Document 7703070

Download Report

Transcript Document 7703070

Notification of frequency Assignment for recording in the Master Register
Centre of Excellence Workshop
Kiev - 2003
Principles and techniques for
spectrum planning and utilization
Notification of frequency
Assignment for recording in the
Master Register
Bontcho Balabanov
NBU-Sofia
ComBalSat
CoE SM Workshop Kiev- 2003
Notification
Notification of frequency Assignment for recording in the Master Register
Notification
•
•
•
•
Any frequency assignment to a transmitting station and to
its associated receiving stations except for those
mentioned in Nos. 11.13 and 11.14 shall be notified to the
ITUWhy
Radio
Bureau.
to notify?
Which assignments should be notified?
How to notify an assignment?
When to notify ?
Where to notify ?
International registration provides:
international recognition of services and frequency plans;
It is usual to notify international frequency use after successful
negotiations between countries;
There are some circumstances detailed in the ITU Radio
Regulations when an administration is obliged to notify its use
of the spectrum.
ComBalSat
CoE SM Workshop Kiev- 2003
Notification of frequency Assignment for recording in the Master Register
Considering Other Users
• The procedures for allocating frequencies must
also consider the impact of other countries’
assignments as published in:
– ITU Frequency Plans;
– the ITU International Frequencies List (IFL); and
– Information circulars published by the
Radiocommunication Bureau (IFIC).
ComBalSat
CoE SM Workshop Kiev- 2003
Notification of frequency Assignment for recording in the Master Register
Above 30 MHz - Bilateral Agreement

Pro Active Process
 Co-ordination

Sharing arrangements by band
 Some
bands first-come, first-served
 Others

versus notification
block and zone
Electronic exchange of proposals
ComBalSat
CoE SM Workshop Kiev- 2003
Notification of frequency Assignment for recording in the Master Register
Bilateral Co-ordination - Management Objectives



Better agreements
 Faster access to spectrum
Strategies
 Reduce case-by-case coordination
 Prefer block and zone
arrangements
Automation
 Eliminate unnecessary coordination messages
 Better access to data bases
 Increase user participation
ComBalSat
Bilateral Initiatives
 Standardize messages
 A form of electronic
data interchange
 Common data
formats
 Improve control of
messages
 Tracking data bases
 Computer edits
 Use of WEB facilities
 Improve data
transfer procedures
CoE SM Workshop Kiev- 2003
Notification of frequency Assignment for recording in the Master Register
INTERNATIONAL NOTIFICATION
SM Offices On-Line Data Entry
Assignment Licensing
System
Frequency Notification
System
Radiocommunication
Bureau
Geneva
ComBalSat
CoE SM Workshop Kiev- 2003
Notification of frequency Assignment for recording in the Master Register
Master International Frequency Register
•After 1951:
Master International Frequency
Register (MIFR)
Frequency Assignments
•The procedures for registration in the
Master International Frequency Register
as defined in the Articles of the ITU Radio
Regulations may be subdivided into:
–coordination;
–notification;
–examination;
–registration.
ComBalSat
CoE SM Workshop Kiev- 2003
Why to notify?
Notification of frequency Assignment for recording in the Master Register
Why to notify?
• Because the Member States of ITU are bound to apply
the provisions of the Radio Regulations
RR
•To apply the provisions of the RR
•To avoid interference
•To obtain international recognition
ComBalSat
CoE SM Workshop Kiev- 2003
Rights and
obligations
Which assignments?
Notification of frequency Assignment for recording in the Master Register
Which assignments should be notified?
An assignment shall be notified to BR if:
1.It could cause harmful interference
2.It is used for international communication
3. It is subject to a world or regional plan
4. It is subject to a coordination procedure (RR Art. 9)
5. International recognition is desired
6. For information only
• RR Article 11
• Sec. I: Notification
• Sec. II: Examination
• Appendix 4 - Rules of Procedure
ComBalSat
CoE SM Workshop Kiev- 2003
Sheared frequencies
Notification of frequency Assignment for recording in the Master Register
Sheared frequencies
If the frequency is used for other purposes
it must be notified.
• Today
– New RR
– New data processing system (TerRaSys)
Article 9 provides in its Section II the procedure for
effecting coordination. Coordination of terrestrial
services in the shared bands shall be effected with other
administrations for the cases described in the following
provisions:No. 9.16, 9.18, 19.21,
ComBalSat
CoE SM Workshop Kiev- 2003
Which shall not?
Notification of frequency Assignment for recording in the Master Register
Frequency assignments which shall not be notified
•Radioamateur
•Ship
Ship
•Mobile stations in the aeronautical mobile service,
exclusive bands (Ap.26 & Ap.27)
•Common Frequencies 11.13 & 11.14
Frequencies reserved in the RR for common use by all
the stations of a given service, for example the distress
frequency 500 kHz, the radiotelegraphy station frequencies of
ships working in their exclusive HF bands, etc.
ComBalSat
CoE SM Workshop Kiev- 2003
Notification of frequency Assignment for recording in the Master Register
Terrestrial Services
•Regulatory and Technical Functions
–Broadcasting
–Fixed
–Aeronautical & Maritime Mobile
–Other services e.g. Meteorology, Amateur, Research,
Astronomy, ISM, etc.
•Up to 50,000 notices/year
•TerRaSys
Terrestrial Plans
AP25, AP26, AP27, ST61, GE75, RJ81, GE84, GE85M,
GE85N, RJ88, GE89
4500 cases/year
HF Broadcasting (Art. 12)
ComBalSat
CoE SM Workshop Kiev- 2003
Notification of frequency Assignment for recording in the Master Register
a)Space Services
•Regulatory and Technical Procedures
–Advance publication
–Request for coordination
–Notification
–Space Plans
•Major objective
–Process these notices within the time limits
specified in the Radio Regulations ???
–Delay in Publications??
ComBalSat
CoE SM Workshop Kiev- 2003
Notification of frequency Assignment for recording in the Master Register
b)Space Services
•Current situation
–Some 20 coordination requests / month
–Backlog situation (more than 1000 networks i.e.
approx. 2.5 years) now being corrected
–Measures adopted by WRC-2000 and
WRC-2003
–Discussion topic for ITU Reform
–After WRC-03 ??
–Satellite network coordination examination
ComBalSat
CoE SM Workshop Kiev- 2003
Notification of frequency Assignment for recording in the Master Register
Ways of notification

