Experience with FC-Vehicles & Hydrogen Infrastructure in ZERO REGIO www.zeroregio.com
Download ReportTranscript Experience with FC-Vehicles & Hydrogen Infrastructure in ZERO REGIO www.zeroregio.com
Project Co-financed by the European Commission FCHJU-SGA09 Experience with FC-Vehicles & Hydrogen Infrastructure in ZERO REGIO Heinrich Lienkamp, Ashok Rastogi Infraserv Höchst - Frankfurt Germany www.zeroregio.com 26-27.10.2009, Brussels Rastogi / Lienkamp 1 Project Co-financed by the European Commission FCHJU-SGA09 Outline • Brief presentation of Aims, activities & highlights in Zero Regio (2004-2010) – Frankfurt, Germany – Mantova, Italy • Operational experience – Some events – Lessons learnt • Collection and Assessment of Data – Comparison with the state of the art • Concluding Remarks; Next steps 26-27.10.2009, Brussels Rastogi / Lienkamp 2 Project Co-financed by the European Commission FCHJU-SGA09 Zero Regio Objectives • Development and demonstration of H2 infrastructure and FCV‘s in European Cities • Different hydrogen sources – By-product, industrial, Onsite production • 700 bar refuelling technology • Integration of hydrogen in public service stations • Socio-economic impact Project implementation: 11. 2004 –11. 2006 Construction 11.2006 -11. 2009 Demonstration; End May 2010 26-27.10.2009, Brussels Rastogi / Lienkamp 3 FCHJU-SGA09 Industrial Park Höchst Project Co-financed by the European Commission 4.6 km2 area 72 km Streets 80 Companies Over 22000 Workforce & 30 mil.Nm3/yr By-product H 26-27.10.2009, Brussels Rastogi / Lienkamp 2 4 Project Co-financed by the European Commission FCHJU-SGA09 H2 - Infrastructure in Germany • Hydrogen center in Industry park, Höchst – Existing infrastructure – By-product H2 is collected, conditioned, compressed (250 bar) – Trailer station • • • • • • Ionic fluid compressor (900 bar) in Hydrogen center Agip station 1.7 km from H2-center Hydrogen transport to station via HP-pipeline (1000 bar) CGH2 dispensers, 350 bar and 700 bar one each LH2 dispenser (Truck supply of LH2) Agip station opened on Nov. 17, 2006 26-27.10.2009, Brussels Rastogi / Lienkamp 5 Project Co-financed by the European Commission FCHJU-SGA09 Lay out HP Pipeline in Höchst H2-High-Pressurepipeline PN 1000 bar H2-Centre over ground under ground Fillingstation 26-27.10.2009, Brussels Rastogi / Lienkamp 6 FCHJU-SGA09 26-27.10.2009, Brussels Hydrogen-Dispensers – Höchst Project Co-financed by the European Commission GH2 700 bar LH2 GH2 350 bar Rastogi / Lienkamp 7 Project Co-financed by the European Commission FCHJU-SGA09 Experience with infrastructure in Germany • High availability inspite of some problems: – – – – Filters in the cooling system of the compressor Some valves failed on the compressor system Some loose fittings leading to system failure Ionic Compressor overhauled in 2nd year of operation • Outage for 3 months – – – – Filter problems in the third year, regular maintenance reqd. Insufficient purging of the pipeline initially Control valves at dispenser & minor electronic problems Incident reporting and management approach important • One accident in the first year, no H2 discharge 26-27.10.2009, Brussels Rastogi / Lienkamp 8 Project Co-financed by the European Commission FCHJU-SGA09 Operational Experience in Germany 26-27.10.2009, Brussels Rastogi / Lienkamp 9 FCHJU-SGA09 Operational Experience in Germany Project Co-financed by the European Commission • Damage of 700 bar Dispenser by accident – Cause: Passenger car runs into dispenser – Effect: major damage of dispenser and the installed technique No accidental escape of hydrogen – Action: Repair / replacement of dispenser 26-27.10.2009, Brussels Rastogi / Lienkamp 10 FCHJU-SGA09 26-27.10.2009, Brussels Servicestation Mantova Rastogi / Lienkamp Project Co-financed by the European Commission 11 Project Co-financed by the European Commission FCHJU-SGA09 H2 - Infrastructure in Mantova, Italy • On-site production facility (CPO – reformer) – Small unit with 20 Nm3/hr – Construction completed and in operation from July 2008 • • • • • Truck transport from an industrial reformer (back-up) 350 bar GH2 dispenser (Cars homologated for 200 bar) Delay partly due to approval formalities A mobile refueller initially (AP 100) Integration in multi-energy Agip service station – 17.000 m2, Car Wash, Cafè Shop – Opening ceremony took place