GAS PIPELINES
FACILITIES
DESPATCH STATION
RECEIPT STATION
PIPELINE BETWEEN DESPATCH & RECEIPT STATION
PIGGING STATION
SV (SECTIONALIZING VALVE) STATION
PREPARATION OF DESIGN BASIS DOCUMENT CONTAINING ALL
THE DATA FOR DESIGN OF PIPELINE AS PER CLIENTS
REQUIREMENT
Engineers India Ltd – Delivering excellence through people
CONTENTS OF DESIGN BASIS
THROUGHPUT DATA : MMSCMD OF GAS
GAS COMPOSITION & TYPE : ASSOCIATED GAS ,
FREE GAS, RLNG, etc.
PIPELINE LENGTH
B/L PRESSURE AT SOURCE & CONSUMER POINTS
LOCATION OF CONSUMERS
CONTRACTED VOLUMES
Engineers India Ltd – Delivering excellence through people
COMMON DESIGN PRACTICES
600# RATED VALVE & FITTINGS CONSIDERED.
MAWP OF 99.93 KG/CM2 G @ 65 0C
DESIGN LIFE DECIDED BY OWNER GENERALLY 25 -30
YEARS
ASME B31.8 & OISD-226 REFERRED FOR GENERAL
GUIDANCE
Engineers India Ltd – Delivering excellence through people
BASIS OF SIMULATION STUDY
33% EXTRA CAPACITY OVER CONTRACTED VOLUME
AS PER PNGRB GUIDELINES TO TAKE CARE OF
FUTURE CONSUMPTION / EXPANSION
OPTIMUM NO. OF COMPRESSOR STATIONS DECIDED
ON FOLLOWING BASIS:
MINIMUM SUCTION PRESSURE AS 45 KG/CM2 G
DISCHARGE PRESSURE OF 92-99.93 KG/CM2 G
POWER PLANT PRESSURE REQUIREMENT~ 25-30
KG/CM2 G
FERTILIZER PLANT REQUIRE AT 40-45 KG/CM2G
PETROCHEMICAL PLANT REQUIRE AT 50-55KG/CM2G
Engineers India Ltd – Delivering excellence through people
BASIS OF SIMULATION STUDY
MAINTAIN VELOCITY LIMIT 10 – 15 m/s
PRESSURE DROP 0.25 – 0.35 Kg/cm2 PER KM
INTER COMPRESSOR DISTANCE 150 – 250 KM
SIMULATION CARRIED TO ESTABLISH HYDRAULICS
FOR THREE LINE SIZES BASED ON ABOVE
GUIDELINES
Engineers India Ltd – Delivering excellence through people
SOFTWARE USED
PIPELINE STUDIO TGNET FROM ESI
(ENERGY SOLUTION INTERNATIONAL)
HYSIS FROM HYPROTECH LTD
WINSIM DESIGN-II
INHOUSE SOFTWARE ON SPREAD SHEET
Engineers India Ltd – Delivering excellence through people
BROAD EQUIPMENT SPECIFICATIONS
(PREPARED FOR ALL OPTIONS)
CONTENTS
PIPELINE:SIZE,
LENGTH,
MATERIAL
OF
CONSTRUCTION (MOC), DESIGN PRESSURE &
TEMPERATURE.
COMPRESSORS:RATED FLOW,
RATIO, RATED BKW, CP/CV, MW
COMPRESSION
SELECTION OF OPTIMUM CONFIGURATION BASED
ON LOWEST NPV(NET PRESENT VALUE)
Engineers India Ltd – Delivering excellence through people
DETAILED EQUIPMENT SPECS.
(FOR OPTIMUM CASE)
CONTENTS:
LINE PIPE
COMPRESSOR INCLUDING AFTER COOLER
GAS FILTERS
KNOCK OUT DRUMS
INSTRUMENTS
• PRESSURE REGULATION SKID.
• METERING
• CONTROL VALVES
• SAFETY VALVES
•
Engineers India Ltd – Delivering excellence through people
P&ID DEVELOPMENT
DETAILS OF PIPING, SIZING & RATING etc.
INSTRUMENTATION
CONTROLS & INTERLOCKS FOR SAFE ,EFFICIENT
& RELIABLE OPERATION OF PIPING SYSTEM
Engineers India Ltd – Delivering excellence through people
UTILITY REQUIRED
UTILITY SUMMARY PREPARED FOR EACH
FACILITY
UTILITIES REQUIRED
• INSTRUMENT AIR (CONTINUOUS BASIS)
• PLANT AIR FOR CLEANING
(INTERMITTENT BASIS)
• NITROGEN FOR PURGING,INERTIZATION,DRY
GAS SEAL (CONTINUOUS BASIS)
• SERVICE WATER FOR FLUSHING & CLEANING
(INTERMITTENT BASIS)
• POWER (CONTINUOUS BASIS)
Engineers India Ltd – Delivering excellence through people
UTILITY REQUIRED (CONTD.)
UTILITIES FOR COMPRESSOR ARE ESTIMATED
FROM DATA BASE OF PREVIOUS PROJECTS.