Standard Paper Notice Forms:

Electronic media:
Electronic mail
Diskettes

@
ComBalSat
CoE SM Workshop Kiev- 2003
a)How to notify
Notification of frequency Assignment for recording in the Master Register
a)How to notify an assignment?
By sending one notice form per assignment
1
1
•Paper forms or Computer files
Except for typical stations (11.17)
n
25 S26 S27 BC BT
ComBalSat
1
[email protected]
CoE SM Workshop Kiev- 2003
b)How to notify
Notification of frequency Assignment for recording in the Master Register
Mobile Services
Tx
Rx
Mobile Services
11.9 ,11.12
Notification of receiving stations
ComBalSat
CoE SM Workshop Kiev- 2003
Rx
When to notify?
Notification of frequency Assignment for recording in the Master Register
2. b) When to notify?
Normally,
the terrestrial notice must reach the
Bureau no earlier than three months before
the scheduled date of bringing into service of
the station.
When a notice form is received before the
specified deadline, it is returned to the
administration concerned with the suggestion that it
be resubmitted at the appropriate time.
ComBalSat
CoE SM Workshop Kiev- 2003
Documents
Notification of frequency Assignment for recording in the Master Register
Documents for notification
•Radio Regulations
–Article 11, 12, Appendix 4
–Provisions specific to services
•Preface to the International Frequency List
•BR Circular Letters
–CR/120 for FMTV (VHF FM and VHF/UHF TV)
–CR/118 for FXM (fixed, mobile and other )
–CR 125 (LF/MF BC)
–FXM Submission guidelines
ComBalSat
CoE SM Workshop Kiev- 2003
Preparation
Notification of frequency Assignment for recording in the Master Register
Preparation of notices
Frequency bands covered by a plan
•To check plan requirements (for Art.S11 notices to
compare with corresponding plan entry)
•To verify notified parameters
•To check the completeness of the notice
Frequency bands not covered by a plan
•To check the notice vis-à-vis the Table of Frequency
Allocations
•To check RR requirements to a given service
•To check the completeness of the notice
ComBalSat
CoE SM Workshop Kiev- 2003
Notification of frequency Assignment for recording in the Master Register
Notification Procedure
Forms
ADM
BR
1- Validation
2- Publication BR IFIC - part 1
3- Examination
4 –Publication BR IFIC – part 2/3
5- MIFR
Importance of Notifying Correctly
• Date of receipt of complete
information (11.28)
ComBalSat
CoE SM Workshop Kiev- 2003
Notification of frequency Assignment for recording in the Master Register
RR 11.41 Procedure
• Resubmission procedure for recording in the
Master Register of assignments with
unfavourable findings with respect to technical
examination
Confirm
to
BR
the
bringing
into
use
Provision 11.47
of assignments notified in advance.
30 days Provisional -> Definitive
Provisions 4.4 & 8.4
ComBalSat
Recording in the Master
Register of assignments
with unfavourable findings
CoE SM Workshop Kiev- 2003
Notification of frequency Assignment for recording in the Master Register
Information Circular (BR IFIC)
The WIC and the IFL on
CD-ROM
have been replaced by
the BR IFIC on CDROM
Publication in Part 2/3 of BR IFIC
Part II: Assignments recorded in the Master Register
Part III: Assignments sent back to the administration
http://www.itu.int/brtpr/brific/
ComBalSat
CoE SM Workshop Kiev- 2003
Notification of frequency Assignment for recording in the Master Register
Information Circular (BR IFIC)
FMS
TerRaSys
BC / BT
Operational
(VHF / UHF)
All
Terrestrial
Services
FXM
BC
Development phase
Pending development
(LF/MF)
ComBalSat
CoE SM Workshop Kiev- 2003
Notification of frequency Assignment for recording in the Master Register
Current and Future Software Development for
Terrestrial Services (TerRaSys)
 Terrestrial Radiocommunication System
 TerRaSys replaced the existing FMS and PMS
and related systems
 New Notices with a New Format
 Relational Database: TerRaBase
 External Access to TerRaBase via TIES
 Software for Electronic Notification
ComBalSat
CoE SM Workshop Kiev- 2003
Notification of frequency Assignment for recording in the Master Register
WEB BR IFIC
ComBalSat
CoE SM Workshop Kiev- 2003
Notification of frequency Assignment for recording in the Master Register
International Frequency Coordination
• Since the electromagnetic spectrum is a global shared asset,
otherwise autonomous administrations must agree to cooperate
for the benefit of all.
• The ITU Radio Regulations are the basis for this agreement.
• The agreed procedures aim to avoid mutual interference by
exchanging and analysing frequency allocation data.
Coordination Procedures:
• There are three main parts to formal coordination procedures:
– how the process will be administered;
– how information is to be recorded, and exchanged;
– how technical information is to be gathered, analysed and
reported.
• Coordination procedures will also specify restrictions on uses of
assigned frequencies.
ComBalSat
CoE SM Workshop Kiev- 2003
