Home work #1: (Lecture 4/03) From Buttazzo: From Shaw:

Download Report

Transcript Home work #1: (Lecture 4/03) From Buttazzo: From Shaw:

Home work #1:
From Buttazzo:
From Shaw:
Exercises 2.2: 1, 2, 3, 5, 6
(Lecture 4/03)
Lecture 4/17
Real-Time System
Requirements & Design Specs
Shaw - Chapters 3 & 4
Homework #2:
3.3.1,
3.4.1,
Add Error states to Fig 4.1
Homework #3 (due 5/3/07) :
1)
2)
3)
Lecture 4/24
Homework #4
Lecture 5/1
1) Verify the schedulability under RM of the following task set:
Ci
Ti
t1
1
4
t2
2
6
t3
3
8
2) Verify the schedulability under EDF, and then construct the corresponding schedule.
Due May 8
Homework #5
Lecture 5/15
1) Schedule the following tasks with a Polling Server with intermediate priority.
2) Solve the same scheduling problem with a Sporadic Server with
intermediate priority.
3) Solve the same scheduling problem with a Deferrable Server and highest
priority.
4) Solve the same scheduling problem utilizing Slack Stealing.
Homework #6
Lecture 5/22
1) Schedule the following tasks with a Dynamic Sporadic Server with Cs = 2 and Ts = 6.
2) Solve the same scheduling problem with a Total Bandwidth Server having utilization
Us = 1/3.
3) Solve the same scheduling problem with a Constant Bandwidth Server with Cs = 2
and Ts = 6.