Water Resources Management in Lao PDR By

Download Report

Transcript Water Resources Management in Lao PDR By

The 2nd Green Mekong Forum
International Conference on “Green Mekong Initiative”
Water Resources Management
in Lao PDR
By:
Mr. Phousavanh Fongkhamdeng
Department of Water Resources,
Ministry of Natural Resources and Environment
21 October 2013, Bangkok, Thailand
1
OverviewWater Resources in Lao PDR





Lao PDR is located in South-East
Asia with Area of 236,800 km2,
approx. 6.2 Mil. people;
90% of the country are in
Mekong Basin;
Water resources per capita is
around 55,000 m3 per year;
35% of annual flow (or equal
270,000 mil. m3) in Mekong is
from Lao tributaries;
The monthly rivers flow by the
pattern of rainfall is around 80%
during the rainy season and 20%
in the dry season.
Overview - The Basin Linkages
IWRM IN LAO PDR
Geography
IWRM instruments
Mekong
Basin
Mekong IWRM Strategy
Mekong IWRM-based BDP
Lao PDR
National Water Resources Strategy
2020 and Action Plan 2011-2015
Nam Ngum
Nam Ngum IWRM Plan
Nam Xong
sub-Basins
Nam Xong sub-basin plans
Watersheds
Integrated Watershed
Management Plans (Nam Po)
IWRM Progress & Cooperation
in Lao PDR
Institutional Aspects:
•
The government is working very
constructively to improve the water
resources planning and management system
in Lao PDR;
•
IWRM responsibility (Ministry of Natural
Resources and Environment (MONRE) + 17
PONRE + 147 DONRE countrywide);
•
Department of Water Resources is one of 17
Departments in MONRE;
•
Water & Water Resources Law (revising, next
month pass GOL Roundtable and expect that
end of 2013 pass National Assembly);
•
Water Resources Strategy 2020 (in place,
indicated 12 major programmes).
National Water Resource Strategy
2020
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
Institutional Strengthening & Coordination;
Legislation, Plans and Implementation;
RB and Sub-RBs WR Planning;
Groundwater Management;
Data & Information Management;
Water Allocation;
Protection of WQ and Ecosystems;
Wetland Management;
Flood and Drought Management;
WR Risk Mgt. & CC Adaptation;
IWRM Financing;
Awareness, Participation & Capt. Building.
3
IWRM Progress & Cooperation
in Lao PDR (cont.)
Technical Aspects:
• Applied IWRM in RB/sub-basin planning & Mgt. – first 5 basins
mentioned in NSEDP 2011-2015 & more (Nam Ngum, Nam Theun-Kading,
Sebangfai, Sebanghieng, Sekong, Sedone…);
• National IWRM Support Programme - IWRM Capacity & Awareness Plans,
RBM+ IWRM Curriculums Development, IRBM Guidelines, Water
Resources Inventory & Modeling, Groundwater Management, Climate
Change to Water, etc (implementing);
• Pilot project on WQ monitoring in RB/sub-basin (Nam Lik, Nam Ting-Nam
Chat, Nam Kho, etc & expanding to others) + guidelines development;
• National IWRM Demonstration Site and training centre in Vangvieng
District , Vientiane Province (approx. 8,000 ha, benchmarking, designing);
• Lao IWRM Financing Study – water use fee, WR fund options, etc.
(putting into Presidential Decree on Natural Resources Charges -ongoing)
• Public-Private-Community IWRM Awareness and Participation.
“Consultation & Public Awareness”
“e.g. River Clean Up Day – Nam Xong”
“e.g. Gender Mainstreaming in IWRM”
Some Challenges

New institutional arrangement & establishment;

Legislations need to improve, IWRM-based plans
(still limited understanding of stakeholders-public,
private, communities);

Limited capacity of concerned staff on RB planning
& management + public awareness & local
participation on IWRM;

Lack of efficient & accurate WR data & information;

WR development increased -WQ and ecosystems
has been degraded in some areas;

Natural disaster frequently occurred and more
severe - floods, drought & CC impact on water
countrywide;

Limit financial support & sustainable mechanism;
Milestones 2011-2015
1) Implement and disseminate the
National Water Resource Strategy 2020
(12 programmes);
2) Continue to update and implement WR
law + its supported legal documents –
decree, regulations, etc;
3) Carry out IWRM-based planning &
management in basins including (NN,
NT-KD, Sekong, Sebangfai, Sebanghieng,
Sedone, Nam Ou) & other tributaries;
4) Create and improve water database &
link with RBs & related line agencies;
5) Study and establish WR fund, water use
fee/benefit sharing for IWRM and
testing its operation;
Milestones 2011-2015 (cont.)
6)
Implement the capacity development &
awareness raising plan on IWRM (plan in
placed);
7)
Prepare and implement WQ, wetlands and
groundwater mgt. plan, profiles and
guidelines;
8)
Flood and Drought Management;
9)
Create demonstration site, training centre on
IWRM + awareness + Capacity Development.;
10) Encourage more stakeholders in IWRM incl.
hydropower, mining and related issue
forums;
11) Promote more investments for conservation
and rehabilitation of WR & response to CCA
on water (small infrastructure, etc). .
Priority Needs for Cooperation
• Lao PDR needs to have
appropriate management
approach, policy suit to Laos
context and capacities for
IWRM including technical
capacity and funding.
• Participate in regional and
global cooperation &
exchange in IWRM in all
aspects (trainings, exchange,
meetings, forums, etc).
Thank You
Contact: [email protected]; [email protected];
Mobile: +856 20 2366 5577
Office Contact:
www.dwr.monre.gov.la
Tel: +856-21 241 744; Fax: +856-21 218 737