Report on international
standards work
NEFTEGAZSTANDARD 2013
Nizhny Novgorod
October 2013
Alf Reidar Johansen
OGP Standards Manager
Content
• OGP Interim Solution
•
Backup slides
• New ISO/OGP industry proposal
• Status OGP/API TF on long term solution
• Other OGP work
2
OGP Interim Solution compared to ISO
route (simplified)
Project
Initiation
Drafting in
WG
1st Ballot
("DIS")
Comment
Resolution
2nd Ballot
("FDIS")
Drafting in
WG
Publication
of Draft
Comment
Resolution
Publication
of Draft
OGP
Process
replaced
ISO process
Review and approval
by OGP PM & Sponsor
Publiced
Standard
Trade regulation «barrier».
Draft standards text and
comments will be available in
the public domain
.
ISO
Process
4
Next phase
• OGP Continues to offer a safe platform for
drafting international standards to be balloted
and published by ISO.
• OGP and ISO management had a very good
meeting in August.
• The Industry Solution described herein was
proposed by ISO Central Secretariat, building
on ISO Directives and OGP’s role as a liaison
member to ISO/TC67.
9
New OGP solution vs ISO route
(draft & simplified)
Project
Initiation
Project
initiation1)
Drafting in
WG
1st Ballot
("DIS")
Comment
Resolution
2nd Ballot
("FDIS")
Drafting in
WG 2)
Publication
of Draft 4)
Comment
Resolution
Publication
of Draft 3)
OGP
Process
replaced
ISO process
ISO
Process
Review for controlled
technology (TBA)
Publiced
Standard
Trade regulation «barrier».
Draft standards and comments
will be made available in the
public
domain.
Note 1: Project initiation may take place by OGP only.
Note 2: Non-OGP members will be invited
Note 3: May go to FDIS or publication.
Note 4: API material (TBD) may not be used
10
OGP proposed ISO/TC67 resolution
1. ISO/TC67 welcomes the offer from OGP as a
liaison (A) member to continue its assistance
in developing draft ISO standards in a
protected environment and recommends its
members to use this solution, where the
SCs/WGs find it relevant.
2. ISO/TC67 requests its secretariat to cooperate with OGP in such an arrangement.
ISO/TC67 agreed to these resolution in their
plenary meeting in Oslo, September 2013.
11
Joint OGP/API TF long term solution
Establishement
• Joint Task Force (TF) established by OGP and
API management August 2012
• Purpose: Determine a process for the
continued development of globally accepted
international standards for the oil and gas
industry, given the current US and EU trade
sanctions.
• TF membership (15 members):
•
•
•
Six members from API, six from OGP members
Added two lawyers, one facilitator
Staff one each from OGP and API
• Steering Committee (6 members)
13
Joint OGP/API TF long term solution
Terms of References
• Need for a single set of industry standards to avoid
duplication, with the potential for more than one
brand,
• Need for the standards to be globally acceptable and
widely used,
• Need for the standards to be accepted by the
regulatory community,
• A standards setting process as the foundation for the
single set of industry standards that builds on the
existing API/OGP infrastructure and allows for
increased international participation, and
• Need to ensure a legally compliant process.
14
Current status
• From 8 options to one pragmatic (draft)
solution that provides a process to legally
publish standards using either an API or
OGP/ISO process path
• TF will develop governance (front-end
process) to ensure coordination between
stakeholders to avoid duplication and have the
largest possible audience among the global
expert community
• TF awaits the OFAC response to provide the
final framework of the proposed solution
15
Other OGP work
• OGP-IPIECA Good Practice Guidelines for
Development of Shale Oil and Gas for
European operations in final stages of
approval for publication.
• Wells Expert Committee active on:
• BOP reliability - being investigated
• Well Control Incidents Database - alerts
• Human Factors - Training, Competency &
Behaviour guidelines
• Standards prioritized - OGP Report 485 to be reissued these days
16
OGP Contacts
OGP Reception
• [email protected]
• Tel: +44 207 633 0272
Alf Reidar Johansen (Standards manager)
• [email protected]
• Mobile: +47 95 029 079
Jarno Dakhorst (Manager for New Solution)
• [email protected]
• Mobile: +31 6 33 33 46 71
17