Notification of frequency Assignment for recording in the Master Register
THE NEED FOR COORDINATION
WITH WHOM ?
ADMINISTRATIONS OF NEIGHBOURING COUNTRIES WHOSE
TERRITORIES LIE WHOLLY OR PARTLY WITHIN THE
COORDINATION AREA OF THE PLANNED STATION
WHEN ?
BEFORE NOTIFYING TO THE RADIOCOMMUNICATION BUREAU OR
BRINGING INTO USE ANY FREQUENCY ASSIGNMENT TO AN STATION
• Coordination is a regulatory obligation:
- for the administration wishing to assign a frequency to a station;
- for any other administration whose services might be affected;
• The agreement resulting from the coordination involves certain legal
rights and obligations
• Coordination must be effected in accordance with RR procedures and
on the basis of the criteria established by the RR or agreement
between administrations.
ComBalSat
CoE SM Workshop Kiev- 2003
Notification of frequency Assignment for recording in the Master Register
COORDINATION
Coordination of a new network is required when it
operates in the same frequency bands as networks that:
-are in conformity with the provisions of the RR;
- are already recorded in the Master Register;
- or have already been coordinated
- or are undergoing coordination in accordance with Section
II of Art.11;
-if the threshold value of AP29 is exceeded
- Coordination is not required: RR1066-RR1071
• Information required by Appendix S4 (Circular Letter CR/65) sent
to all Administrations with which coordination is required
• Copy sent to the Bureau
• Can commence minimum 6 months after AP-I
• Must be carried out before notification or bringing into use
ComBalSat
CoE SM Workshop Kiev- 2003
COORDINATION PROCESS – Sat.
AP4 data
+
Horizon elevation angle
APP 7 or
Res 46
Coordination
contours
Countries
identified
AP4 Forms
(CL 820,
04.05.90)
Letter for Request of
Coordination
To Radiocommunication
Bureau
VH
copy
To countries identified
COO
NAT
PRO
Notification of frequency Assignment for recording in the Master Register
a)Examination of Notices
 The Bureau examines Appendix 3 information for completeness and
conformity with:
- Table of Frequency Allocations
- Other provisions of the RR (except for coordination provisions and
probability of harmful interference)
 The Bureau identifies any other Administration whose space services
might be affected
 The Bureau publishes the coordination request in a Special Section of
its Weekly Circular including the results of its examination
RR
ComBalSat
• RR 11 Section II (RR 11.27 to RR 11.49)
– In order of their date of receipt
– Regulatory
– Technical
– Compatibility with Regional/Worlwide
Agreements (ST61, RJ81, GE89, etc)
CoE SM Workshop Kiev- 2003
b) Examination
of
notices
Notification of frequency Assignment for recording in the Master Register
Examination of notices
If
the notice contains all the necessary information, it is
published in Part I of the Weekly Circular at the latest two
months after its receipt (11.28/RR 1235). Subsequent
processing of a notice varies according to the frequency
band and service concerned. Article 11 (12) specifies the
various cases.
It is to be noted that the former systematic examination of the
probability of harmful interference, in the bands below 28 MHz,
no longer appears in the Regulations adopted by WRC-95 and
WAC-97, and was even abandoned as from 18 November 1995,
pursuant to the decisions of WRC-95.
ComBalSat
CoE SM Workshop Kiev- 2003
Notification of frequency Assignment for recording in the Master Register
Former notice types
Notice type
To be used for
APS4/A1
Terrestrial transmitting stations
APS4/B
Receiving land stations
APS4/C
Typical terrestrial stations
LF/MF broadcasting stations in
APS4/A2, GE75 Regions 1 and 3
VHF/UHF broadcasting stations
APS4/A4
except covered by AP1/A5, A6
VHF sound broadcasting station
APS4/A5
87.5-108 MHz in R.1, AFG, IRN
VHF/UHF television stations in
APS4/S6
African Broadcasting Area
MF sound broadcasting stations
APS4/A7, RJ81 in Region 2
ComBalSat
Class of station
FX, FL, FB, FA, FD, FG, FC,
FP, NL, AL, LR, SM, SS
MO, ML, MA, MS, OD, RM,
AM, MR, SA
FX, FL, FB, FA, FD, FG, FC,
FP, NL, AL, LR, SM,
BC
BC, BT
BC
BT
BC
CoE SM Workshop Kiev- 2003
Current Notice
type (FXM)
Notification of frequency Assignment for recording in the Master Register
Notice type (FXM)
Notice type
Applicable to
Class of station
T11
T12
Terrestrial transmitting stations
FX
Terrestrial transmitting stations
AL, BC[1], FA, FB, FC, FD, FG, FL, FP,
LR, NL, OE, RN, SM, SS
[1]In non-planned bands below 28MHz.
T13
T14
T15
T16
T17
Receiving land station
AM, MA, ML, MO, MR, MS, NR, OD, RM,
SA
Typical station
AL, FA, FB, FC, FD, FG, FL, FP, LR, NL,
OE, RN, SM, SS
Maritime mobile service AP S25
FC
Plan GE85
AL, FC
Adaptive systems
FX, FA, FB, FC[2], FD[2], FL
[2]In the non-planned bands.
ComBalSat
CoE SM Workshop Kiev- 2003
Notification of frequency Assignment for recording in the Master Register
Current notice types
VHF/UHF Sound & TV BROADCASTING

