Kennedy Space Center
Center Operations Directorate
Engineering & Operations Division
KSC Spacecraft Fueling Services
Presented to:
<general mission>
By:
Chuck Davis, Fueling Team Lead
February 8, 2008
<Add location>
KSC Fueling Service Status
Kennedy Space Center
Center Operations Directorate
Engineering & Operations Division
♦
♦
Have access to all types of propellant delivery containers
♦
Have successfully loaded five NASA spacecraft:
♦
Crew is trained in system operation and equipment is
fully operational

MAP spacecraft on June 3-4, 2001, at KSC

CONTOUR spacecraft on June 6, 2002, at KSC

MESSENGER spacecraft June 29-July 2, 2004, at ASO

Pluto New Horizons spacecraft Dec 4, 2005, at KSC

THEMIS – five spacecraft Jan 4, 2007, at ASO
Next mission is STSS scheduled for June 2008
April 6, 2007
For NASA Internal Use Only
2
KSC Fueling Services Summary
Kennedy Space Center
Center Operations Directorate
♦
Customer provides spacecraft requirements

♦

♦
Propellant OBQ, filter size, interface connections, temperature
and pressure limits, etc
KSC provides service equipment and procedures to
meet those requirements

♦
Engineering & Operations Division
Load propellants and pressurants
Contingency offload at loading facility and pad
Customer participation is encouraged for all planning
and operations activities
Afterward, KSC servicing equipment is prepared to
support the next mission
April 6, 2007
For NASA Internal Use Only
3
Typical Loading Operation
Kennedy Space Center
Center Operations Directorate
Engineering & Operations Division
Pluto New Horizons
Propellant Loading Operation
December 4, 2005, in PHSF at KSC
April 6, 2007
For NASA Internal Use Only
4
Scales Data
Kennedy Space Center
Center Operations Directorate
Engineering & Operations Division
♦
Mettler-Toledo Electromagnetic Force Compensationtype scales
♦
♦
♦
Intrinsically safe electronics plug into facility UPS power
All stainless steel construction
Large scale: 6000 kg capacity w/ 0.6 kg accuracy


♦
Use with GPTU, 120 gal DOT 4BW or DOT 110 cylinders
Deck space ~ 5’ x 7’
Small scale: 600 kg capacity w/ 0.04 kg accuracy


April 6, 2007
Use with 55 gal and smaller DOT 4BW cylinders
Deck space ~ 39”x32”
For NASA Internal Use Only
5
Pressure/Vacuum Panel Data
Kennedy Space Center
Center Operations Directorate
♦
♦
♦
♦
♦
♦
Engineering & Operations Division
Full GN2 or GHe pressure control
Oil-less vacuum pump
Pressurize fuel container to load spacecraft tank
Fill pressurant tank with GN2 or GHe up to ~5500 psig
Can be used to leak test propulsion system
For N2O4 loading, use basic “suitcase” PPRU for 500psi helium source
April 6, 2007
For NASA Internal Use Only
6
Re-designed Liquid System
Kennedy Space Center
Center Operations Directorate
Engineering & Operations Division
♦
Separate panels dedicated to fuel and
N2O4 service
♦
♦
♦
1.0 micron canister filter element
♦
Only part of GSE exposed to fuel or
oxidizer
♦
Multiple copies for multi-program support
Includes a sample, vacuum, & drain port
Use with any sized DOT 4BW cylinder or
a GPTU
Prototype filter assembly
April 6, 2007
For NASA Internal Use Only
7
Fueling Timeline Schedule
Kennedy Space Center
Center Operations Directorate
Engineering & Operations Division
Mission - Fueling Timeline
Page 1 of 1
T
W
T
F
S
S
M
T
W
T
F
S
S
M
T
W
T
F
S
S
M
T
W
T
F
S
S
M
T
W
T
F
S
S
M
T
W
T
F
S
S
M
T
Fue ling Ope rations
De live r Scale to Fue ling Facility High Bay (F - 2-3 We e k s )
Proce dure Sign-off (F - 2 We e k s )
De live r Re m aining GSE to High Bay
Start Hos e As s e m bly (F -~1 We e k )
Re ce ive Fue l De live ry and Drain Containe rs (F -3 Days )
Pre -Tas k and Pre -Te s t Brie fings (F -3 Days )
(SCAPE, EH, Safe ty, QA, Facility, e tc.)
1-Hour Local-Cle ar in High Bay for GSE Hos e Conne ct /
GSE Le ak Te s t to S/C Inte rface (F -2 Day)
Conne ct to S/C - Pe rform Le ak Che ck s Pe rform Safe ty Walk dow ns (F -1 Day)
Fue ling Day (F0)
Re m ove GSE, De live ry and Drain Containe rs From High Bay
Pre pare for Te m porary Storage (F +1 Day)
On-Call Continge ncy Off-Load Support (F + until Launch)
Sum m ary
April 6, 2007
Current Plan
Fuel ing Ops
For NASA Internal Use Only
Hazardous Ops
8
Summary
Kennedy Space Center
Center Operations Directorate
Engineering & Operations Division
♦
KSC has developed a generic spacecraft fueling system
and supporting services
♦
GSE & OMIs conform to rigorous NASA design and
certification requirements
The service is mobile; can fuel a spacecraft at KSC,
VAFB, or other location
♦
♦
♦
NASA missions may use the KSC service thus avoiding
the high cost of creating their own capability
KSC POC: Chuck Davis/TA-E3



April 6, 2007
Phone: 321-867-4748