Transcript STI-2 Status (NCIA/CAP analysis)
1
Core ACCS LOC1 A challenging program in all respects
Engineering Over 3900 Core System Requirements – – Core System Hardware ~1400 Core System Software ~ 2500 About 12600 Software Requirements Test Core System Requirements tested – 3700 Verified – 200 ~ remaining Over 11300 Software Requirements verified – Real Time ~ 7600 – Non Real Time ~ 3700 SW Sizing estimates : 13000 KSLOCs (13+ million lines of software) – Real Time 75% – Non Real Time 25% System Design broken down in 10 HWCI and 9 CSCI About 150 Software COTS All HWCI and CSCI implemented – HW Upgrade, Solaris 10 – Secured and redundant environment – 12 strings in factory 15 Databases for MTIF and sites System version installed weekly on 12 strings 10000 regression steps in 2010 for 6 system versions (factory + sites) Integration continuous in factory and 6 sites NATO UNCLASSIFIED
ACCS Validation Sites
ARS Glons & STVF CARS Lyon Mt. Verdun DACC Poggio Renatico
NATO UNCLASSIFIED
CAOC Uedem DCAOC Uedem CARS Poggio Renatico
Main events towards fielding
1st version Dec 2008 FST Sep 2009 STI-1 Sep 2011 FST BU1 Mar 2013 STI-2 Jun/Dec 2013 STII STIII Apr 2014 June 2014 PSWA 2 nd version (BU1) • • 1st version was successfully tested in Factory (Factory System Test) in 2008 and in live environment [System Test I-1 (STI-1) at System Test and Validation Facility (STVF) located in the NPC] in 2009.
Major change integrated in the contract in 2007: Block Upgrade 1 (BU1) (mainly in CAOC functionalities changes) – ACCS BU1 was successfully tested in factory in September 2011 and in live environment System Test I-2 at STVF completed in March 2013 (with test under simulated peak load conditions) – Following test performed & completed in 2 Validation Nations (BE, GE) and on-going in the two remaining ones (FR & IT) – Final tests performed in multi-site configuration: System Test III Up to Provisional Software Acceptance forecasted mid 2014 3 NATO UNCLASSIFIED
• •
Main events towards fielding Operational Evolution
Sep 2009 STI-1 FB Mar 2013 STI-2 BU1 Jun 14 PSWA BU1
In Service Support
Jul 2013 FCSE Oct 2011 Spiral1 Award Spiral 2
1. Operational requirements evolve:
– Operational needs regularly expressed by SHAPE (roadmap towards ACCS IOC) like JTS interface, JCHAT capability – Initial Operational Tests & Evaluations (IOT&E) after each live environment System Tests on site bring potential new requests 1 st IOT&E STI-1 in 2009 revealed shortfalls => improvements in Air Mission Control, workflow & HMI grouped in a Spiral 1 enhancement.
Spiral 1 awarded in October 2011 successfully tested in factory in Jul 2013 will be merged with BU1 for final test STIII up-front PSWA • • Work under preparation to introduce JTS interface and JCHAT capability towards ACCS IOC Potentially Shortfalls from future IOT&Es (STI-2, STII & STIII) might also lead to additional Spirals 4 NATO UNCLASSIFIED
5
Main events towards fielding Technical Evolution
Sep 2009 STI-1 FB Mar 2013 STI-2 BU1 Jun 14 PSWA BU1
In Service Support
Jul 2013 FCSE Oct 2011 Spiral1 Award Technical evolutions • • •
2. Meanwhile technology is also evolving
Communication means: from point to point connectivity to networked connectivity (significant communications expenses savings) => NATO General Segment System (NGCS) NATO secure communication network contracted mid 2012.
Communication standard protocol: commercial world evolving towards so-called Everything over the Internet => contracted mid 2012. Radar Network connection (RADNET) contracted by mid 2012.
Those technical evolutions will be integrated within the appropriate timeline (before PSWA or during In Service Support through replication contract activities). NATO UNCLASSIFIED
ACCS LOC1 Test Process Test &Evaluation DT&E IOT&E
•
Developmental Test & Evaluation (DT&E)
• DT&E verifies that the system performs as required in its intended environment • DT&E is conducted by ACSI and its Subcontractors / Partners 6 NATO UNCLASSIFIED •
Initial Operational Test & Evaluation (IOT&E)
• IOT&E evaluates that the system is operationally effective and suitable • IOT&E is conducted by AirC2PO&S with Contractor support
Sequence of Test events
MTIF
FST
STVF
STI
Validation Sites 7
ST II / III DARS-1 DryRun Formal Test FST
FST Be
DR DR
FST Ge
FT
FST Ita
FT
FST Fra
DR STI-1 DR FT ARS Glons - Be CAOC Uedem - Ge DCAOC Uedem - Ge CARS LMV - Fr CARS PR - It FT STII-1
DR FT FST BU1 IOT&E DR FT Dry-Run Dry-Run Dry-Run Dry-Run Dry-Run FT FT FT FT FT DR FT DR FT STII-2
DARS-QRP DR
NATO UNCLASSIFIED
FT STII-2 IOT&E
IOT&E
FAT Spiral 1 IOT&E DR STII IOT&E
DR IOT&E IOT&E IOT&E DR DR DR IOT&E DR PSA FT STIII IOT&E PSA FT FT FT FT FT STIII IOT&E PSA IOT&E IOT&E IOT&E IOT&E