802.11 Nov 2011 Closing Plenary Reports Date: Authors: Name

Download Report

Transcript 802.11 Nov 2011 Closing Plenary Reports Date: Authors: Name

Nov 2011
doc.: IEEE 802.11-11/1561r1
802.11 Nov 2011 Closing Plenary Reports
Date: 2011-11-11
Authors:
Name
Company
Adrian Stephens
Intel
Corporation
Report
Address
Phone
email
+44 792 008
4900 (mobile)
[email protected]
Slide 1
Adrian Stephens, Intel Corporation
Nov 2011
doc.: IEEE 802.11-11/1561r1
Abstract
• This document is a digest of the closing reports of all
802.11 sub-groups for presentation at the November
2011 closing plenary meeting.
Report
Slide 2
Adrian Stephens, Intel Corporation
Nov 2011
doc.: IEEE 802.11-11/1561r1
Attendance Summary by Group
Breakout
Avg
Attendance
Meetings
Sum Attendance
Min
Attendance
Max Attendance
802.11 MID-SESSION PLENARY
1
201
802.11 Newcomer Training
1
15
802.11 OPENING PLENARY
1
188
ARC
1
18
Editors Meeting
1
9
JTC1
3
6
20
7
6
Monday Tutorials
2
85
170
137
33
PAR Comments
3
7
22
9
4
Reg SC
1
38
TGaa
6
9
57
15
4
TGac
10
65
658
127
15
TGad
2
36
73
39
34
TGae
2
13
26
18
8
TGaf
7
51
357
131
16
TGah
8
90
723
140
39
TGai
8
43
345
67
24
TGmb
1
15
WG CAC
2
13
27
15
12
WNG
2
84
168
107
61
Report
Slide 3
Adrian Stephens, Intel Corporation
Nov 2011
doc.: IEEE 802.11-11/1561r1
Attendance Histogram
Report
Slide 4
Adrian Stephens, Intel Corporation
Nov 2011
doc.: IEEE 802.11-11/1561r1
802.11 WG Editor’s Meeting (Nov ‘11)
Date: 2011-11-06
Authors:
Name
Affiliation
Address
Phone
email
Peter Ecclesine
Cisco Systems
170 W. Tasman Dr.,
MS SJ-14-4, San
Jose, CA 951341706
+1-408-527-0815
[email protected]
Report
Slide 5
Adrian Stephens, Intel Corporation
from slide 1/5 of 11-11/1497r2 by Peter Ecclesine (Cisco)
November 2011
Nov 2011
doc.: IEEE 802.11-11/1561r1
Volunteer Editor Contacts
•
•
•
•
•
•
•
•
•
Report
TGmb – Adrian Stephens – [email protected]
TGaa – Alex Ashley – [email protected]
TGac – Robert Stacey – [email protected]
TGad – Carlos Cordeiro – [email protected]
TGae – Henry Ptasinski – [email protected]
TGaf – Peter Ecclesine – [email protected]
TGah – Minyoung Park – [email protected]
TGai – Tom Siep – [email protected]
Editors Emeritus:
– TGk – Joe Kwak– [email protected]
– TGp – Wayne Fisher –
– TGr – Bill Marshall – [email protected]
– TGs – Kazuyuki Sakoda – [email protected]
– TGu – Necati Canpolat – [email protected]
– TGv – Emily Qi – [email protected]
– TGw – Nancy Cam-Winget – [email protected]
– TGz – Menzo Wentink – [email protected]
Slide 6
Adrian Stephens, Intel Corporation
from slide 2/5 of 11-11/1497r2 by Peter Ecclesine (Cisco)
Nov 2011
doc.: IEEE 802.11-11/1561r1
802.11 Style Guide
• See 11-09-1034-03-0000-wg11-style-guide.doc
• Editor’s responsibility includes checking the 2009 IEEE
Standards Style Manual when creating or updating
drafts.
• Submissions with draft text should conform to both the
WG11 Style Guide and IEEE Standards Style Manual
• Note that the Style Guide evolves with our practice
Report
Slide 7
Adrian Stephens, Intel Corporation
from slide 3/5 of 11-11/1497r2 by Peter Ecclesine (Cisco)
Nov 2011
doc.: IEEE 802.11-11/1561r1
Amendment
Editor Amendment Ordering
numbering is
•
Data as of Nov 2011
•
See http://grouper.ieee.org/groups/802/11/Reports/802.11_Timelines.htm
editorial! No
need
Amendment Number
Task Group
REVCOM
Dateto make
802.11 Amendment 8
TGv
Feb 2011 ballot
802.11 Amendment 9
TGu
Feb 2011 comments on
802.11 Amendment 10
TGs
Sept 2011
these
802.11 Revision
802.11mb
Mar 2012*est.
dynamic
802.11-2011 Amendment 1
TGae
Jun 2012
numbers!
802.11-2011 Amendment 2
TGaa
Jun 2012
802.11-2011 Amendment 3
TGad
Dec 2012
802.11-2011 Amendment 4
TGaf
Sept 2013
802.11-2011 Amendment 5
TGac
Dec 2013
802.11-2011 Amendment 6
TGah
July 2013
802.11-2011 Amendment 7
TGai
Sept 2013
Report
Slide 8
Adrian Stephens, Intel Corporation
from slide 4/5 of 11-11/1497r2 by Peter Ecclesine (Cisco)
November 2011
Nov 2011
Nov 2011
doc.: IEEE 802.11-11/1561r1
Draft Development Snapshot
Most
Changes
TG
Published or Draft Baseline Documents
Style
Snapshot
current
Source
MEC
Guide
Editor
Date
fromPublilast
mb
ae
aa
ad
af
ac
ah
ai
shed
doc
report
mb
Y
12.0
Frame 9.0
Yes
2009
Adrian Stephens
8-Nov
shaded
shown
in11.0 6.0
ae
Y
libreoffice
Yes
2009
Henry Ptasinski
10-Nov
3.3
green.