T01 – VHF sound broadcasting stations.
(replaces APS4/A5 and APS4/A4)

T02 – VHF/UHF television broadcasting stations
(replaces APS4/A6 and APS4/A4)
ComBalSat
CoE SM Workshop Kiev- 2003
Notification of frequency Assignment for recording in the Master Register
Current notice types
VHF/UHF Sound & TV BROADCASTING

TB1 – Form for notification of a modification to the
Administration Unique Identifier

TB2 – Form for notification under Article S11 of an
assignment with all technical characteristics as
in the Plan
ComBalSat
CoE SM Workshop Kiev- 2003
Notification of frequency Assignment for recording in the Master Register
Current notice types
VHF/UHF Sound & TV BROADCASTING

TB3 – Form for requesting publication of a
modification in Part B of the corresponding Special
Section

TB4 – Form for updating the coordination information
of a notice under treatment

TB5 – Form for suppressing an assignment or for
withdrawing a notice under treatment
ComBalSat
CoE SM Workshop Kiev- 2003
Notification of frequency Assignment for recording in the Master Register
Current notice types
LF/MF SOUND BROADCASTING

T03 – LF/MF sound broadcasting stations in
Regions 1 and 3. (replaces APS4/A2, GE75)

T04 – MF sound broadcasting stations in
Region 2. (replaces APS4/A7, RJ81)
ComBalSat
CoE SM Workshop Kiev- 2003
Notification of frequency Assignment for recording in the Master Register
Current notice types
LF/MF SOUND BROADCASTING

TB6 – Form for submission of a modification to the
Administration Unique Identifier

TB7 – Form for notification under Article S11 of an
assignment with all technical characteristics as in the
Plan
ComBalSat
CoE SM Workshop Kiev- 2003
Notification of frequency Assignment for recording in the Master Register
Current notice types
LF/MF SOUND BROADCASTING

TB8 – Form for requesting publication of a
modification in Part B of the corresponding Special
Section

TB9 – Form for suppressing an assignment or for
withdrawing a notice under treatment
ComBalSat
CoE SM Workshop Kiev- 2003
Notification of frequency Assignment for recording in the Master Register
Current notice types
Fixed, Mobile and other Terrestrial Services (except Broadcasting service in the planned bands)

T11 – TERRESTRIAL TRANSMITTING STATION
(TX) IN THE FIXED SERVICE
(Appendix S4, Annexes 1A and 1B)
-replaces APS4/A1

