Enterprise Systems Architectures EGN 5620 Enterprise Systems Integration Professional MSEM

Download Report

Transcript Enterprise Systems Architectures EGN 5620 Enterprise Systems Integration Professional MSEM

Enterprise Systems
Architectures
EGN 5620
Enterprise Systems Integration
Professional MSEM
Fall, 2012
SAP Architecture Design
Types of Data: Organizational levels
 Organizational levels in
Accounting
 Client
 Company code
 Business area
 Controlling area
 Operating concern
 Organizational levels in
procurement
 Purchasing organization
 Purchasing group
 Plant
 Storage location
 Organizational
levels in
fulfillment (sales)
 Sales organizations
 Divisions
 Distribution channel
 Sales areas
 Shipping point
 Plant
 Storage location
 Organizational levels in PP
 Plant
 Work Center
 Storage location
 Shipping Point
SAP Enterprise Structure Example
Financial
Business Area – Bicycles BI##
CC US##
CoA US##
CC DE##
CA##
CoA DE##
GB##
AU## JP##
Chart of Accounts (global) GL##
CA North Am. NA##
CA Europe EU##
Operating Concern (global) GL##
Client GBI
CA Asia AS##
SAP Enterprise Structure Example
Procurement
DL##
Shipping Point
RM##
Storage Location
SD##
TG##
TG##
SF##
FG##
MI##
FG##
MI##
FG##
MI##
TO##
HD##
RM##
TG##
FG##
SF##
MI##
FG##
HH##
TG##
FG##
FG##
MI##
MI##
Central Purchasing Organization
Purchasing Org. US## CA##
PO DE##
(global) GL##
Purchasing Group North America
N##
DL##
Miami
MI##
CC US##
Client GBI
TG##
MI##
MI##
Dallas
PE##
S. Diego
SD##
Toronto
TO##
CA##
PGr Europe
N##
Heidelb. Hamburg
HD##
HH##
CC DE##
AU##
Asia
AS##
Perth
PE##
AU##
SAP Enterprise Structure Example
Sales
and Distribution
Distribution Channel
Wholesale WH
Distribution Channel
Internet IN
SO West
SO West
SO North
SO North
SO North
UW##
CW##
DN##
GN##
AN##
SO East
SO East
SO South
SO South
SO South
UE##
CE##
DS##
GS##
AS##
CC DE##
CC GB##
CC AU##
CC US##
CC CA##
Credit Control Area (global) GL##
Client GBI
PEN, Inc.
System Architecture Design
Company configuration
◦ Pen Inc. _ _ _US manufacturing Company
 Vermillion SD, US
◦ Facilities:
 One manufacturing plant with warehouse in
Vermillion (Plant)
◦ Work Center
◦ Storage Location
 10 for Trading and finished goods
 20 for Quality
 30 for Raw materials
◦ Shipping point
◦ Sales Organization
◦ Purchase Organization
The company to be configured
Cost
Center Standard Hierarchy
 ADMIN1
_ _ (Cost Center Group)
• Acct-Finance
• Administration
• Purchasing
• Information Tech
 Sales 1 _ _ (Cost Center Group)
• Sales
• Marketing
 Distribution-Production Cost Center 1 _ _ (Cost Center Group)
• Warehouse
• Production
Pen Inc. : The company
Products
◦ Trading Materials
 BPEN 1 _ _ (Barrel Pen)
 CPEN 1 _ _ (Click Pen)
 PPEN 1 _ _ (Premium Pen)
 Box 1 _ _ (Pen Box)
◦ Finished products
 EPEN 1 _ _ (Executive Pen)
 ESET 1 _ _ (Executive Set)
Pen Inc.: Key Processes
◦
◦
◦
◦
◦
◦
◦
◦
◦
◦
Fulfillment (sell)
Procurement (buy)
Production (make)
Material Planning (plan)
Financial Accounting (track)
Management Accounting (track)
Inventory and Warehouse Management (store)
Enterprise Asset Management (maintain)
Customer Service (service)
HCM (people)
Pen Inc. : The company
Information
system requirement
The IS of the Pen, Inc. will
◦ integrate and share all services for all business
functions in the Vermillion Office
◦ Centralize all ERP functions
◦ Achieve the primary business objectives:
 Reduce Costs
 Deliver Best-in-Class Technology to all divisions
Exercises: (Due 9/22/2012)
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
Review bill of materials for executive pen set
Display multi-level bill of materials for ESET
Review routing for assembly EPEN
Review Routing/BOM in the engineering workbench
Review work center and assigned capacity
Create forecast (consumption values) for finished products
Create material master for finished products
Create bill of material
Create finished products routing
Create product group
Create sales and operations plan
Transfer SOP to demand management
Review demand management
Run MPS with MRP
Review stock/requirement list