red.aa Y 12.0 6.0 7.0
Word
Yes
2009
Alex Ashley
9-Nov
ad
Y
10.0
5.0
6.0
5.0
af
Y
12.0
5.0
6.0
5.0
1.0
4
ac
Y
9.0
4.0
5.0
3.0
1.0
1.0
ac
Y
12.0
9.0
4.0
5.0
3.0
1.0
ah
Report
Word
Yes
2009
Carlos Cordero
10-Nov
Frame 9.0
No
2009
Peter Ecclesine
6-Nov
Frame 9.0
No
2009
Robert Stacey
19-Jul
No
2009
Minyoung Park
19-Jul
No
2009
Tom Siep
22-Sep
1.0
Frame
10.0
Slide 9
Adrian Stephens, Intel Corporation
Slide
9from slide 5/5 of 11-11/1497r2
by Peter Ecclesine (Cisco)
Nov 2011
doc.: IEEE 802.11-11/1561r1
Closing Report
Date: 11-11-11
Authors:
Name
Company
Clint Chaplin
Samsung Electronics
Report
Address
3000 Orchard Parkway
San Jose, Ca 95134
Phone
email
+1 408 544 2740
firstname dot lastname at
gmail dot com
Slide 10
Adrian Stephens, Intel Corporation
from slide 1/3 of 11-11/1581r0 by Clint Chaplin, Chair (Samsung)
Nov 2011
doc.: IEEE 802.11-11/1561r1
Abstract
Closing report for WNG SC for November
2011, Atlanta, Georgia, USA
Report
Slide 11
Adrian Stephens, Intel Corporation
from slide 2/3 of 11-11/1581r0 by Clint Chaplin, Chair (Samsung)
Nov 2011
doc.: IEEE 802.11-11/1561r1
• Presentations at November 2011 meeting
– Flexibility on Channel Access Allocations (11-11-1485-00-0wng Flexibility
on Channel Access Allocations.pptx) – Antonio de la Oliva
– 802.11s Issues with Adhoc Mode in Mesh Networking (11-11-1492-00-0wng
802.11s Issues with Adhoc Mode in Mesh Networking.ppt) – Romana
Challans
– Update to Improving the Case for Wireless LAN Transmit Power Control Including to better service Mobile Telephones? () – Lawrence Zuckerman
– The better spectrum utilization for the future WLAN standardization (11-111464-00-0wng-the-better-spectrum-utilization-for-the-future-wlanstandardization.pptx) - Yasuhiko Inoue
– Discovery of ESS Services (11-11-1507-00-0wng-discovery-of-ess-services) Stephen McCann
– Efficient Device and Service Discovery for Peer-to-Peer (P2P) scenarios (1111-1517-00-0wng-efficient-device-and-service-discovery-for-peer-to-peerp2p-scenarios.pptx) - Santosh Abraham
• Minutes
– 11-11-1580-00-0wng
• Plans for January 2012
– 1 2 hour session
Report
Slide 12
Adrian Stephens, Intel Corporation
from slide 3/3 of 11-11/1581r0 by Clint Chaplin, Chair (Samsung)
Nov 2011
doc.: IEEE 802.11-11/1561r1
ARC Closing Report
Date: 2011-11-11
Authors:
Name
Affiliations
Address
Phone
email
Mark Hamilton
Polycom, Inc.
1765 W 121st Ave,
Westminster, CO,
80234
720-872-7445
mark.hamilton@polycom.
com
Report
Slide 13
Adrian Stephens, Intel Corporation
from slide 1/6 of 11-11/1569r1 by Mark Hamilton, Polycom, Inc.
Nov 2011
doc.: IEEE 802.11-11/1561r1
Abstract
This document is the closing report for ARC SC,
November 2011, Atlanta meeting
Report
Slide 14
Adrian Stephens, Intel Corporation
from slide 2/6 of 11-11/1569r1 by Mark Hamilton, Polycom, Inc.
Nov 2011
doc.: IEEE 802.11-11/1561r1
Work Completed
• 802 Overview and Architecture Draft 1.2 letter ballot
– Discussed status of comment resolutions
– Two items of interest to 802.11:
• Bit error rate and Packet error rate
• OUI-36 per 802.11p usage
– Will likely need 802.11 WG consolidated comments for next letter
ballot in next couple of months – probably will schedule a
teleconference once dates are known.
• P1905.1
– Intent is to ‘glue’ together technologies for in-home networks
– Make request to EC to request a formal liaison with P1905,
explicitly to include document sharing.
• Minutes are in 11-11/1537
Report
Slide 15
Adrian Stephens, Intel Corporation
from slide 3/6 of 11-11/1569r1 by Mark Hamilton, Polycom, Inc.
Nov 2011
doc.: IEEE 802.11-11/1561r1
Teleconferences
• No specific plan, will schedule with 10 days notice
• Topic(s):
– Next letter ballot on 802 Overview and Architecture
– P1905.1 liaison comments
Report
Slide 16
Adrian Stephens, Intel Corporation
from slide 4/6 of 11-11/1569r1 by Mark Hamilton, Polycom, Inc.
Nov 2011
doc.: IEEE 802.11-11/1561r1
January 2012 Goals
• One 802.11 meeting slot planned to discuss 802 O&A comments
Report
Slide 17
Adrian Stephens, Intel Corporation
from slide 5/6 of 11-11/1569r1 by Mark Hamilton, Polycom, Inc.
Nov 2011
doc.: IEEE 802.11-11/1561r1
802.1AVB “Packet preemption”/
ultra-low latency
• Presentations to 802.3
– http://www.ieee802.org/1/files/public/docs2011/new-avb-boiger-joint-AVB-802-31111.pdf
– http://www.ieee802.org/1/files/public/docs2011/new-avb-nfinn-real-timenetworks-1111-v04.pdf
– General theme is “customer requirement” for ultra-low latency (< 3 to 20 us – on
wired networks(?)) and/or highly predictable traffic
– Requirements from Automotive and Industrial Control uses
– Looked at Qav queue shapers and time-gated queues, insufficient to meet
requirements
• Also discussed this topic with 802.11aa this week
– Did not bring clear requirements for wireless networks
– 802.11 should monitor, be aware of this general push, and prepare to start
considering an 802.11 response
• No action at this time – awareness only
Report
Slide 18
Adrian Stephens, Intel Corporation
from slide 6/6 of 11-11/1569r1 by Mark Hamilton, Polycom, Inc.
