Permanent GPS Stations in Israel as Basis for Updated Geodetic Network Gilad Even-Tzur
Download
Report
Transcript Permanent GPS Stations in Israel as Basis for Updated Geodetic Network Gilad Even-Tzur
Permanent GPS Stations in Israel
as Basis for
Updated Geodetic Network
Gilad Even-Tzur
Faculty of Civil and Environmental Engineering
Mapping and Geo-Information Engineering
Technion, Haifa 32000, Israel
Moshe Rozenblum, Einat Salomon
Survey of Israel
1 Lincoln St. Tel-Aviv 65220, Israel
Permanent GPS Stations
in Israel, Sept. 2005
17 Stations
Receivers: 11 Ashtech Z-XII
5 Leica SR530
1 Trimble 5700
Antennas: 9 Ashtech DM
5 Leica DM
2 Topcon CR4
1 Trimble DM
Permanent GPS stations
in Israel, Sept. 2005
10 stations are situated on
stable roof tops
NRIF
Permanent GPS Stations
in Israel, Sept. 2005
7 stations have geodynamic
monuments
LHAV
The Control Center
The GPS receivers are
connected to a control
center, equipped with
master and backup
servers, through frame
relay connections.
The Communication Network
The GPS Data Flow
5 sec sampling rate
Data is downloaded in real
time
The RINEX data is
gathered into 1-hour
interval files and posted on
the internet
Operation Manager Software
The network is controlled by the RTD software.
It is based on epoch-by-epoch technology, which
enables monitoring any changes in the station
coordinates due to deformation and lost
qualities.
Permanent GPS Stations
in Israel, Sept. 2005
RAMO is the official IGS
station in Israel
The data is processed at
SOPAC
The data from RAMO and
DRAG is also processed at
GIBS (GPS-Informations- und
Beobachtungssystem )
The Permanent GPS Stations
in Israel are called:
APN
Active Permanent Network
Free 30 sec sampling rate data is
available at:
ftp://212.179.112.235
The APN Network
Until recently, the APN network
was mainly used for geodetic
and geophysical research.
The APN was used less for
surveying purposes:
- Short sessions
- OTF ambiguity resolution
used
- Lack of transformation
between WGS84 and ITM
VRS - Virtual Reference Station
Economically and practically, there is no need to
increase the number of permanent GPS stations
in Israel.
In order to enable GPS surveying over the entire
state of Israel with direct connection to the
permanent GPS network, VRS technology is
applied.
The VRS is produced by the
GEO++ software
User Interface for Receiving Data
Advantages of Using the APN
Uniformity
Accuracy
Reliability
Simplicity
►
In the near future an RTK option will be
added to the APN network
Datum Definition
► Geodetic datum is a set of parameters and
control points used to:
● Define the size and shape of the earth.
● Define the origin and orientation of the
coordinate systems used to map the earth.
► Geodetic datums range from flat-earth
models used for plane surveying to complex
models used for international applications.
► The datum is the basis for a plane-coordinate
system.
Datum Definition (continuance)
► GPS positions and vectors are referenced in
the WGS-84 datum
► The Israeli coordinate system is
referenced in the GRS-80 reference
ellipsoid with geodetic projection called:
ITM - Israel Transverse Mercator
Datum Transformation
Transformation parameters describe the relations
between two different datum systems.
7 Parameter transformation:
dX
dY
dZ
m
Rx
Ry
Rz
Shifts
Scale
Rotations
Datum Transformation (continuance)
The set of transformation parameters is
determined by a least-squares solution:
VX 1 0 0
V 0 1 0
Y
VZ 0 0 1
X WGS '84
YWGS '84
ZWGS '84
0
ZWGS '84
YWGS '84
dX
dY
ZWGS '84 YWGS '84 dZ X GRS 80 X WGS '84
0
X WGS '84 m YGRS 80 YWGS '84
X WGS '84
0 RX Z GRS 80 ZWGS '84
RY
R
Z
The Plane Coordinates of the APN Points
► Each point from the APN network was
connected by GPS observations to the nearest
1st order control points.
► A local datum transformation was calculated
in order to assign plane coordinates to each
permanent GPS station.
