NFSI Super System
Our Mission
Is to provide our customers the best
new technologies and select existing
technologies with honesty and
integrity. NFSI can design drilling
fluid programs for all types of wells.
Environmentally Friendly
NFSI Super System
Benefits
Ease of application
Formation compatibility
Contaminant friendly
Enhanced borehole stability
NFSI SYSTEM
Advantages
INVERT
Gauged Hole
Gauged Hole
Resistance to Chemical
Contamination
Resistance to Chemical
Contamination
Lubricity
Drilling water sensitive
shale's
Excellent Hole Cleaning
No disposal problems (passed
Microtox EC50 Bioassay) LC50
Lubricity
No aromatics to cause harm to rig
personnel
Solids Tolerance
No extra rigging up costs required
Less Expensive (equipment rental,
trucking)
Solids Tolerance
Fast Penetration Rates
Composition of NFSI System
NFS-VISCAPSULETM
Viscosifier
NFS-FILTRATECAPSULETM
Filtrate Control
NFS-SHALECAPSULETM
Shale Stabilizer
NFS-TORQCAPSULETM
Friction Reducer
NFS-LUBRACAPSULETM
Accelerator / ROP
Enhancer
Composition of NFSI System
NFS-VISCAPSULETM
Viscosifier
NFS-FILTRATECAPSULETM
Filtrate Control
NFS-SHALECAPSULETM
Shale Stabilizer
NFS-TORQCAPSULETM
Friction Reducer
NFS-LUBRACAPSULETM
Accelerator / ROP
Enhancer
Before Shale Exposure
After Hot Roll and Drying
Sample from Arkansas
Economics
Significantly lower total cost per barrel
Lower transportation cost
No environmental clean-up cost
Availability of fresh or seawater as base fluid
No cuttings transportation cost
Low maintenance cost
Economics
Significantly lower total cost per barrel
Invert
NFS-Super System
Test ID
Test Group
NFS- Super System
NFS-Houston lab 01172007
PRODUCTS/MIXTURES
PRODUCTS
Freshwater
NFS-VISCAPSULE™
NFS-FILTRATECAPSULE™
NFS-TORQCAPSULE™
NFS-LUBRACAPSULE™
NFS-SHALECAPSULE™
Rev Dust
Barite
PERIOD AGED
TEMPERATURE
DYNAMIC/STATIC
RHEOLOGY:
600 RPM
300 RPM
200 RPM
100 RPM
6 RPM
3 RPM
GELS 10"
GELS 10'
Accretion
TEMP.
PLASTIC VISC.
YIELD POINT
ANAHUAC
OXFORD
TEST DATE
TESTED BY
SAMPLE VOLUME
UNITS
ml
g
g
ml
ml
ml
g
1
350
11.0
2.0
3.5
3.5
7.0
5.0
2
275
9.5
1.0
3.5
3.5
7.0
4.0
g
250
205
HOURS
°F
D/S
°F
lbs/100ft2
lbs/100ft2
cP
lbs/100ft2
%
%
5/10 Min
ml
%
120
71
46
31
19
6
4
4
6
120
74
48
33
18
5
3
3
5
25
21
26
22
Jan-17-2007
Mano Shaarpour/Sam Khosh
350 ml/275
1a
350
11.0
2.0
3.5
3.5
7.0
5.0
2a
275
9.5
1.0
3.5
3.5
7.0
3.0
16
150
D
120
69
43
29
20
5
3
3
5
16
150
D
120
71
44
30
17
4
3
3
6
26
17
50.6
39.2
.09/.11
3.4
1.6
9.8
27
17
51.6
36.8
.12/.14
4.4
1.8
9.6
Lubricity
API FLUID LOSS
SHALE EROSION %
pH
10.4
10.1
COMMENTS: Testing and evaluations of NFS-Super System with new NFS-Shalecapsule
test number one is with full 350 cc water and test number 2 is with 275 cc for a finish barrel of mud 12.2 ppg
The results of 1 a and 2 a are after the hot rolling
NFS Super System
Linear Swell Meter
180
160
PERCENT EXPANSION
140
120
100
80
60
40
20
0
0
100
200
300
400
500
600
700
800
TIME(MINUTES)
NFS Super System 2% vol Shalecapsule
Silicate
PHPA
Clayfree HPMS 6% vol competitor
Clayfree HPMS 4% Shale Inhibitor
DI Water
900
1,000
1,100
1,200
Well Recap
Location: Woodville, TX
Well name: ETOC T. Hole
Total depth: 7300’
Casing 9/58” and 7/78”
Mud System: NFS-Super System
Water base.
Drilled a 12/25” surface hole to 1750’ with conventional gel/water mud. Sat the surface casing 9/58” casing
and tested the casing.
--Cleaned the mud tanks and filled with freshwater and began additions of NFS-Super System.
--Added 10 ppb of NFS-Viscapsule, 1% by volume NFS-Shalecapsule, followed by 1% by volume
NFS-Torqcapsule.
--Maintained a 31-34 funnel viscosity and drilled cement with the new mud system. Drilled
approximately 120’ cement without any contamination.
--Began drilling the 8¾” hole with super system from 1750’ to 2800’. Maintained chemical addition except
for NFS-Shalecapsule; at this point mud viscosity was too high. Water was added to the system and the
desander/desilter was started.
Well Recap continued
--Drilling stopped and pulled the bit to casing and began to circulate and conditioned mud. Added large
volume of water and additions of NFS-Viscapsule, NFS-Shalecapsule and NFS-Torqcapsule; time
to condition mud was approximately 4 hours.
--Mud was conditioned and resumed drilling operation. Drilling continued at the fast rate of
penetration (drilled 1200’ in approximately 12 hours)
--Drilled the 8 ¾” to 6500’ and increased mud density to 9.6 ppg from 9.1 ppg using barite.
Chemical addition continued to maintain a <6 cc filtrate.
--Drilling continued to 7300’ total depth. Circulated bottoms up, made a short trip, back to
bottom with no fill.
--Pulled the bit out of hole and ran successful logs to bottom, no fill. Ran the casing bottom,
no fill.
Well Recap continued
Conclusion:
NFS-Super System was used successfully to drill this 7300’ well in record time. Total drilling
days were reduced by two days, a gage hole was drilled and logged the well successfully.
Surface hole from 1750’ to approximately 6500’ had lots of reactive shale and clay, which was
encapsulated with the NFS-Super System. While drilling cement, no contamination was
observed; in addition the shale shakers handled the flow rate without any gumbo sticking to
the screens.
Important information to apply for future wells:
A:
B:
C:
Run MBT every 1000-1500’ of new hole drilled. Maintain a MBT of <10
Run good stream of water at shaker while your drilling, any other water base muds, 15% to
20% dilution
Run shaker screens of 150 to 210 mesh, plus run desander/desilter as long as possible
Conclusion
This new and revolutionary water based system is now
available. NFSI is excited, prepared, and anxiously
awaiting to help meet your drilling needs.
NFSI currently has finished product available in inventory
located in Houston, TX.
713-780-3600
www.newfluid.com