Nov 2011
doc.: IEEE 802.11-11/1561r1
JTC1 ad hoc closing report (Nov 11)
Date: 2011-11-11
Authors:
Name
Andrew Myles
Report
Company
Address
Phone
Cisco
email
[email protected]
Slide 19
Adrian Stephens, Intel Corporation
from slide 1/7 of 11-11/1586r0 by Andrew Myles, Cisco
Nov 2011
doc.: IEEE 802.11-11/1561r1
Abstract
Closing report for JTC1 ad hoc
for Nov 2011, Atlanta
Report
Slide 20
Adrian Stephens, Intel Corporation
from slide 2/7 of 11-11/1586r0 by Andrew Myles, Cisco
Nov 2011
doc.: IEEE 802.11-11/1561r1
JTC1 ad hoc focused on preparation for
upcoming SC6 meeting
• Progress in Atlanta (Nov 2011)
– Review liaisons to SC6
• Recently 11ae, 11aa, 11mb were liaised
– Review status of WAPI in SC6 (802.11i replacement)
•
•
•
•
Currently in NP comment resolution
IEEE 802 focused on removing claims about 802.11i security
Reviewed proposals from US & Swiss NBs
Next CRM on 21 Nov
– Review status of 802.1X/AE and 802.16 security replacements
• No progress
• IEEE 802 focused on incorrect claims about 802.1X/AE and 802.16
• Unknown if NP proposals will be made at next SC6 meeting
Report
Slide 21
Adrian Stephens, Intel Corporation
from slide 3/7 of 11-11/1586r0 by Andrew Myles, Cisco
Nov 2011
doc.: IEEE 802.11-11/1561r1
JTC1 ad hoc focused on preparation for
upcoming SC6 meetong
• Progress in Atlanta (Nov 2011)
– Review status of N-UHT (802.11ac replacement)
• Currently being considered as National Standards by MIIT
• IEEE 802 focused on incorrect claims about 802.11n/ac and the threat
to access to 5GHz spectrum in China
• Unknown if NP proposal will be made at next SC6 meeting
– Review plan for ISO/IEC 8802
• Agreed to send IEEE 802 standards to ISO/IEC as long as IEEE 802
retains responsibility to maintain and extend
• Letter in preparation for consideration by EC
– Select delegation for SC6 meeting
• Will have prep meeting next week
• See motion
Report
Slide 22
Adrian Stephens, Intel Corporation
from slide 4/7 of 11-11/1586r0 by Andrew Myles, Cisco
Adrian Stephens, Intel Corporation
Nov 2011
doc.: IEEE 802.11-11/1561r1
IEEE 802 members are encouraged to
participate in their SC6 NBs
• SC6 P-Members
– Korea - KATS
– Spain – AENOR
– France – AFNOR
– USA – ANSI
– UK – BSI
– Germany – DIN
– Greece – ELOT
– Russia - GOST R
– Luxemburg – ILNAS
– Tunisia – INNORPI
Report
– Japan - JISC
– Kazakhstan – KAZMEMST
– Kenya – KEBS
– Belgium - NBN
– Netherlands – NEN
– China – SAC
– Canada – SCC
– Finland – SFS
– Switzerland – SNV
– Czech Republic - UNMZ
Slide 23
from slide 5/7 of 11-11/1586r0 by Andrew Myles, Cisco
Nov 2011
doc.: IEEE 802.11-11/1561r1
JTC1 ad hoc will prepare for next SC6
meeting in Jacksonville
• Plans for Jacksonville (Nov 2011)
– Review results of WAPI comments resolution meetings
– Prepare for next SC6 meeting (Feb 2012 in China)
– ...
Report
Slide 24
Adrian Stephens, Intel Corporation
from slide 6/7 of 11-11/1586r0 by Andrew Myles, Cisco
Nov 2011
doc.: IEEE 802.11-11/1561r1
Motion to empower HoD
• Motion
– The JTC1 ad hoc recommends that Bruce Kraemer be appointed
as HoD to the SC6 meeting in Feb 2012 and the WAPI CRMs and
be authorised to:
• Appoint the IEEE 802 delegation
• Approve any necessary submissions
• Call any necessary preparation teleconferences
• Note: equivalent motion in ad hoc passed 8/0/0
• Moved:
• Seconded:
Report
Slide 25
Adrian Stephens, Intel Corporation
from slide 7/7 of 11-11/1586r0 by Andrew Myles, Cisco
Nov 2011
doc.: IEEE 802.11-11/1561r1
IEEE 802.11 Regulatory SC
Atlanta Closing Report
Date: 2011-11-11
Authors:
Name
Rich Kennedy
Report
Affiliations
Address
Phone
email
Research In
Motion
7305 Napier Trail
Austin, TX 78729
+1-972-207-3554
[email protected]
Slide 26
Adrian Stephens, Intel Corporation
from slide 1/6 of 11-11/1574r0 by Rich Kennedy, Research In Motion
Nov 2011
doc.: IEEE 802.11-11/1561r1
Abstract
This presentation is the closing report for the November
8, 2011 IEEE 802.11 Regulatory Standing Committee
meeting in Atlanta.
Report
Slide 27
Adrian Stephens, Intel Corporation
from slide 2/6 of 11-11/1574r0 by Rich Kennedy, Research In Motion
Nov 2011
doc.: IEEE 802.11-11/1561r1
Regulatory Summary – North America
• US
– FCC 5 GHz rules changes update; NPRM due in December
– Discussed FCC rules and multi-band operation planned in TGad,
TGaf, TGai
– John Notor discussed the waiver requested by Progeny for LMS in
the 902 – 928 MHz band
• Canada
– TVWS Consultation update closed November 4th
Report
Slide 28
Adrian Stephens, Intel Corporation
from slide 3/6 of 11-11/1574r0 by Rich Kennedy, Research In Motion
Nov 2011
doc.: IEEE 802.11-11/1561r1
Regulatory Summary – European Union
• Ofcom
– Completing first round of TVWS trials
– Meeting December 12th to discuss results, the day before the
start of the next SE43 ( ) meeting
• ETSI ERM TG11 meeting December 6 – 10 to
review responses from PE on EN 300 328
revision to complete the work item
• ETSI BRAN bringing sharing mechanisms
adopted in EN 300 328 to EN 301 893 (5 GHz
bands)
Report
Slide 29
Adrian Stephens, Intel Corporation
from slide 4/6 of 11-11/1574r0 by Rich Kennedy, Research In Motion
Nov 2011
doc.: IEEE 802.11-11/1561r1
Regulatory Summary - Asia
• UHT and EUHT
– China CCSA approved and passed the standards to
MIIT
– MIIT studying the responses from industry
– USITO meeting Nov 14, 15 attended by FCC chair
Report
Slide 30
Adrian Stephens, Intel Corporation
from slide 5/6 of 11-11/1574r0 by Rich Kennedy, Research In Motion
Nov 2011
doc.: IEEE 802.11-11/1561r1
Critical Action Issues
• We had an extensive discussion of the impact of FCC
regulations, specifically Parts 15.15 and 15.202, on
planned multi-band operations that are part of TGad,
TGaf and TGai
Report
Slide 31
Adrian Stephens, Intel Corporation
from slide 6/6 of 11-11/1574r0 by Rich Kennedy, Research In Motion
November 2011
Nov 2011
doc.: IEEE 802.11-11/1561r1
Smart Grid SC Closing Report– November 2011
Name
Company
Address
Phone
email
Bruce Kraemer
Marvell
5488 Marvell Lane,
Santa Clara, CA, 95054
+1-321-751-3988
[email protected]
Date: 10 November 2011
Discussion topics during November Atlanta Session
Tuesday Abstract:
1 – Tutorial
https://mentor.ieee.org/802.15/dcn/11/15-11-0802-00-0000-802november-2011-sg-tutorial-composite-r0.pptx
2 - NIST PAP2
3 – NIST Framework
Report
Slide 32
Adrian Stephens, Intel Corporation
from slide 1/7 of 11-11/1582r0 by Bruce Kraemer, Marvell
November 2011
Nov 2011
doc.: IEEE 802.11-11/1561r1
Atlanta Agenda
High level
• PAP02 GOALS, Work plan, Schedule,
– Rewrite of Section 4, 5, 6
• Procedure to apply for Catalog of Standards
NIST Framework document – comment period open
