Introduction to V&V Techniques
and Principles
Software Testing and Verification
Lecture 2
Prepared by
Stephen M. Thebaut, Ph.D.
University of Florida
Verification and Validation…
• …at the unit/component-level of system
development, is what this course is mostly
about.
• Adds value...by improving product quality and
reducing risks.
• Three approaches:
– Human-based testing
– Formal correctness proofs
– Machine-based testing
Human-Based Testing
• Desk Checking, Walkthroughs, Reviews /
Inspections
• Applicable to requirements / specifications,
design, code, proof of correctness arguments,
test plans / designs / cases, maintenance
plans, etc.
• Can be extremely effective...
Formal Correctness Proofs
“pre-condition”
{X≥2}
loop “invariant”
SP2 := 4
i
while SP2 <= X { ( i  SP2 = 2 Л
2(i-1)  X) Л (X = X’) }
SP2 := SP2 * 2
end_while
i
{ ( i  SP2 = 2 > X Л 2(i-1)  X) Л (X = X’) }
“post-condition”
Formal Correctness Proofs (cont’d)
• Require formal specifications and appropriate
proof methods.
• Do not eliminate the need for testing.
Machine-Based Testing
• Execution of (“crafted”) test cases
• Actual and expected results (i.e., program
behaviors) are compared.
Definitions of “TESTING”
• Hetzel: Any activity aimed at evaluating an
attribute or capability of a program or system.
It is the measurement of software quality.
• Beizer: The act of executing tests. Tests are
designed and then executed to demonstrate
the correspondence between an element and
its specification.
Definitions of “TESTING” (cont’d)
• Myers: The process of executing a program
with the intent of finding errors.
• IEEE: The process of exercising or evaluating
a system or system component by manual or
automated means to verify that it satisfies
specified requirements or to identify
differences between expected and actual
results.
Definitions of “TESTING” (cont’d)
• Testing undertaken to demonstrate that a
system performs correctly is sometimes
referred to as validation testing.
• Testing undertaken to expose defects is
sometimes referred to as defect testing.
Evolving Attitudes About Testing
• 1950’s
– Machine languages used
– Testing is debugging
• 1960’s
– Compilers developed
– Testing is separate from debugging
Evolving Attitudes About Testing (cont’d)
• 1970’s
– Software engineering concepts introduced
– Testing begins to evolve as a technical
discipline
• 1980’s
– CASE tools developed
– Testing expands to Verification and Validation
(V&V)
Evolving Attitudes About Testing (cont’d)
• 1990’s
– Increased focus on shorter development
cycles
– Quality focus increases
– Testing skills and knowledge in greater
demand
– Increased acceptance of testing as a
discipline
Evolving Attitudes About Testing (cont’d)
• 2000’s
– More focus on shorter development cycles
– Increased use of Agile methods: Test-First /
Test-Driven Development, customer
involvement in testing, and the use of
automated testing frameworks (e.g., JUnit)
– Better integration of testing / verification /
reliability ideas
– Growing interest in software safety,
protection, and security
Let’s Pause for a Moment…
Imagine that it’s summertime and that a
3-day weekend is just starting… Wouldn’t
it be great to just grab a fishin’ pole and
head on out to the lake!
Fisherman’s Dilemma
• You have 3 days for fishing and 2 lakes from
which to choose. Day 1 at lake X nets 8 fish.
Day 2 at lake Y nets 32 fish. Which lake do
you return to for day 3?
• Does your answer depend on any
assumptions?
Di Lemma
• In general, the probability of the existence of
more errors in a section of a program is
directly related to the number of errors
already found in that section.
Invalid and Unexpected Inputs
• Test cases must be written for INVALID and
UNEXPECTED, as well as valid and expected,
input conditions.
• In many systems, MOST of the code is
concerned with input error checking and
handling.
Anatomy of a Test Case
• What are the parts of a test case?
1. a description of input condition(s)
2. a description of expected results
• Where do ‘‘expected results’’ come from?
Who Should Test Your Program?
• Most people are inclined to defend what they
produce – not find fault with it.
• Thus, programmers should in principle avoid
testing their own programs.
• But what if this is not possible or appropriate?
