PL84-99 Rehabilitation and Inspection Program
Download
Report
Transcript PL84-99 Rehabilitation and Inspection Program
Public Law 84-99, Rehabilitation
and Inspection Program
Mike deMasi
Chief Emergency Management,
PL 84-99 Program Manager
Galveston District
Scott Leimer
Levee Safety Program Manager
Galveston District
October 2014
US Army Corps of Engineers
BUILDING STRONG®
Agenda
Policy and Process
Inspection Criteria
Inspection Process
Repair Policy and Funding
Interim Guidance Changes
BUILDING STRONG®
USACE Authorities and Activities
PL 84-99
• Disaster Preparedness
• Emergency Operations
• Rehabilitation & Insp.
• Water Assistance
• Advance Measures Flood
USACE Provides:
• Emergency Technical & Direct
assistance in response to flood
and coastal storm.
• Provided upon request for
assistance by States.
• Assistance supplements State
and local actions & capabilities
• Hazard Mitigation Flood
BUILDING STRONG®
Authority and USACE Policy
Non-Federal Levee Program
Public Law (P.L.) 84-99:
Disaster preparedness,
advance measures, emergency operations, and
rehabilitation (also known as the Rehabilitation and
Inspection Program or RIP)
Policy
►
►
►
ER/EP 500-1-1, Annex B
Interim Policy memorandum issued 21 March 2014
“Levee Owner’s Manual for Non-Federal Flood Control Works”,
Mar 2006, Appendix C - Flood Control Works (FCW) Inspection
Guide. FCW is now referred to as Flood Damage Reduction
Project.
BUILDING STRONG®
Rehabilitation & Inspection Program
Inspection and Eligibility
Ensures minimum acceptable
performance levels for eligibility
Types of Inspections
► Initial
Eligibility
► Continuing Eligibility
Eligible for inclusion in RIP:
► Federally
constructed, locally maintained
► Non-federally constructed, locally maintained
BUILDING STRONG®
Purpose of USACE Levee Inspections
• Identify deficiencies that need monitoring or immediate repair
• Input to Risk Assessments
• Determine if the levee is being properly operated and maintained
• Determine if sponsor is in compliance with the project
partnership agreement – Fed Projects only
6
BUILDING STRONG®
What are we looking for?
Slope stability
Signs of seepage
Sod Cover
Unwanted vegetation
Depressions/Rutting
Erosion/Bank Caving
Cracking
7
BUILDING STRONG®
Other Typical Inspection Features
Animal Control
Encroachments
Riprap Revetment
and Banks
Closure Structures
Pump stations
Relief Wells/ Toe
Drain Systems
Culverts
8
BUILDING STRONG®
Inspections
Use of checklist
Rate Individual Items/Rate Segment
Give an overall “System” rating
►System rating determined by Interim Guidance
dated 21 March 2014
U rating for individual segment of the system
may/may not remove system from RIP eligibility
Temp-extension of eligibility with System Wide
Improvement Framework (SWIF)
9
BUILDING STRONG®
Inspection Results
IEI Ratings:
► Acceptable
• Active Status
► Minimally
Acceptable
• Active Status
• Meet the established requirements of interim
inspection guidance and ER / EP 500-1-1
► Unacceptable
• Inactive Status
BUILDING STRONG®
Inspection Results
Inspections approved by District LSO
Sponsors are part of the inspection team
Out-brief with sponsors
Written notification to
►
►
►
►
Sponsor
State and county NFIP coordinator/emergency management agency
FEMA
Congressional offices
11
BUILDING STRONG®
Rehabilitation & Inspection Program
Repair Policy
Active projects damaged by a flood or
coastal storm
Deficient / deferred items not included
Pre-disaster condition
Cost share:
► Federal
FDRS: 100% Federal
► Non-Federal FDRS: 80% Federal / 20%
Sponsor
BUILDING STRONG®
Repair Policy
Damages must exceed $15,000 (Local Maint.)
Favorable Benefit Cost Ratio (BCR) is required
Cooperation Agreement required
Land, easements, rights-of-way, relocations and
borrow are the public sponsors’ responsibility to
provide at no cost to the Federal Government
BUILDING STRONG®
Interim Policy
Why?
Life Safety is paramount. Life risk drives prioritization
National emphasis on risk-informed decision making,
transparent communication, and long-term sustainability.
Reevaluate the Rehabilitation Program to synchronize the
program with USACE’s approach to shared responsibility
for flood risk management
Revision of eligibility criteria to promote broader flood risk
management activities
14
BUILDING STRONG®
Interim Policy
New Policy issued 21 Mar 14 applies only to Levee
Systems
Purpose is to allow eligibility determinations to continue
while new policy is developed and work to avoid
incentivizing public sponsors to take action that may
negatively impact natural resources
Vegetation on levees is no longer a criteria for eligibility
15
BUILDING STRONG®
Interim Policy
Eligibility Criteria for Levee Systems:
Interim eligibility criteria for levee systems are a subset (18 items) of existing
inspection checklist. Note: the inspection checklist (Enclosure 2 of the policy
document) has not been changed. Subset of inspection items are those most
directly related to levee performance
Must receive a Minimally Acceptable or Acceptable on all 18 interim eligibility
inspection items to remain Active.
Overall inspection rating will still be determined and communicated to sponsor,
but not linked to eligibility.
The initial eligibility requirements for nonfederal levees remain unchanged.
16
BUILDING STRONG®
Interim Policy
18 Eligibility Criteria for Levee Systems:
Levee Embankments
3. Encroachments
4. Closure Structures
5. Slope Stability
6. Erosion/Bank Caving
10. Animal Control
11. Culverts/Discharge Pipes
14. Under seepage
Interior Drainage Structures
9. Culverts
10. Sluice/Slide Gates
11. Flap gates/flap valves
Pump Stations
17. Intake and Discharge Pipelines
18. Sluice/Slide Gates
19. Flap Gates/Flap Valves
Floodwalls
2. Encroachments
3. Closure Structures
5. Tilting, Sliding, Settlements
6. Foundation of Concrete
8. Under seepage Relief Wells/Toe
Draiage system
BUILDING STRONG®
Interim Policy
Eligibility Criteria for Levee Systems:
An Unacceptable rating on any of the 18 subset of items will result in a
levee system being put in Inactive status. As such, it is possible for a system
to:
• Receive an Unacceptable system rating but determined to be Active in
the Rehabilitation Program, or
• Receive a Minimally Acceptable system rating but determined to be
Inactive in the Rehabilitation Program
If a levee system comprises more than one levee segment, all segments
must meet the interim eligibility criteria for the levee system to be Active.
BUILDING STRONG®
Questions?