Report
Slide 33
Adrian Stephens, Intel Corporation
from slide 2/7 of 11-11/1582r0 by Bruce Kraemer, Marvell
November 2011
Nov 2011
doc.: IEEE 802.11-11/1561r1
Guideline Sections
•
•
•
•
•
•
•
•
•
Sect 2 Acronyms and Definitions
Sect 3 SG Conceptual Model & Business Requirements
Sect 4 Wireless Technology
Sect 5 Modeling & Evaluation Approach
Sect 6 Factors to Consider
Sect 7 Conclusions
Sect 8 References
Sect 9 Bibliography
Annex (e.g. A, B, C, D, E)
Report
Slide 34
Adrian Stephens, Intel Corporation
from slide 3/7 of 11-11/1582r0 by Bruce Kraemer, Marvell
November 2011
Nov 2011
doc.: IEEE 802.11-11/1561r1
PAP02 Guideline - Schedule Overview
• Wireless Guideline 1 published – Jan 13, 2011
•
•
•
•
•
•
Finalize wireless model – Oct 7, 2011
Revise Sections 2,3,4,5,6,7,8,9,Annex - March 16, 2012
Collect all details on modeling scenarios – Nov 4, 2011
Exercise, refine, output model results – Feb 3, 2012
PAP02 vote on Guideline 2
Submit Guideline 2 to CoS process – April 16, 2012
• Wireless Guideline 2 published – Aug 10, 2012
Report
Slide 35
Adrian Stephens, Intel Corporation
from slide 4/7 of 11-11/1582r0 by Bruce Kraemer, Marvell
November 2011
Nov 2011
doc.: IEEE 802.11-11/1561r1
Wireless Guideline Version 1
Attribute
Identifier of the standard
Title of the standard
Name of owner organization
Latest versions, stages, dates
URL(s) for the standard
Standard Information
NIST IR 7761
Guidelines for Assessing Wireless Standards for Smart Grid
Applications
NIST
1
http://collaborate.nist.gov/twikisggrid/pub/SmartGrid/PAP02Objective3/NIST_PAP2_Guidelines_for_Assessi
ng_Wireless_Standards_for_Smart_Grid_Applications_1.0.pdf
http://collaborate.nist.gov/twiki-sggrid/bin/view/SmartGrid/SGIPCosSIFNISTIR7761
Report
Slide 36
Adrian Stephens, Intel Corporation
from slide 5/7 of 11-11/1582r0 by Bruce Kraemer, Marvell
November 2011
Nov 2011
doc.: IEEE 802.11-11/1561r1
Goals of Guideline 1 to 2 Changes
• Provide a significantly better method for
analyzing/comparing the performance of a wireless
technology in a representative physical environment with a
specified data load scenario
– Utilize realistic data loading (developed by OpenSG)
– Significantly extend the technology modeling (SDO sub com)
– Correct definitions contained in Section 4
Report
Slide 37
Adrian Stephens, Intel Corporation
from slide 6/7 of 11-11/1582r0 by Bruce Kraemer, Marvell
November 2011
Nov 2011
doc.: IEEE 802.11-11/1561r1
Framework Release 2.0
• SGIP calls for Comments on Draft NIST Framework and
Roadmap for Smart Grid Interoperability Standards,
Release 2.0
• Released for public comments via Federal Register Notice on
October 25, 2011
• Click HERE for the NIST Framework and Comments page.
Click HERE for the Draft Release 2.0 [PDF, 5.3 MB].
• The deadline for public comments is November 25, 2011 at
5:00 PM Eastern Time.
http://collaborate.nist.gov/twiki-sggrid/bin/view/SmartGrid/IKBFramework#Draft_NIST_Framework_and_Roadmap
Report
from slide 7/7 of 11-11/1582r0
Nov 2011
doc.: IEEE 802.11-11/1561r1
November 2011 Closing Report -TGmb
Date: 2011-11-09
Authors:
Name
Dorothy Stanley
Report
Affiliations
Address
Phone
Aruba Networks 1322 Crossman Ave +1 630-363Sunnyvale, CA
1389
94089
email
dstanley@arubanetworks.
com
Slide 39
Adrian Stephens, Intel Corporation
from slide 1/6 of 11-11/1567r0 by Dorothy Stanley (Aruba Networks)
Nov 2011
doc.: IEEE 802.11-11/1561r1
Abstract
This document contains the TGmb closing report for
November 2011.
Report
Slide 40
Adrian Stephens, Intel Corporation
from slide 2/6 of 11-11/1567r0 by Dorothy Stanley (Aruba Networks)
Nov 2011
doc.: IEEE 802.11-11/1561r1
Accomplishments
• Developed and approved report to EC requesting
conditional approval to proceed to RevCom
• Recirculation on D12.0 currently underway
– Closes November 13th
• Teleconference calls
– November 15, 18, December 2
– 10am Eastern (7am Pacific), 1 hour
Report
Slide 41
Adrian Stephens, Intel Corporation
from slide 3/6 of 11-11/1567r0 by Dorothy Stanley (Aruba Networks)
Nov 2011
doc.: IEEE 802.11-11/1561r1
Current TGmb Plan of Record
 May 2008 – Issue Call for Comment/Input
 July 2008 – begin process input and old Interpretation requests
Acknowledge previous Task Group referrals










•
•
Report
Sept 2008 – PAR revision process started
Nov 2008 – close receipt of new input
Nov 2008 – WG/EC approval of PAR Revision
Dec 2008 – NesCom/SASB approval PAR Revision
May 2009 – First WG Letter ballot
Nov 2009 – Recirc start
July 2010 – Conditional Sponsor Ballot Approval from EC
August 2010 – Form Sponsor Pool (45 days) – Closes Sept 14
November 2010 – Initial Sponsor Ballot completion
Jan 2011 – Sponsor Recirc. Start
Nov 2011 – WG/EC Final Approval
March 2012 – RevCom/SASB Approval
Slide 42
Adrian Stephens, Intel Corporation
from slide 4/6 of 11-11/1567r0 by Dorothy Stanley (Aruba Networks)
Nov 2011
doc.: IEEE 802.11-11/1561r1
Goals for Nov - Jan 2011
• Recirculation Sponsor Ballot on D12.0
• Comment resolution on any comments received on
D12.0
• Recirculation SB on D12.0 (unchanged) or D13.0 (if
needed)
• Submit draft to RevCom, via continuous process
• January meeting
– Standards Board continuous process follow-up
Report
Slide 43
Adrian Stephens, Intel Corporation
from slide 5/6 of 11-11/1567r0 by Dorothy Stanley (Aruba Networks)
Nov 2011
doc.: IEEE 802.11-11/1561r1
References
Report
Slide 44
Adrian Stephens, Intel Corporation
from slide 6/6 of 11-11/1567r0 by Dorothy Stanley (Aruba Networks)
Nov 2011
doc.: IEEE 802.11-11/1561r1
802.11aa –Robust Audio Video Transport Streaming
Atlanta Closing Report
Date: 2011-11-10
Authors:
Name
Affiliation
Address
Graham Smith
DSP Group
Alex Ashley
NDS Ltd
2941 Sunrise Blvd, #100
+1 916 379 8709
Rancho Cordova , CA
One London Road, Staines, +44 1784 848770
Middlesex, TW18 4EX,
England
Report
Phone
email
[email protected]
[email protected]
Slide 45
Adrian Stephens, Intel Corporation
from slide 1/5 of 11-11/1578r0 by Graham Smith, DSP Group
Nov 2011
doc.: IEEE 802.11-11/1561r1
Work Completed
• Resolved all initial Sponsor Ballot comments (11/1382r3)
• 147 comments
• Discussed 11/1417r1, “Ping-Pang Handoff”
• Consensus that subject was not in PAR for 11aa
• Passed Motion to approve a 15-day Sponsor Group
Recirculation Ballot of D 7.0
• Held a joint meeting with 801.AVB
Report
Slide 46
Adrian Stephens, Intel Corporation
from slide 2/5 of 11-11/1578r0 by Graham Smith, DSP Group
Nov 2011
doc.: IEEE 802.11-11/1561r1
Joint meeting with 802.1AVB
• Provided 11aa update
• New 802.1BA "Audio Video Bridging Systems" standard
– Bridging and Metrics (latency/QoS) are the main topics of BA.
