Pharr district - HIDALGO COUNTY MPO

Download Report

Transcript Pharr district - HIDALGO COUNTY MPO

PHARR DISTRICT
Planning Efforts & Significant Projects
November 20, 2014
Footer Text
Date
District Office
Cameron
Footer Text
PHARR DISTRICT
Date
(13)
(1)
PHARR DISTRICT INTERNATIONAL BRIDGES
Footer Text
Date
Hidalgo County MPO
Harlingen San Benito
MPO
Brownsville MPO
Footer Text
MPOs in PHARR DISTRICT
Date
Hidalgo County RMA
Cameron County RMA
Cameron
Footer Text
RMAs in PHARR DISTRICT
Date
77
281
69E
69C
83
2
INTERSTATE HIGHWAYS In The Rio Grande Valley
Footer Text
Date
1992
1992
Footer Text
REGIONAL MOBILITY PLAN
Date
Rio Grande Valley Mobility Plan
Need for Plan
•
Traditional funding won’t address needs, and
current plans don’t identify all regional needs.
•
Competition for additional funding is tough
without a single documented plan supported
by all.
•
RGV is at a disadvantage without one.
•
There is a perception that the RGV is not
united in regional priorities.
Footer Text
Date
Rio Grande Valley Mobility Plan
Advantages of a Regional Mobility Plan:
•
Provides a single plan covering the entire region.
•
Focuses on regional needs.
•
Is needs based (not financially constrained).
•
Documents valley-wide support of regional priorities.
•
Supports local delegations in pursuing
additional funding.
•
Builds on previous success of past RMPs.
Footer Text
Date
Rio Grande Valley Mobility Plan
1992 Plan
• Completed approximately 85% of major corridor projects identified
(US 83, US 281, US 77)
• Completed approximately 75% of other corridor projects identified.
2003 Plan
• Completed approximately 75% of major corridor projects identified
(US 83, US 281, US 77).
• Completed approximately 75% of other corridor projects identified.
Pharr Letting Volumes
1982 thru 1991 = $35 /Yr
1992 thru 2002 = $107M/Yr
2003 thru 2014 = $174M/Yr
Footer Text
Date
Merging of the Three Valley MPOs
REGIONAL
RIO GRANDE VALLEY MPO
Footer Text
Date
Reasons for TxDOT Initiative:
•
Region will have ONE voice, providing a much greater opportunity for
funding regional-type projects (i.e. FM 1925).
•
Single regional MPO for the Valley would have almost 1.1 million
people in the urbanized area and rank as the fifth largest in the
state by population, following D-FW, Houston, San Antonio, and Austin.
•
TxDOT Commission and Administration have urged local officials in the
past to consider merging the MPOs, most notably at the 9/26/2013 TxDOT
Commission meeting held in McAllen.
•
A single regional MPO would be able to identify regional-type projects
needed to address the following major developments:
Space X, 2nd Access, Mazatlan-Matamoros Mexican Superhighway,
Mexican oil/gas privatization, UT-RGV, Interstates.
•
One set of planning documents, (TIP, MTP, etc.) for the region instead
of three separate ones.
Merging of the Three Valley MPOs
Footer Text
Date
Footer Text
Regionally Significant Projects
Date
Regionally Significant Projects
OUTER PARKWAY
FM 106 (GEN. BRANDT RD.)
SPI 2nd ACCESS
US 281 CONNECTOR
SH 550
WEST PARKWAY
SH 32
Footer Text
LOWER VALLEY
Date
Regionally Significant Projects
FM 1925
SH 365
SH 68
INTERNATIONAL BRIDGE
TRADE COORIDOR (IBTC)
US 281 (MILITARY RD.)
Footer Text
MID-VALLEY
Date
Regionally Significant Projects
STATE LOOP 195
US 83 (LA JOYA) RELIEF ROUTE (PHASE I)
FM 755 REALIGNMENT
US 83 (4 LANE)
US 83 OVERPASSES
Footer Text
UPPER VALLEY
Date
QUESTIONS ?
Footer Text
Date