The accuracy of the coordinates is equivalent
to the accuracy of the classical 1st order
control network (~10cm)
Permanent GPS Network
A permanent GPS-based network is obviously
more accurate, reliable and homogenous than a
classical network.
Permanent GPS Network
Supreme Network
New Datum for APN
A set of coordinates that was valid for GPS day 275
of the year 2004 (October 1st , 2004) in the
ITRF2000 coordinate system was set as the fixed
coordinates set for the permanent GPS stations
This set of coordinates defined a new datum
for APN, called
IGD05
Israel Geodetic Datum 2005
Horizontal residuals
resulting from the seven
parameters transformation
between the ITRF2000
(IGD05) datum and the
Israel Grid datum
Scale
Network:
50km
Residual:
5cm
New Datum for Israel Grid
A new set of plane coordinates were adopted for
the APN points.
The new coordinates defined actually new datum
for the Israeli Grid called:
IG05
Israel Grid 2005
The adopted plane coordinates is a result of similarity
transformation between two datums (IGD05 and
IG05) which supplied practically zero residuals in the
least-squares process.
Official 7 Parameters
Transformation
IGD05
IG05
Calculate official 7
parameter
transformation between
the two systems
A flow chart for calculating new control
points in IG05 coordinate system
Measuring methods for establish
new control point
1. Relative to APN station
2. Relative to VRS
3. Relative to base station
4. Geodetic network
Field Work Guidelines
► Two independent Observation sessions
► Observation sessions of at least 10 min
► Time duration between two sessions of at
least 60 min
1. Measuring relative to APN station
First session:
10min
10min
10min
10km
TELA
10min
1. Measuring relative to APN station
Second session:
10min
10min
TELA
10min
Time duration between sessions – 60 min
2. Measuring relative to VRS
First session:
5km
10min
10min
10min
VRS1
10min
2. Measuring relative to VRS
Second session:
10min
10min
VRS1
10min
VRS2
VRS3
The distance
between two
VRSsessions
should be
at min
least 120m
Time duration
between
– 60
2. Measuring relative to VRS
Measured vectors:
VRS1
VRS2
VRS3
3. Measuring relative to base station
IGD05
► Connect the
base station to
IGD05 system
10km
90min
BASE
IGD05
3. Measuring relative to base station
► Measuring new
IGD05
control points
First Session:
10min
10min
10min
BASE
10min
IGD05
3. Measuring relative to base station
► Measuring new
ILGD05
control points
Second Session:
10min
10min
BASE
10min
ILGD05
Time duration between sessions – 60 min
4. Measuring Geodetic Network
Assume work with 3 receivers
IGD05
1
- Sessions of at least
10 min
- Each new point
should be measured
in two independent
sessions
2
3
4
IGD05
The Geodetic-Geodynamic
Network (G1)
►
Includes 160 points that
homogeneously cover the state of
Israel
►
The location of the points was
determined mainly according to
geological considerations
► The
points were built according
to very high technical specifications,
to ensure their geotechnical stability
The goal of the GeodeticGeodynamic Network
►
A potential geodetic network for
monitoring deformations in
primary and secondary known
faults
►
Serves as the major geodetic
control network of Israel
The Measurement Campaigns
►
During 1996 the G1 network was
measured for the first time (Blue circles
and Red squares)
► The second
campaign was held in
2002
► Only 100 points were measured
(Blue circles)
► 5 new points
were fixed in the
northern part of the network (Yellow
circles )
► 11 continuous
permanent GPS
stations were operated (Green triangles)
► the accuracy of the points is better
than 1cm
The G2 Network
►
Abut 1000 points that organized
in closed loops
►
Most of the points are BMs from
the Israeli vertical control network
► The
points were measured during
long period and not as one campaign
► The
network accuracy is not
homogeneous and not satisfactory
(~5cm)
Vertical Control
► Survey
of Israel (SOI) decided that the future
vertical control in Israel will be based on ellipsoidal
heights instead of orthometric heights
► SOI
will support and maintain spatial geodetic
network which will serve as horizontal and vertical
control
► The APN
and G1 will be used as basis for
ellipsoidal vertical control
► Undulation
model will be used to convert
ellipsoidal heights to orthometric heights