• 802.1AVB have been very happy with the liaison with
11aa and are looking for a continuing similar relationship
to assist with the AV streaming aspects on the wireless
side once 11aa is completed.
Report
Slide 47
Adrian Stephens, Intel Corporation
from slide 3/5 of 11-11/1578r0 by Graham Smith, DSP Group
Nov 2011
doc.: IEEE 802.11-11/1561r1
Goal for January Meeting
• Complete comment resolution of Sponsor Ballot
recirculation comments
• Start new recirculation
Report
Slide 48
Adrian Stephens, Intel Corporation
from slide 4/5 of 11-11/1578r0 by Graham Smith, DSP Group
Nov 2011
doc.: IEEE 802.11-11/1561r1
Timeline 11aa
1.
2.
3.
4.
5.
6.
First Recirculation -- Sep 10, 2010
Form Sponsor pool –May 2011
MEC Done – Aug 2011
Start Sponsor Ballot – Sep 2011
First Sponsor Recirculation – Nov 2011
Sponsor Ballot done (final WG approval) – Mar
2012
7. Final or conditional 802 EC approval – Mar 2012
8. RevCom/SA approval -- June 2012 (need to line up
with appropriate RevCom/SA meeting dates)
Report
Slide 49
Adrian Stephens, Intel Corporation
from slide 5/5 of 11-11/1578r0 by Graham Smith, DSP Group
Nov 2011
doc.: IEEE 802.11-11/1561r1
TGac November 2011 Closing Report
Date: 2011-11-10
Authors:
Name
Affiliations
Address
Phone
email
Osama Aboul-Magd
Huawei Technologies
303 Terry Fox Drive,
Kanata, ONT, K2K-3J1
613-287-1405
Osama.aboulmagd@huaw
ei.com
Report
Slide 50
Adrian Stephens, Intel Corporation
from slide 1/5 of 11-11/1583r0 by Osama Aboul-Magd (Huawei Technologies)
Nov 2011
doc.: IEEE 802.11-11/1561r1
Abstract
This document is the closing report for the TGac for the
November 2011 session.
Report
Slide 51
Adrian Stephens, Intel Corporation
from slide 2/5 of 11-11/1583r0 by Osama Aboul-Magd (Huawei Technologies)
Nov 2011
doc.: IEEE 802.11-11/1561r1
Work Completed
• Complete resolutions of LB 178 comments on
D1.0.
• Approved a motion to proceed to a 30-day
WG letter ballot
• Approved a motion to have a TG ad hoc
meeting, March 7-9, 2012 in the Bay area.
Report
Slide 52
Adrian Stephens, Intel Corporation
from slide 3/5 of 11-11/1583r0 by Osama Aboul-Magd (Huawei Technologies)
Nov 2011
doc.: IEEE 802.11-11/1561r1
January 2012 Goals
• Comments resolution on Draft 2.0
Report
Slide 53
Adrian Stephens, Intel Corporation
from slide 4/5 of 11-11/1583r0 by Osama Aboul-Magd (Huawei Technologies)
Nov 2011
doc.: IEEE 802.11-11/1561r1
Conference Call Times
• Previously Approved
– Nov 17, Dec. 8
• 10:00 - 12:00 ET
– Dec 1, Dec 15
• 10:00-12:00 ET
• January 12, Feb 2nd , 2012
– 10:00 – 12:00 ET
• January 26, Feb 9, 2012
– 20:00 – 22:00
Report
Slide 54
Adrian Stephens, Intel Corporation
from slide 5/5 of 11-11/1583r0 by Osama Aboul-Magd (Huawei Technologies)
Nov 2011
doc.: IEEE 802.11-11/1561r1
TGad November 2011 Closing Report
Date: 2011-11-11
Authors:
Name
Eldad Perahia
Report
Company
Address
Phone
email
Intel
Corporation
2111 NE 25th Ave
Hillsboro, OR 97124
503-712-8081
[email protected]
Slide 55
Adrian Stephens, Intel Corporation
from slide 1/10 of 11-11/1445r0 by Eldad Perahia, Intel Corporation
Nov 2011
doc.: IEEE 802.11-11/1561r1
Abstract
This document is the closing report for TGad for the
November 2011 session.