on 21 Sept. 2007 26-27.10.2009, Brussels Rastogi / Lienkamp 12 FCHJU-SGA09 26-27.10.2009, Brussels CPO Reformer by Eni Rastogi / Lienkamp Project Co-financed by the European Commission 13 Project Co-financed by the European Commission FCHJU-SGA09 On-site Hydrogen Production in Mantova • Suitable for intermittent operation • 3 Compaigns in 2009 – 20 kg. H2 in April 09 – 40 kg. H2 in July 09 (40 kg. Storage capacity) – 40 kg. H2 in Oct. 09 • • • • • One day for plant start-up and shut down High quality achieved (CO< 0.1 ppm) Plant optimised for automatic operation 20 Nm3/hr. too high for 3 cars Other applications planned at the service station 26-27.10.2009, Brussels Rastogi / Lienkamp 14 Project Co-financed by the European Commission FCHJU-SGA09 Dedicated Fleets Range: 250 km (@350 bar) Maximum speed: 135 km/h Acceleration: 0-50 km/h within 7 s Nuvera PEM 70 kW Range: 160 km (@350 bar) Maximum speed: 140 km/h Ballard PEM 72 kW 5 cars, one with 700 bar storage 26-27.10.2009, Brussels 3 cars Rastogi / Lienkamp 15 FCHJU-SGA09 Beauty and the Beast Project Co-financed by the European Commission F-Cell serving A-380 !! 26-27.10.2009, Brussels Rastogi / Lienkamp 16 Project Co-financed by the European Commission Some Demonstration Data FCHJU-SGA09 Operational Performance of the vehicles in 2008 8000 [km] 250 5906 6000 [h] 195 200 5084 Mileage 150 Operating hours 100 4000 2481 2125 2491 2000 102 87 75 85 50 0 0 FC No. 29 FC No. 49 FC No. 59 FC No. 60 FC No. 61 F-Cell No. 29 FC No. 29 FC No. 49 FC No. 59 FC No. 60 FC No. 61 F-Cell No. 49 (700 bar) F-Cell No. 59, 60, 61 The operational performance 2008 was lower than expected 26-27.10.2009, Brussels Rastogi / Lienkamp 17 FCHJU-SGA09 SOME INCIDENTS with Fleet Project Co-financed by the European Commission • In general all FCV‘s functioned better than expected • Regular maintenance was performed – Tank leak tests – TÜV examinations – Minor repairs could be done on site • No road calls • One accident due to drivers negligence • One car was taken out of service in Sept. 2009 due to IPT defect (Integrated PowerTrain failure) 26-27.10.2009, Brussels Rastogi / Lienkamp 18 FCHJU-SGA09 H2 Dispenser Deployment Project Co-financed by the European Commission • Frankfurt station is used also by other customers • For 350 bar dispenser – Honda (FCX Clarity), 2 cars – Mazda (Ice, RX 8 Hydrogen), 1 car – Toyota Prius one visit • For 700 bar dispenser – – – – Opel/GM Hydrogen 4, 1 car B-class F-Cell Daimler, extensive testing with a few cars IR Communication, SAE Release A Standard 3 min. for 4 kg, aiming at 100% fill rate 26-27.10.2009, Brussels Rastogi / Lienkamp 19 Project Co-financed by the European Commission FCHJU-SGA09 Some Lessons Learnt • Serious problems with approval formalities in Italy • Delay in infrastructure construction • Fleet is still operated at 200 bar storage • European Harmonisation, Integrate authorities in project • Bottle neck for larger demonstrations • Fleet availability (cost), not so much infrastructure • Frankfurt station can fill 15-20 FCV‘s /hour • By-product Hydrogen should be exploited much more 26-27.10.2009, Brussels Rastogi / Lienkamp 20 FCHJU-SGA09 Summary of 2 years • 3-7 Project Co-financed by the European Commission FCV‘s, 100 vehicle months of operation, over 45000 km driven (should have been more) • Over 510 kg. H2 consumed, 7.2 tons of CO2 emission saved • Vehicles showed high reliability and availablity (98%) • Availability 350 bar dispenser 95% • Availability 700 bar dispenser 55% (accident costed 11 months) • Ionic compressor 77% (has been overhauled) • By-product hydrogen should be exploited more initially • Infrastructure problems experienced are not related to H2 26-27.10.2009, Brussels Rastogi / Lienkamp 21 FCHJU-SGA09 Concluding Remarks Project Co-financed by the European Commission • H2-infrastructure developed and FCV fleet used in Zero Regio Project have been briefly presented • Operational experience has been encouraging at both sites • FCV-Fleets have operated better than expected • Fuel consumption of FCV is about half of NGV • Fast refuelling of 700 bar FCV‘s has been realised • Zero Regio high potentials: HP-Pipeline transport, Ionic liquid compression,700 bar refuelling with IR communication. Thank You • Final Conference at WHEC 2010, Essen, Germany. 26-27.10.2009, Brussels Rastogi / Lienkamp 22