EQUIPMENT / SPECIFICATION & P&ID DEVELOPED
FOR UTILITY SYSTEMS
Engineers India Ltd – Delivering excellence through people
LIQUID PIPELINES
FACILITIES
DESPATCH STATION
RECEIPT STATION
PIPELINE BETWEEN DESPATCH & RECEIPT STATION
PIGGING STATION
SV STATION
PREPARATION OF DESIGN BASIS DOCUMENT
CONTAINING ALL THE DATA FOR DESIGN OF
PIPELINE AS PER CLIENTS REQUIREMENT
Engineers India Ltd – Delivering excellence through people
CONTENTS OF DESIGN BASIS
THROUGHPUT DATA : MMTPA OF LIQUID
LIQUID TYPE
: CRUDE OIL, HVP LIQUID LIKE
LPG,C2/C3 ,REFINED PETROLEUM PRODUCTS e.g.
MS,SKO,HSD,ATF
SPECIFIC GRAVITY,VISCOSITY AT TWO
TEMPERATURES
PIPELINE LENGTH
B/L PRESSURE AT SOURCE & DESTINATION
LOCATION OF TAP-OFF POINTS
TAP-OFF QUANTITIES
Engineers India Ltd – Delivering excellence through people
COMMON DESIGN PRACTICES
600# RATED VALVE & FITTINGS CONSIDERED.
MAWP OF 99.93 KG/CM2 G @ 65 0C
DESIGN LIFE DECIDED BY OWNER GENERALLY 25 -30
YEARS
ASME B31.4 & OISD-141 REFERRED FOR GENERAL
GUIDANCE
Engineers India Ltd – Delivering excellence through people
BASIS OF SIMULATION STUDY
8000 HRS (333 DAYS)PUMPING CONSIDERED
PER YEAR
OPTIMUM NO. OF PUMPING STATIONS DECIDED
ON FOLLOWING BASIS:
MINIMUM SUCTION PRESSURE AS 4-5 KG/CM2 G
MAXIMUM DISCHARGE PRESSURE OF 90
KG/CM2 G
Engineers India Ltd – Delivering excellence through people
BASIS OF SIMULATION STUDY
(Contd)
MAINTAIN VELOCITY LIMIT OF 2 m/s
PRESSURE DROP 0.50 Kg/cm2 PER KM
INTER PUMPING DISTANCE ABOUT 200 KM
SIMULATION CARRIED TO ESTABLISH HYDRAULICS
FOR THREE LINE SIZES BASED ON ABOVE
GUIDELINES.
Engineers India Ltd – Delivering excellence through people
SOFTWARE USED
PIPELINE STUDIO TLNET FROM ESI
(ENERGY SOLUTION INTERNATIONAL)
INHOUSE SOFTWARE ON SPREAD SHEET
Engineers India Ltd – Delivering excellence through people
SURGE ANALYSYS
SURGE IN PIPELINE IS PRODUCED DUE TO CHANGE IN
VELOSITY OF MOVING STREAM
SURGE ANALYSYS CARRIED OUT FOR FOLLOWING
CASES WHICH RESULT IN CHANGE IN VELOCITY:
CLOSURE OF SECTIONALIZING VALVE ON MAINLINE
CLOSURE OF INLET VALVE OF STORAGE TANK
STOPPAGE OF PUMPS AT ORIGINATING /INTERMEDIATE
STATION
SURGE RELIEF VALVES/INTERLOCKS TO SHUT
PIPELINE THROUGH SCADA PROVIDED TO PROTECT
PIPELINE FROM EXCESS SURGE PRESSURES
Engineers India Ltd – Delivering excellence through people
BROAD EQUIPMENT SPECIFICATIONS
(PREPARED FOR ALL OPTIONS)
CONTENTS
PIPELINE:SIZE,
LENGTH,
MATERIAL
OF
CONSTRUCTION (MOC), ∆P & ∆T.
PUMPS: DIFF. HEAD, SHUT OFF PRESSURE,
RATED FLOW, MOC, SP. GRAVITY OF LIQUID
HANDLED, RATED BKW (η = 75%)
SELECTION OF OPTIMUM CONFIGURATION BASED
ON LOWEST NPV(NET PRESENT VALUE)
Engineers India Ltd – Delivering excellence through people
DETAILED EQUIPMENT SPECS
(FOR OPTIMUM CASE)
LINE PIPE
SCRAPER LUNCHER/RECEIVER
PUMPS
BASKET FILTERS
BLOW DOWN DRUMS
INSTRUMENTS
METERING
CONTROL VALVES
SAFETY VALVES
SURGE RELIEF VALVE
Engineers India Ltd – Delivering excellence through people
BATCH SIZING AND SEQUENCING
(FOR OPTIMUM CASE)
MUTUALLY COMPATIBLE PRODUCTS PUMPED FACE
TO FACE (-SKO-HSD-SKO-MS-SKO-ATF-SKO-)
ESTIMATION OF INTERFACE VOLUMES USING
EQUATION BY AUSTIN AND PALFREY
ESTIMATION OF MINIMUM BATCH VOLUMES TO
RESTRICT CONTAMINATION WITHIN PERMISSIBLE
LEVELS (1% SKO IN MS AND 2% SKO IN HSD)
ESTIMATE BATCH CYCLES OF PRODUCTS AND
TANKAGES REQUIRED AT RECEIPT TERMINALS.
Engineers India Ltd – Delivering excellence through people
Engineers India Ltd – Delivering excellence through people
TECHNICAL IMPROVEMENTS
INTERNAL FLOW IMPROVER EPOXY COATINGS
REDUCTION IN FRICTION LOSSES,PROJECT COST
AND OPERATIONAL COST
VFD MACHINES
FLEXIBILITY
LOSSES
IN
OPERATION,REDUCTION
Engineers India Ltd – Delivering excellence through people
IN
POWER