Report
Slide 56
Adrian Stephens, Intel Corporation
from slide 2/10 of 11-11/1445r0 by Eldad Perahia, Intel Corporation
Nov 2011
doc.: IEEE 802.11-11/1561r1
Work Completed
• Resolved all comments on LB 185 this week
• TG and WG approved motion for recirculation letter
ballot on D5.0
• LB186 started on Nov 9
• TG and WG approved Report to EC on Conditional
Approval to go to Sponsor Ballot
• Proposal for working relationship with CWPAN, Bruce
Kraemer, 11/1570
Report
Slide 57
Adrian Stephens, Intel Corporation
from slide 3/10 of 11-11/1445r0 by Eldad Perahia, Intel Corporation
Nov 2011
doc.: IEEE 802.11-11/1561r1
Proposal for working relationship with
CWPAN (Summary of 11/1570) (1/2)
• Background: CWPAN wishes to modify the 11ad specification in
ways that were not known of by 11ad during its development
including such items as China specific spectrum allocations and
channelization
• Summary of proposal:
– Start a new project to amend 802.11+TGad, e.g. study group, new PAR,
new Task Group
– Mutual exchange of documentation between 802.11 and CWPAN
– Initial ideas on Task Group meeting locations in Asia, attendance, voting
rights
– New task group led by CWPAN principle
• Details regarding the operation of the Task Group require work
during the study group
Report
Slide 58
Adrian Stephens, Intel Corporation
from slide 4/10 of 11-11/1445r0 by Eldad Perahia, Intel Corporation
Nov 2011
doc.: IEEE 802.11-11/1561r1
Proposal for working relationship with
CWPAN (Summary of 11/1570) (2/2)
• CWPAN response positive and supportive
• The IEEE SA staff and officers are aware of the project
proposal and support it
• IEEE SA has recently signed an MOU with CCSA
• Strawpoll in TGad: Do you support the formation of a
study group to establish a forum for developing the
procedural framework, clarifying the technical goals
and developing a PAR and 5C documents focused on
CWPAN extensions to 11ad ?
– yes/no/abs: 31/0/2
Report
Slide 59
Adrian Stephens, Intel Corporation
from slide 5/10 of 11-11/1445r0 by Eldad Perahia, Intel Corporation
Nov 2011
doc.: IEEE 802.11-11/1561r1
Motion to form China 60 GHz (C60G)
Study Group
• Request approval by IEEE 802 LMSC to form an
802.11 Study Group to establish a forum for developing
the procedural framework, clarifying the technical
goals, and developing a PAR and five criteria focused
on CWPAN extensions to P802.11ad
• [TGad strawpoll result: 31-0-2]
Report
Slide 60
Adrian Stephens, Intel Corporation
from slide 6/10 of 11-11/1445r0 by Eldad Perahia, Intel Corporation
Nov 2011
doc.: IEEE 802.11-11/1561r1
LB 186 ePoll
• Read instructions on:
http://www.ieee802.org/11/LetterBallots/LB186ad/LB186_instructi
ons.html, then click on “Cast Your Vote Here”
Click link:
-“Add
comment”
for individual
comment,
-“Upload
comments”
for multiple
comments
Report
Slide 61
Adrian Stephens, Intel Corporation
from slide 7/10 of 11-11/1445r0 by Eldad Perahia, Intel Corporation
Nov 2011
doc.: IEEE 802.11-11/1561r1
Upload Multiple Comments
• New CVS template for comments; do not use old XLS
file
Click link to
download new
CVS template
Report
Slide 62
Adrian Stephens, Intel Corporation
from slide 8/10 of 11-11/1445r0 by Eldad Perahia, Intel Corporation
Nov 2011
doc.: IEEE 802.11-11/1561r1
Goals for January 2011
• Start Sponsor Ballot in December
• Comment resolution on initial Sponsor Ballot
Report
Slide 63
Adrian Stephens, Intel Corporation
from slide 9/10 of 11-11/1445r0 by Eldad Perahia, Intel Corporation
Nov 2011
doc.: IEEE 802.11-11/1561r1
Conference call times
• Previously approved
conference calls
– Oct 27, Nov 17, Dec 8
• 10:00 – 12:00 ET
– Oct 20, Nov 3, Dec 1, Dec 15
• 20:00-22:00 ET
Report
• New conference calls
– Not overlap with TGac
– Dec 22, Jan 5, Jan 26, Feb 9
• 10:00 – 12:00 ET
– Dec 29, Jan 12, Feb 2, Feb 16
• 20:00-22:00 ET
Slide 64
Adrian Stephens, Intel Corporation
from slide 10/10 of 11-11/1445r0 by Eldad Perahia, Intel Corporation
Nov 2011
doc.: IEEE 802.11-11/1561r1
TGae Closing Report – November 2011
Date: 2011-11-08
Authors:
Name
Affiliations
Address
Phone
email
Michael Montemurro
Research in Motion
4701 Tahoe Blvd.
Mississauga, ON. Canada.
L4W 0B4
+1-905-629-4746
[email protected]
Report
Slide 65
Adrian Stephens, Intel Corporation
from slide 1/5 of 11-11/1546r0 by Michael Montemurro, Research In Motion
Nov 2011
doc.: IEEE 802.11-11/1561r1
Abstract
This document is the closing report for the TGae Task
Group for the November 2011 session.
Report
Slide 66
Adrian Stephens, Intel Corporation
from slide 2/5 of 11-11/1546r0 by Michael Montemurro, Research In Motion
Nov 2011
doc.: IEEE 802.11-11/1561r1
Work Completed
• Comment Resolution for Sponsor Ballot Recirculation
on D6.0
– https://mentor.ieee.org/802.11/dcn/11/11-11-1442-03-00ae-tgae-sb-recirc-1comment-resolutions.xls
– Approved resolutions to 17 comments.
– Approved a revised resolution to 1 comment that was rejected on the initial SB
– Approval rating increased to 97% (3 no voters)
• Minutes:
– https://mentor.ieee.org/802.11/dcn/11/11-11-1547-00-00ae-minutes-fromnovember-plenary.docx
• Teleconferences:
– Teleconferences on Wednesday Dec 14 and Jan 11 at 11am ET for
1 hour.
Report
Slide 67
Adrian Stephens, Intel Corporation
from slide 3/5 of 11-11/1546r0 by Michael Montemurro, Research In Motion
Nov 2011
doc.: IEEE 802.11-11/1561r1
TGae Timeline – November 2011
• Initial Working Group Letter Ballot: September ‘10
• Re-circulation Working Group Letter Ballot: January
‘11
• Form Sponsor Ballot Pool: May ’11
• Mandatory Editorial Check: May ’11
• Initial Sponsor Ballot: Aug ’11
• Sponsor Ballot Recirculation: Oct ‘11
• Final WG/EC Approval: Mar ‘12
• RevCom/Standards Board Approval: June ‘12
Report
Slide 68
Adrian Stephens, Intel Corporation
from slide 4/5 of 11-11/1546r0 by Michael Montemurro, Research In Motion
Nov 2011
doc.: IEEE 802.11-11/1561r1
January 2012 Goals
• Resolve comments from latest Sponsor Ballot recirculation
• Prepare for a clean Sponsor Ballot recirculation
Report
Slide 69
Adrian Stephens, Intel Corporation
from slide 5/5 of 11-11/1546r0 by Michael Montemurro, Research In Motion
Nov 2011
doc.: IEEE 802.11-11/1561r1
TGaf Atlanta Closing Report
Date: 2011-11-11
Authors:
Name
Affiliations
Address
Rich Kennedy
Research In
Motion
Cisco
7305 Napier Trail
+1-972-207-3554
Austin, TX 78729
170 W. Tasman Dr., +1-408-527-0815
San Jose, CA,
95134
Peter Ecclesine
Report
Phone
email
[email protected]
[email protected]
Slide 70
Adrian Stephens, Intel Corporation
from slide 1/7 of 11-11/1573r0 by Rich Kennedy, Research In Motion
Nov 2011
doc.: IEEE 802.11-11/1561r1
Abstract
This presentation is the closing report for the twelfth faceto-face meeting of IEEE 802.11 TGaf taking place the
week of November 7, 2011 at the IEEE 802 Plenary in
Atlanta.