T12 – TERRESTRIAL TRANSMITTING STATION
(TX) except stations in the fixed, or LF/MF and
VHF/UHF broadcasting services, or typical stations
(Appendix S4, Annexes 1A and 1B)
-replaces APS4/A1
ComBalSat
CoE SM Workshop Kiev- 2003
Notification of frequency Assignment for recording in the Master Register
Current notice types
Fixed, Mobile and other Terrestrial Services (except Broadcasting service in the planned bands)

T13 – TERRESTRIAL RECEIVING LAND
STATION (RX)
(Appendix S4, Annexes 1A and 1B)
-replaces APS4/B

T14 – TERRESTRIAL TYPICAL TRANSMITTING
STATION (TP)
(Appendix S4, Annexes 1A and 1B)
-replaces APS4/C
ComBalSat
CoE SM Workshop Kiev- 2003
Current notice types T15
Notification of frequency Assignment for recording in the Master Register
Fixed, Mobile and other Terrestrial Services (except Broadcasting
service in the planned bands)
T15 – FREQUENCY ALLOTMENT IN THE MARITIME MOBILE SERVICE
(Appendix S25)-replaces APS25
ComBalSat
CoE SM Workshop Kiev- 2003
Current notice types T16
Notification of frequency Assignment for recording in the Master Register
Fixed, Mobile and other Terrestrial Services (except Broadcasting
service in the planned bands)
T16 – TERRESTRIAL TRANSMITTING STATION
(TX) – Plan update
Regional Agreement Geneva, 85 (Article 4 of the Agreement)-replaces APS4/A1
ComBalSat
CoE SM Workshop Kiev- 2003
Notification of frequency Assignment for recording in the Master Register
Current notice types T17
 T17 – TERRESTRIAL TRANSMITTING STATION (TX) USING ADAPTIVE
SYSTEMS (Appendix S4, Annexes 1A and 1B) -replaces APS4/A1
ComBalSat
CoE SM Workshop Kiev- 2003
Notification of frequency Assignment for recording in the Master Register
HOW
to notify a frequency
assignment?
Practical exercise on filling in of notice forms:
Seminars and Information meetings
•World Seminar every two years in Geneva
•Two or three Regional Seminars every other year
•Regional Conference Preparatory Meetings
ComBalSat
CoE SM Workshop Kiev- 2003
Notification of frequency Assignment for recording in the Master Register
Incorrect data in SRS database
The detailed examination of the SRS database and the
corresponding IFIC’s shows more than 20000 cases (assignments)
containing incorrect data:
maximum power density in 1 Hz (Pd) is less than average
power in Hz of the emission (Pav) with up to 76 dB (Pav_Pd)
(Table.1.);
Pav = Pa - BWdb
maximum power density (Pd) is higher than total power
(Pa) (Table.2.);
bandwidth of the emission (BWemiss) is wider than the
bandwidth of the channel (bdwdth) (Table.3), etc.
Examination with such incorrect data results in incorrect findings of
the BR. The satellite networks would not work using such vallues of
the parameters, but the coordinations on paper are completed
successfuly.
ComBalSat
MIFR Error 1
CoE SM Workshop Kiev- 2003
Notification of frequency Assignment for recording in the Master Register
Table.12. SRS DB Error Pd <Pav
MIFR Error 2
ntc_id
94500315
96520105
95500072
97520041
91975176
91980022
94520204
97520079
adm
POR
60.33
INS
48.32
MOZ
1.58
USA
27.82
G
J
USA
18.67
B
17.24
sat_name grp_id
EUTELSAT 2-10E
Emiss
94613616
BW
BWdB
307KG1D-- 307.00
Pd
54.87
Pa
-52.70
Pav
62.50
Pav_Pd
7.63
PALAPA-C5
96809197
600KG7W-- 600.00
57.78
-91.10
15.00
-42.78
INTELSAT5A 342E
48.18
USASAT-14I-2
95601523
4K00G1ECF
4.00
36.02
-46.60
37.60
97649063
51K0G7W-- 51.00
47.08
-61.00
13.90
-33.18
L-SAT
91603744
N-STAR-A 91616233
INTELSAT8 60E
40K0G1D-- 40.00
46.02
4K00N0N-- 4.00
36.02
97663931 45K0G1X-- 45.00
-66.00
-40.00
46.53
0.00
16.00
-55.10
-46.02
-20.02
10.10
19.98
19.98
-36.43
B-SAT F
1M50G7W--
61.76
-78.90
0.10
-61.66
97655833
1500
Pav = Pa – BWdb, dB
> 20,000 cases
ComBalSat
CoE SM Workshop Kiev- 2003
MIFR Error
3
Notification of frequency Assignment for recording in the Master Register
Table.2. Error Pd >Pa
ntc_id
96520214
93520111
93500545
96520076
97520041
98520675
adm
CHN
J
USA
J
USA
USA
sat_name grp_id
ASIASAT-DKX
GMS-140E
INTELSAT7 174E
MTSAT-135E
USASAT-14I-2
USASAT-33C
Emiss
96820784
93666277
93670536
96632976
97648940
98099057
BW
BWdB
2M00G7W-1M00G3D-32M2G7W-2M00G1D-36M0G7W-11M3G7W--
Table.3. Error(BWemiss
ntc_id
90502439
90500116
90503706
90504040
93520118
90503081
90500381
adm
D
IND
I
USA
SNG
RUS
USA
sat_name grp_id
DFS-2
85703231
INSAT-2C 87603163
INTELSAT5 ATL4
INTELSAT5 PAC3
ST-1A
93669503
STATSIONAR-7
USASAT-13I
ComBalSat
Pd
2000.00
1000.00
32200.00
2000.00
36000.00
11300.00
Pa
63.01
60.00
75.08
63.01
75.56
70.53
> bdwdth)
Emiss
BWemiss bdwdth
45M0F3F-45000,000 9000
37M0F8W-37000,000 36000
87716469 72M0G1X-72000,000 36000
