there is insufficient consensus to adopt
the proposed standards at this time, pointing to “nearly
unanimous” comments from the industry regarding cyber
security concerns and the potential unintended consequences
from adopting such standards too soon
Report
Slide 96
Bruce Kraemer, Marvell
doc.: IEEE 802.11-11/1075r1
PAP02- Phase 2-SDO Proposal –r1
Intro
• Thanks to Ron Cunningham for his diligent preparation of requirements for completion of Phase 2.
• We propose that it is time for the wireless SDO’s to take a more active role in constructing the
analytic
Proposal/Request
• We request authorization from PAP2 members to form an “SDO subcommittee” committed to
completing delivery of an operational analysis framework , and related descriptive text, in time for
presentation to the Dec 05, 2011 SGIP board meeting.
Goals
• Example of deliverables include: Definition of propagation model, ability to calculate quantity of
wireless equipment required to cover a given demographic/topographic area and description of
statistical confidence in reported numbers
Utility/GRID Input Requirements
• Information regarding actor quantities by type, relative locations, topography, data traffic loads
Synchronization
• “SDO subcommittee” will report progress to during currently scheduled biweekly PAP2 calls
Logistics
• “SDO subcommittee” will convene a series of teleconferences scheduled to optimize SDO
participation but open to all PAP2. SDO subcommittee will self organize , assign/delegate work.
develop a milestone based project schedule. Webinar facilities will be available.
Membership
• “SDO subcommittee” is a volunteer group initially underwritten by ATIS, IEEE, TIA, and WiMAX.
Additional wireless SDO participants will be recruited
Report