Testing Techniques
• Black-Box: Testing based solely on analysis
of requirements (unit/component
specification, user documentation, etc.). Also
know as functional testing.
• White-Box: Testing based on analysis of
internal logic (design, code, etc.). (But
expected results still come from
requirements.) Also known as structural
testing.
Levels or Phases of Testing
• Unit: testing of the smallest programmer
work assignments that can reasonably be
planned and tracked (e.g., function,
procedure, module, object class, etc.)
• Component: testing a collection of units that
make up a component (e.g., program,
package, task, interacting object classes, etc.)
Levels or Phases of Testing (cont’d)
• Product: testing a collection of components
that make up a product (e.g., subsystem,
application, etc.)
• System: testing a collection of products that
make up a deliverable system
Levels or Phases of Testing (cont’d)
• Testing usually:
– begins with functional (black-box) tests,
– is supplemented by structural (white-box)
tests, and
– progresses from the unit level toward the
system level with one or more integration
steps.
Other Types of Testing
• Integration: testing which takes place as subelements are combined (i.e., integrated) to
form higher-level elements
• Regression: re-testing to detect problems
caused by the adverse effects of program
change
• Acceptance: formal testing conducted to
enable the customer to determine whether or
not to accept the system (acceptance criteria
may be defined in a contract)
Other Types of Testing (cont’d)
• Alpha: actual end-user testing performed
within the development environment
• Beta: end-user testing performed within the
user environment prior to general release
• System Test Acceptance: testing conducted
to ensure that a system is “ready” for the
system-level test phase
Other Types of Testing (cont’d)
• Soak: testing a system version over a
significant period of time to discover latent
errors or performance problems (due to
memory leaks, buffer/file overflow, etc.)
• Smoke (build verification): the first test after
a software build to detect catastrophic failure
(Term comes from hardware testing…)
• Lights out: testing conducted without human
intervention – e.g., after normal working
hours
Testing in Plan-Driven Software
Development
Requirements
definition
System and
software design
Implementation
and unit testing
Integr ation and
system testing
Operation and
maintenance
Plan-Based Testing Process Activities
Test Planning
Test Design
Test Implementation
Test Execution
Execution Analysis
Result Documentation
Final Reporting
Testing in Incremental (E.G., Agile)
Software Development
Concurr ent
activities
Outline
description
Specification
Initial
version
Development
Intermediate
versions
Validation
Final
version
†
Test-Driven Development (TDD)
• TDD was introduced in support of agile
methods such as Extreme Programming.
However, it can also be used in plan-driven
development processes.
• Code is developed incrementally, along with a
test for that increment. You don’t move on to
the next increment until the code that you
have developed passes its test.
†
TDD is taken to be synonymous with “Test-FIRST Development (TFD)” by
some. Others use the terms differently. See below.
Test-Driven Development (TDD)
TDD Process Activities
1. Identify the next required increment of
functionality.
2. Write a test for this functionality and implement
the test as a program.
3. Run the test, along with all other tests that have
been implemented. (The new test will “fail” since
you have not yet implemented the functionality.)
4. REPEAT: Implement the functionality, refactor,
and re-run the test(s) UNTIL all tests “pass.”
5. Go back to step 1.
Rationale for TDD
“When you test first, you capture your intent
in an automatable and executable form. You
focus on what you are about to write in a way
that works to prevent defects rather than create
them. The tests you write serve as a persistent
reinforcement of that intent going forward. In
addition to helping you do the thing right, it
helps you to do the right thing.”
─ Stephen Vance, in Quality Code, 2014
TDD versus TFD
• A distinction is sometimes drawn between
“Test-Driven” and “Test-First” Development...
• For some, “Test-driven” simply means that a
program’s design is influenced by testing, for
example by refactoring the code to make it
easier to test. “Test-first” would further imply
that test cases are written and run before
features are implemented.
• Others use the terms synonymously...
What Doe$ Te$ting Co$t?
• About 50% of the total life-cycle effort is
spent on testing.
• About 50% of the total life-cycle time is spent
on testing.
When Might Testing Guarantee an
Error-Free Program?
a. When branch, condition, and loop coverage
are achieved
b. When dataflow testing is utilized
c. When path and compound condition coverage
are achieved
d. When all combinations of all possible input
and state variable values are covered
e. (None of the above.)