84720682 72M0F9W-72000,000 36000
45M0F3W-45000,000 36000
87716169 40M0F3F-40000,000 36000
86703324 54M0G7W-54000,000 36000
CoE SM Workshop Kiev- 2003
Pd_Pa
62.20
42.20
63.20
51.40
60.70
69.00
0.00
-1.10
11.20
6.80
14.90
1.50
62.20
43.30
52.00
44.60
45.80
67.50
Notification of frequency Assignment for recording in the Master Register
Conclusions
• The usefulness of the Master Register depends on the
notifications made by each administration
Analysis of the ITU-BR SRS database show that a large number
of networks, already operational, have not been sent to BR for
notification:
-“INTELSAT5 XXX” – 57 notices are under coordination;
-“INTELSAT7 XXX” – 106 notices are under coordination;
-“INTELSAT8 XXX” – 126 notices are under coordination;
-“INTELSAT9 XXX” – all notices are under coordination.
Rights
ComBalSat
Information
Obligations
Participation
CoE SM Workshop Kiev- 2003
Notification of frequency Assignment for recording in the Master Register
For More Information
• ITU Handbook on National Spectrum
Management. Geneva: ITU
Radiocommunication Bureau. Chapter 5.
• An internet tutorial guide containing learning
outcomes, discussion questions and more
references is available through the ITU.
ComBalSat
CoE SM Workshop Kiev- 2003
Notification of frequency Assignment for recording in the Master Register
More information:
Bontcho Balabanov
[email protected]
or http://www.ComBalSat.com/
ComBalSat
Тел. (+3592) 9171572
Gsm: (+3592)
0889716224
CoE SM Workshop Kiev- 2003
Notification of frequency Assignment for recording in the Master Register
Any questions ???
ComBalSat
CoE SM Workshop Kiev- 2003
Notification of frequency Assignment for recording in the Master Register
END
ComBalSat
CoE SM Workshop Kiev- 2003
Notification of frequency Assignment for recording in the Master Register
ComBalSat
CoE SM Workshop Kiev- 2003
Notification of frequency Assignment for recording in the Master Register
a)Space Services
•Regulatory and Technical Procedures
–Advance publication
–Request for coordination
–Notification
–Space Plans
•Major objective
–Process these notices within the time limits
specified in the Radio Regulations ???
–Delay in Publications??
ComBalSat
CoE SM Workshop Kiev- 2003
Notification of frequency Assignment for recording in the Master Register
b)Space Services
•Current situation
–Some 20 coordination requests / month
–Backlog situation (more than 1000 networks i.e.
approx. 2.5 years) now being corrected
–Measures adopted by WRC-2000 and
WRC-2003
–Discussion topic for ITU Reform
–After WRC-03 ??
–Satellite network coordination examination
ComBalSat
CoE SM Workshop Kiev- 2003
Notification of frequency Assignment for recording in the Master Register
Preparation of data
(App 4, Section III)
GEOGRAPHICAL DATA :
location, altitude
SATELLITE :location, identification (GEO, NON-GEO)
HORIZON ELEVATION ANGLE DIAGRAM
ANTENNA : max. gain, radiation pattern
Other characteristics of the Earth Station :
power, frequencies, noise temperature, A / N
ComBalSat
CoE SM Workshop Kiev- 2003
HORIZON ELEVATION ANGLE
ELEVATION
Horizon Elevation
Angle
Building
Earth station
VH
Notification of frequency Assignment for recording in the Master Register
Coordination request
Coordination information shall be sent (Nos. 9.29, 9.31) by the
requesting administration (Administration A) to all administrations
(Administration B) identified using coordination area.
The coordination is expected to be concluded within a period of four
months but may take longer in many cases due to the requirement
for detailed interference calculations between the earth station and
existing or planned terrestrial stations. The requesting
administration may, therefore, sometimes receive a copy of the
diagram indicating the location of existing terrestrial
radiocommunication stations and/or the ones planned to be brought
into use in the next three years within the coordination area of the
earth station, together with relevant basic characteristics and with
such suggestions to achieve a satisfactory solution to the problem.
ComBalSat
CoE SM Workshop Kiev- 2003
Notification of frequency Assignment for recording in the Master Register
a)Terrestrial stations
Coordination of terrestrial stations within the
coordination area of an earth station
Coordination with respect to earth station
assignments
which are :
• in conformity with RR1503 and
• either coordinated under RR1107 or for which
coordination has been initiated (not for Res 46)
or
• recorded in the MIFR with a favourable finding.
Administration requesting coordination should