Report
Slide 71
Adrian Stephens, Intel Corporation
from slide 2/7 of 11-11/1573r0 by Rich Kennedy, Research In Motion
Nov 2011
doc.: IEEE 802.11-11/1561r1
Agenda
• Approve meeting and teleconference minutes
• Approve the LB171 comment spreadsheet in 1111/277r20
• Approve draft P802.11af D1.04 as the working draft
• Review of the progress since September
• Comment resolution
• PHY planning
• Adjust the timeline as necessary
• Plan for January meeting, Ad Hoc and teleconferences
Report
Slide 72
Adrian Stephens, Intel Corporation
from slide 3/7 of 11-11/1573r0 by Rich Kennedy, Research In Motion
Nov 2011
doc.: IEEE 802.11-11/1561r1
TGaf Accomplishments
• Resolved 237 comments
– 1168 of 1302 comments have Approved resolutions
– New (old) PHY direction will bring back over 100 comments
• Heard a PHY proposal from Ron Porat and Vinko Erceg
• Group decided to adjust our PPV/O for PHY change
– Changed: “In order to meet international requirements and
facilitate the use of multiple contiguous or non-contiguous
channels, use of TGac with changes for TGaf is our focus.” to
“The starting point is to use the High Throughput PHY with
scaling and modifications for the TV bands.”
• Revised the P802.11af timeline
• Planned for January meeting, and weekly teleconferences
– Tuesdays at 21:00 ET
Report
Slide 73
Adrian Stephens, Intel Corporation
from slide 4/7 of 11-11/1573r0 by Rich Kennedy, Research In Motion
Nov 2011
doc.: IEEE 802.11-11/1561r1
Plans for January
• Complete comment resolution
• Incorporate PHY changes
• Prepare draft 2.0 and ask the WG to begin our
second Letter Ballot
Report
Slide 74
Adrian Stephens, Intel Corporation
from slide 5/7 of 11-11/1573r0 by Rich Kennedy, Research In Motion
Nov 2011
doc.: IEEE 802.11-11/1561r1
TGaf Timeline – Updated November 2011
•
•
•
•
•
•
•
•
•
Report
New
Initial Working Group Letter Ballot: January 2011
Second Working Group Letter Ballot: January 2012
Recirculation Letter Ballot: May 2012
Form Sponsor Ballot Pool: October 2012
Initial Sponsor Ballot: November 2012
Recirculate Sponsor Ballot: January 2013
Final WG/EC Approval: July 2013
RevCom/Standards Board Approval: September 2013
Slide 75
Adrian Stephens, Intel Corporation
from slide 6/7 of 11-11/1573r0 by Rich Kennedy, Research In Motion
Nov 2011
doc.: IEEE 802.11-11/1561r1
Teleconferences
• Weekly on Tuesdays:
• Time: 21:00 ET for 120 minutes
Report
Slide 76
Adrian Stephens, Intel Corporation
from slide 7/7 of 11-11/1573r0 by Rich Kennedy, Research In Motion
Nov 2011
doc.: IEEE 802.11-11/1561r1
IEEE 802.11ah Closing Report for
November 2011
Date: 2011-11-10
Authors:
Name
David Halasz
Report
Affiliations
Aclara
Address
th
2315 W. 9 Street
Austin, TX 78703
Phone
email
330-283-2715
dave.halasz@oaktreewirel
ess.com
Slide 77
Adrian Stephens, Intel Corporation
from slide 1/5 of 11-11/1577r0 by David Halasz, OakTree Wireless
Nov 2011
doc.: IEEE 802.11-11/1561r1
Activity in TGah
• Work continued on specification framework
– 11-11-1137-03-00ah-specification-framework-for-tgah.docx
– Modified South Korea channelization
– Added support for a new frame format for a short beacon
• Channel model document updated
– 11-11-0968-02-00ah-channel-model-text.docx
– Outdoor device to device path loss model added
Report
Slide 78
Adrian Stephens, Intel Corporation
from slide 2/5 of 11-11/1577r0 by David Halasz, OakTree Wireless
Nov 2011
doc.: IEEE 802.11-11/1561r1
Going forward
• Update Specification Framework document, providing
details on functional blocks
Report
Slide 79
Adrian Stephens, Intel Corporation
from slide 3/5 of 11-11/1577r0 by David Halasz, OakTree Wireless
Nov 2011
doc.: IEEE 802.11-11/1561r1
Teleconferences
•
•
December 12th at 7 PM ET 1.5 hours
January 9th at noon ET 1.5 hours
•
Desire to have rolling time of noon, 10 AM and 7 PM
Report
Slide 80
Adrian Stephens, Intel Corporation
from slide 4/5 of 11-11/1577r0 by David Halasz, OakTree Wireless
Nov 2011
doc.: IEEE 802.11-11/1561r1
Timeline
• No update, see 11/285 for details
–
–
–
–
–
Report
Internal Task Group Ballot : July 2012
Initial Letter Ballot : November 2012
Initial Sponsor Ballot : November 2013
EC Approval : September 2014
Revcom Approval : November 2014
Slide 81
Adrian Stephens, Intel Corporation
from slide 5/5 of 11-11/1577r0 by David Halasz, OakTree Wireless
Nov 2011
doc.: IEEE 802.11-11/1561r1
IEEE 802.11TGai
Closing Report
Date: 2011-11-09
Authors:
Name
Company Address
Phone
email
Hiroshi MANO
ROOT Inc.
8F TOC2 Bldg. 7-21-11 NishiGotanda, Shinagawa-ku, Tokyo
141-0031 JAPAN
+81-3-5719-7630
[email protected]
Marc Emmelmann
Fraunhofer
FOKUS
Fraunhofer FOKUS
Kaiserin-Augusta-Alle 31
10589 Berlin
Germany
+49-30-3463
7268
[email protected]
Report
Slide 82
Adrian Stephens, Intel Corporation
from slide 1/11 of 11-11/1585r0 by Hiroshi Mano (ATRD Root Lab)
Nov 2011
doc.: IEEE 802.11-11/1561r1
Abstract
This presentation is the closing report for the Atlanta
meeting of the IEEE 802.11 TGai.