Exhaustive Testing is Exhausting
• Situation:
– A module has 2 input parameters.
– Word size is 32 bits.
– Testing is completely automated: 100
nanoseconds are required for each test
case.
• Question: How long would it take to test
this module exhaustively, i.e., covering
every possible combination of input values?
Exhaustive Testing is Exhausting
(cont’d)
• Short Answer:
• Long Answer:
Electronic throttle testing
• Feb. 3, 2010 (Bloomberg) – Electronic
throttle systems are under review by
safety officials as a possible cause of
sudden acceleration in Toyota Motor
Corp. vehicles, as alleged in at least seven lawsuits.
• Toyota has said it ruled out electronics as a cause of
sudden acceleration that has resulted in recalls of
millions of its cars and trucks.
• “In terms of electronics of the vehicle, we’ve done
exhaustive testing and we’ve found no issues with
the electronics,” Toyota’s Lentz said on a conference
call with reporters Feb. 1.
The ECONOMICS of Testing
• In general, we can’t test everything (i.e., test
exhaustively).
– We need to weigh COST and RISK.
– When is it not cost effective to continue
testing?
• Conventional wisdom: V&V should continue
until there is confidence that the software is
“fit for purpose.”
• The level of confidence required depends on
at least three factors...
Factors affecting level of confidence
required
• Software function/purpose: Safety-critical
systems, for example, require a much higher
level of confidence than demonstration-ofconcept prototypes.
• User expectations: Users may have low
expectations or may tolerate shortcomings
when the benefits of use are high.
• Market environment: Getting a product to
market early may be more important than
finding additional defects.
Ken Johnston’s “Minimum Viable
Quality (MVQ)” testing model†
• Builds on premise that some companies test
their web-based software services too much
before releasing them to production:
“You need to be comfortable with testing less
and knowingly shipping buggier software
faster than ever before. Speed of release is
the vital competitive advantage in the world
of connected services and devices.”
†Ken Johnston is a former Director of Test Excellence at
Microsoft Corp.
MVQ testing model (cont’d)
• “...new code is pushed to a subset of users; if
it’s too buggy, a quick fail back to last known
good takes the code out of use with minimum
negative user impact.”
• “...you start to get data about how the code is
functioning in production with real users more
quickly.”
• “The key aspect is to balance...the feature set
and (their) quality... If it is too low, then you
won’t discover and learn the harder to find bugs
because the code won't be exercised.”
MVQ testing model (cont’d)
• See Ken Johnston’s Guest Lecture from Spring
’14 on the CEN 4072/6070 E-Learning website
(via the Course Video Lecture tab):
CEN6070_Supplement_01-hh.mp4
• The lecture is entitled, “The Future of Testing
is EaaSy,” and describes his MVQ model in a
more general context.
• Note that Exam 1 will include questions based
on Ken’s recorded lecture.
Costs of Errors Over Life Cycle
• The sooner an error can be found and
corrected, the lower the cost.
COST
• Costs can increase exponentially with time
between injection and discovery.
TIME
Costs of Errors Over Life Cycle
(cont’d)
• An industry survey showed that it is 75 times
more expensive to correct errors discovered
during “installation” than during “analysis.”
• One organization reported an average cost of
$91 per defect found during “inspections”
versus $25,000 per defect found after product
delivery.
V&V for Software Engineers
• V&V techniques have evolved considerably
and require specialized knowledge, disciplined
creativity, and ingenuity.
• Software engineers should be familiar with all
V&V techniques, and should be able to employ
(and assess the effectiveness of) those
techniques appropriate to their
responsibilities.
Vehicles for Continuous Process
Improvement
• Post-Test Analysis: reviewing the results of a
testing activity with the intent to improve its
effectiveness
• Causal Analysis: identifying the causes of
errors and approaches to eliminate future
occurrences
• Benchmarking: general practice of recording
and comparing indices of performance, quality,
cost, etc., to help identify “best practices”
Introduction to V&V Techniques
and Principles
Software Testing and Verification
Lecture 2
Prepared by
Stephen M. Thebaut, Ph.D.
University of Florida