send to the Administration concerned :
- Diagram with location of the terrestrial stations ;
- characteristics of frequency assignments ;
- planned date of bringing into use.
ComBalSat
CoE SM Workshop Kiev- 2003
Notification of frequency Assignment for recording in the Master Register
b)Terrestrial stations
Coordination of frequency assignments to
terrestrial stations for transmission in relation
to earth stations (Section IV, Article 9; Res 46)
- Protection of receiving earth stations
(Coordination of receiving terrestrial stations is not
required w.r. to transmitting E.S.)
- Coordination in frequency bands:
> 1 GHz (GEO, NON-GEO)
: Art 9
NON-GEO (mobile+F.L.E.S.) : Res 46
ComBalSat
CoE SM Workshop Kiev- 2003
Notification of frequency Assignment for recording in the Master Register
Affected Administrations
• Affected Administration examines coordination
request and then notifies requesting Administration
within 4 months of date of publication of either:
- its agreement to the proposal, or
- its disagreement, along with pertinent details upon
which disagreement is based .
• Administration initiating coordination communicates
to the Bureau, after 4 months, the agreement obtained
and the progress made with other administrations.
ComBalSat
CoE SM Workshop Kiev- 2003
Notification of frequency Assignment for recording in the Master Register
ARTICLE 14 PROCEDURE
1. Agreement for the use of frequencies in accordance with
footnotes to the Table
2. Additional to the Article 11 coordination procedure
(initiated before or at the same time as the Article 11
procedure)
3. Request to the BR for publication (AP3 forms or AP4 with
additional data)
4. BR publication of AR14/C/ Special Section with names
of administrations whose services might be affected
Space: GSO and non-GSO, terrestrial services)
Next changes are now in RR:
No. 9.35 (former Articles 11, 14..),
No. 9.21 (former Article 14),
No. 9.11 (broadcasting-satellite service (BSS) bands under Resolution 33)
No. 9.11A (as Resolution 46).
ComBalSat
CoE SM Workshop Kiev- 2003
Notification of frequency Assignment for recording in the Master Register
a)Resolution 46
RESOLUTION 46 (NON-GSO satellite networks in certain
frequency bands)
• Interim procedures for the coordination and notification of
frequency assignments of satellite networks in certain
space services and other services to which certain bands
are allocated
Applicability:
• NON-GSO IN RELATION TO NON-GSO, GSO, TERRESTRIAL SYSTEMS
• GSO IN RELATION TO NON-GSO
• TERRESTRIAL IN RELATION TO EARTH STATIONS (NON-GSO)
• IN ADDITION TO ARTICLES 11, 13 FOR GSO
• REPLACES ARTICLES 11, 13 FOR NON-GSO
ComBalSat
CoE SM Workshop Kiev- 2003
Notification of frequency Assignment for recording in the Master Register
b)Resolution 46
Coordination of E.S. of Non.GSO networks in
relation to terrestrial stations and terrestrial stations
for transmission in relation to E.S. as well as
coordination of E.S. in relation to other E.S. in the
opposite direction of transmission
COORDINATION AREA (RES.46)
ANNEX 2 TO THIS RESOLUTION:
Predetermined coordination distances
Distances that are to be calculated (Rec. ITU-R M.1185, IS.847 AND 849)
ComBalSat
CoE SM Workshop Kiev- 2003
DINATI
ON
AREA
COORDINATION AREA (Res 46)
B
C
A
Coordination area
EARTH STATION AT A SPECIFIED FIXED POINT
A circular zone with radius of the coordination
distance centered on the coordinates of the E.S.
MOBILE EARTH STATION
The service area is extended in all directions by
the appropriate coordination distance
COORDINATION PROCESS
AP4 data
+
Horizon elevation angle
APP 7 or
Res 46
Coordination
contours
Countries
identified
AP4 Forms
(CL 820,
04.05.90)
Letter for Request of
Coordination
To Radiocommunication
Bureau
VH
copy
To countries identified
COO
NAT
Notification of frequency Assignment for recording in the Master Register
Terrestrial stations Process
- Copy to the Bureau
- Notification under Section I of Art12 of existing terrestrial
stations or those to be brought into use within 3 months
- When an agreement is reached;
Notification under Section I of Art12 of existing terrestrial
stations or those to be brought into use within 3 years
ComBalSat
CoE SM Workshop Kiev- 2003
Notification of frequency Assignment for recording in the Master Register
Action by the Administration responsible for
terrestrial stations
Acknowledge
receipt of coordination data within
(30+15) days (RR1115)
Collecting terrestrial data
- existing or in operation stations
- stations (plan) within the next 3 years
Technical examination –