Report
Slide 83
Adrian Stephens, Intel Corporation
from slide 2/11 of 11-11/1585r0 by Hiroshi Mano (ATRD Root Lab)
Nov 2011
doc.: IEEE 802.11-11/1561r1
Plan for this week
Atlanta, Nov 2011
• Official time slot
–
–
–
–
Monday AM1 (Joint Adhoc with REG-SC),PM1
Tuesday PM1,
Wednesday PM1,PM2
Thursday AM2,PM1,PM2
• Goals for the Meeting:
– Joint Adhoc with REG-SC
– Review and Approve the Okinawa and Teleconference meeting minutes
– Presentation of submissions
• Submission of Initial technical contribution
• General submission
– TIME line of task group
– Plan for Jan & Teleconference
Report
Slide 84
Adrian Stephens, Intel Corporation
from slide 3/11 of 11-11/1585r0 by Hiroshi Mano (ATRD Root Lab)
Nov 2011
doc.: IEEE 802.11-11/1561r1
Accomplishments TGai 1/3
• Review and approve Okinawa and Teleconference meeting
minutes.
– September 2011 Okinawa Session Minutes
– https://mentor.ieee.org/802.11/dcn/11/11-11-1350-00-00ai-september2011-okinawa-session-minutes.doc
– Oct-Nov Teleconference Minutes
– https://mentor.ieee.org/802.11/dcn/11/11-11-1389-02-00ai-oct-novteleconference-minutes.doc
Report
Slide 85
Adrian Stephens, Intel Corporation
from slide 4/11 of 11-11/1585r0 by Hiroshi Mano (ATRD Root Lab)
Nov 2011
Nov 2011
doc.: IEEE 802.11-11/1561r1
Accomplishments TGai 2/4
• Technical contribution
– 1414r2 Probe Request and Response in Tgai / Katsuo Yunoki (KDDI R&D
Laboratories)
– 1413r0 Real air-time occupation by beacon and probe / Katsuo Yunoki (KDDI
R&D Laboratories)
– 1415r0 AP status broadcast / Katsuo Yunoki (KDDI R&D Laboratories)
– 1436r0 Security requirements for TGai / Robert Sun (Huawei)
– 1488r0/1429r0 fils-auth-with-a-ttp / Dan Harkins (Aruba Networks)
– 1160r3 Fast Authentication for FILS / Cherian, Geroge (Qualcomm Inc.)
– 1426r0 Fast Security Setup / Dezhi Zhang(ZTE Corporation)
– 1453r0/1047r4 Using Upper Layer Message IE in TGai) / Ping Fang (HUAWEI
TECHNOLOGIES CO.,LTD.)
– 0977r6 TGai Upper Layer Setup Proposal / Hitoshi Morioka (ATRD Root Lab)
Report
Slide 86
Adrian Stephens, Intel Corporation
from slide 5/11 of 11-11/1585r0 by Hiroshi Mano (ATRD Root Lab)
Nov 2011
Nov 2011
doc.: IEEE 802.11-11/1561r1
Accomplishments TGai 3/4
• Technical contribution
–
–
–
–
–
–
–
–
–
–
–
–
–
1548r0 Proposal discovery / Paul Lambert (Marvell )
1525r0 IP address assignment indication / Cherian, George (Qualcomm)
1565r0 AP status broadcast / Katsuo Yunoki (KDDI R&D Laboratories)
1523r0 Access Enhancements for FILS: Network Discovery & Access congestion
Improvements / Santosh Abraham (Qualcomm Inc.)
1498r1 GAS version control / Phillip Barber (Huawei)
1499r0 GAS query optimization / Phillip Barber (Huawei)
1500r0 Broadcast probe response / Phillip Barber (Huawei)
1559r0 scanning goals and challenges / Jarkko Kneckt (Nokia)
1521r0 network discovery enhancements AP / Marc Emmelmann (Fokus)
1572r0 sec-prop-poll /Dan Harkins (Aruba Networks)
11-1576r0 Scanning Enhancements for FILS – Normative Text /Marc Emmelmann
(Fraunhofer FOKUS)
11-1014r2 IP address configuration during association / Gabor Bajko ( Nokia )
11-1575r0 Editors_recommendations_for_Submissions
Report
Slide 87
Adrian Stephens, Intel Corporation
from slide 6/11 of 11-11/1585r0 by Hiroshi Mano (ATRD Root Lab)
Nov 2011
Nov 2011
doc.: IEEE 802.11-11/1561r1
Accomplishments TGai 4/4
• Editors Report
– 11-11-1527-00-00ai_TGai_Editors_Report.pptx will be uploaded
late tomorrow morning / Tom Siep (CSR)Approved Weekly
Teleconference schedule
• Approved Time Line
• Approved Plan for January
Report
Slide 88
Adrian Stephens, Intel Corporation
from slide 7/11 of 11-11/1585r0 by Hiroshi Mano (ATRD Root Lab)
Nov 2011
doc.: IEEE 802.11-11/1561r1
Time line of TGai
–
–
–
–
–
–
–
–
PAR Approved, Modified, or Extended
WG Letter Ballots Initial / Recirc
Form Sponsor Ballot Pool / Reform
MEC Done
IEEE-SA Sponsor Ballots Initial / Recirc
Final 802.11 WG Approval
final or Conditional 802 EC Approval
RevCom & Standards Board Final or
Continuous Process Approval
– ANSI Approved
Report
2010-12-08
Jul 12 / Nov 12
May 13
May 13
Jul 13/ Nov13
May 14
May14
Sep 14
N/A
Slide 89
Adrian Stephens, Intel Corporation
from slide 8/11 of 11-11/1585r0 by Hiroshi Mano (ATRD, Root, Lab)
Nov 2011
Nov 2011
doc.: IEEE 802.11-11/1561r1
Teleconference Schedule
• Motion:
– Approve the following schedule of weekly teleconferences.
– Monday 23:59 EST (NY Time) continue from 21st Nov.
– Duration 1Hour
– Using WEB-EX that will be provided by Task Group Chair
• Moved: Marc Emmelmann , Seconded: Lei Wang
• Result: 8 - 2 - 4 passes
Report
Slide 90
Adrian Stephens, Intel Corporation
from slide 9/11 of 11-11/1585r0 by Hiroshi Mano (ATRD, Root, Lab)
Nov 2011
Nov 2011
doc.: IEEE 802.11-11/1561r1
Plan for January
• Plan for January
– Goal
• Close call for submissions
• Drafting draft 0.1
Report
Slide 91
Adrian Stephens, Intel Corporation
from slide 10/11 of 11-11/1585r0 by Hiroshi Mano (ATRD, Root, Lab)
Nov 2011
doc.: IEEE 802.11-11/1561r1
Thanks to all who participated!
Report
Slide 92
Adrian Stephens, Intel Corporation
from slide 11/11 of 11-11/1585r0 by Hiroshi Mano (ATRD Root Lab)