Examine the coordination data;
A decision
is to be taken within 4 months
Request BR’s assistance
RR1142-RR1144
ComBalSat
CoE SM Workshop Kiev- 2003
Notification of frequency Assignment for recording in the Master Register
Examination of the coordination request
• Collect technical data for terrestrial stations to be
taken into consideration :
- recorded in MIFR;
- in operation in conformity with the RR but not
yet notified to the BR;
Technical examination
- draw on a map with an appropriate scale the location
of the terrestrial stations
- calculate (or use notified) E.I.R.P. of the transmitting
terrestrial stations
- determine the antenna gain of the terrestrial stations
in the earth station direction
- auxiliary contours for the earth stations
ComBalSat
CoE SM Workshop Kiev- 2003
Exami
Notification of frequency Assignment for recording in the Master Register
The method of App7
The method of App7 is based on most
unfavourable assumptions
- more detailed examination (acceptable level of
interference, percentage of time, terrain profile, type
of modulation etc.)
ComBalSat
CoE SM Workshop Kiev- 2003
Notification of frequency Assignment for recording in the Master Register
COORDINATION PROCESS (7)
4 - month period for decision
- agreement (indicating the coordinated frequency
assignments)
- agreement (with a list of appropriate terrestrial stations)
- disagreement with a copy of diagram with locations of
the terrestrial stations within the coordination area
together with all relevant characteristics and suggestion
to solve the problem
ComBalSat
CoE SM Workshop Kiev- 2003
Decisi
on
Dd
Example 1
ES
100 km
dr
Example of a coordination contour
Main beam azimuth
VH
ES : Earth station
Coordination contour
contour for propagation mode (1)
contour for propagation mode (2)
Notification of frequency Assignment for recording in the Master Register
Example 2
ComBalSat
CoE SM Workshop Kiev- 2003
Notification of frequency Assignment for recording in the Master Register
---____
Result
contour for propagation mode (2)
contour for propagation mode (1)
ALB, GRC, I, LYB, TUN: affected administrations
From the coordination contours in Figure 1 and
Figure 2, the countries (affected administrations)
with which coordination has to be sought are
identified for the respective cases.
ComBalSat
CoE SM Workshop Kiev- 2003
Notification of frequency Assignment for recording in the Master Register
PFD Examination
Art.21.6.
PFD hard Limits.
To Protect terrestrial services in sheared bands
Unfavorable findings
Using IFIC data, SRS DB and GIMS DB
Test Points
ComBalSat
CoE SM Workshop Kiev- 2003
Notification of frequency Assignment for recording in the Master Register
Narrow Bandwidth Emissions
The emissions with BW less than reference BW
generate error if a reference BW is not used in
calculations.
Pd
FSS Emissions
Reference
Frequency band for
RR limits
?
Fmin
FSS Assigned BW Fig.
1
Fmax
The narrow bandwidth emissions should be considered in
all reference bands (without empty slots) if operators does’n
supply emissions carrier plan of the satellite transponders
ComBalSat
CoE SM Workshop Kiev- 2003
Notification of frequency Assignment for recording in the Master Register
Broadcasti
ng
Notice type (Broadcasting)
•T01 VHF Sound broadcasting stations
•T02 VHF/UHF Television broadcasting stations
•T03,T04 LF/MF Sound Broadcasting stations in Regions 1,3
and Region 2 respectively
Sound Broadcasting in exclusive HF
bands 5 950 - 26 100 kHz
ComBalSat
CoE SM Workshop Kiev- 2003
b) Broadcasting
Agreements
Notification of frequency Assignment for recording in the Master Register
2. b) Relevant Cases involving Broadcasting Agreements
Regional
LF/MF Broadcasting Agreement, Regions 1 and 3, Geneva, 1975
Regional Agreement
relating to the Use of the Band 87.5 - 108
MHz for FM Sound Broadcasting, Region 1 and part of Region 3 Afghanistan and the Islamic Republic of Iran, Geneva, 1984
Broadcasting in this band is faced with the problem of compatibility
with aeronautical radionavigation services (ILS/VOR) operating in the
immediately adjacent band (108 - 117.95).
Regional
Agreement relating to the Planning of VHF/UHF
Television Broadcasting in the African Broadcasting Area and
Neighbouring Countries, Geneva, 1989
ComBalSat
CoE SM Workshop Kiev- 2003
Notification of frequency Assignment for recording in the Master Register
ComBalSat
CoE SM Workshop Kiev- 2003