campate da 10 metri

Download Report

Transcript campate da 10 metri

5135.5
5135.5
5120
150
IPE 180
= sp.15
27520
= sp.15
= sp.15
IPE 180
250
15352
5294
26151
150
150
IPE 180
= sp.15
HEA 120
IPE 180
= sp.15
HEA 140
= sp.15
IPE 180
IPE 180
tubo 200x100x5
= sp.15
IPE 180
1236.5
= sp.15
= sp.15
= sp.15
= sp.15
15000
86.5
= sp.15
0.67%
HEA 300
1150
= sp.15
5228
5146
150
2329
Pend. 2
150
150
21.8%
HEA 100
150
Pend.
= sp.15
IPE 180
5228
= sp.15
IPE 180
= sp.15
= sp.15
150
5158.5
150
3270
3941
5228
IPE 180
27436
IPE 180
150
HEA 120
3427.5
2150
HEA 100
3284
= sp.15
284
5218
= sp.15
IPE 180
HEA 100
Omega dim.30X100X50 sp.3
4506.5
235
5066.5
150
HEA 100
1067
tubo 100x150x6.3
600
HEA 120
1067
= sp.15
= sp.15
tubo 100x180x6.3
5010
150
209
tubo 100x200x5
2627
piatto calandrato sp.12x80
150
Pend. 7.83%
100
5040
5156
tubo 100x200x5
1970
1310
1975
1363
150
= sp.15
tubo 80x120x6.3
4950
5135.5
150
80
0.5
R98
1200
600
150
piatto sp.12X80
5140
HEA 120
5753.5
730.5
5120
4600.5
tubo 100x150x6.3
5120
15600
HEA 100
5736
= sp.15
RETICOLARE
tipo -1-1A-1B-
RETICOLARE
tipo -2-2A-
RETICOLARE
tipo -3-3A-
RETICOLARE
tipo -4-4A-
RETICOLARE
tipo -5-5A-
RETICOLARE
tipo -6-6A-
RETICOLARE
tipo -7-7A-
RETICOLARE
tipo -8-8A-
VIERENDEEL
tipo -9-9A-
VIERENDEEL
tipo -10-10A-
26836
25610
TIPO -S1TIPO -S1A-
5248.5
150
150
150
150
150
150
150
= sp.15
5040
15600
4950
26210
5010
N.B. PER PART. NODI TUBOLARI VIERENDEEL VEDI DIS. S21-S22
HEA 140
TIPO -S1-
HEA 200
TIPO -S1A-
LE FINITURE SONO INDICATIVE
VEDERE TAVOLE ARCHITETTONICHE:
DA GAR31 A GAR42
PER ELEMENTI CALANDRATI
VEDI DIS. "GST62"
PIATTI DI RINFORZO Sp. 15 mm
SEZIONE INTERMEDIA TRA TRAVI PRINCIPALI BINATE
(CAMPATE DA 10 METRI))
TRATTAMENTO SUPERFICIALE: ZINCATURA A CALDO SECONDO UNI EN ISO 1461
STRUTTURA METALLICA
PROFILATI
S275 J0 UNI EN 10025-2
RETICOLARE
tipo -1-1A-1B-
RETICOLARE
tipo -2-2A-
RETICOLARE
tipo -3-3A-
RETICOLARE
tipo -4-4A-
RETICOLARE
tipo -5-5A-
RETICOLARE
tipo -6-6A-
RETICOLARE
tipo -7-7A-
RETICOLARE
tipo -8-8A-
VIERENDEEL
tipo -9-9A-
VIERENDEEL
tipo -10-10A-
NOTE GENERALI
TONDI
LAMIERE
TUBOLARI
S355 J0 UNI EN 10210
S275 J0 UNI EN 10210
S275 J0 UNI EN 10025-2
S275 J0 UNI EN 10025-2
UNIONI BULLONATE
BULLONERIA A NORMA UNI EN 15048 CLASSE 8.8
CLASSE 10.9
BARRE FILETTATE cl. 8.8 CON CERT. CONF. 3.1.B
UNI EN ISO 4016
UNI EN ISO 4016
SERRARE I BULLONI CON UNA FORZA DI PRECARICO F p,C=0.4 f tb ARES
26836
5120
730.5
1200
600
350
5228
0.67%
IPE 180
350 35
0
= sp.15
= sp.15
5294
= sp.15 (davanti)
= sp.15 (dietro)
TIPO -S2TIPO -S2A-
26151
5228
= sp.15
IPE 180
15352
HEA 300
IPE 180
15000
450
= sp.15
= sp.15
HEA 120
= sp.15
= sp.15
= sp.15
= sp.15
350 35
0
= sp.15
IPE 180
IPE 180
HEA 140
IPE 180
1236.5
Pend. 2
= sp.15
86.5
IPE 180
0
1150
= sp.15
350
5146
350 35
= sp.15
2329
= sp.15
= sp.15
21.8%
HEA 100
5228
IPE 180
4506.5
IPE 180
Pend.
3270
27436
IPE 180
HEA 120
27520
3941
= sp.15
= sp.15
4600.5
= sp.15 (dietro)
5158.5
350 35
0
HEA 120
3427.5
= sp.15
2150
1067
= sp.15 (davanti)
= sp.15
284
5218
= sp.15
IPE 180
HEA 100
tubo 100x200x5
IPE 180
235
DOVE NON E' POSSIBILE ESEGUIRE CORDONI D'ANGOLO
INTERVENIRE CON SALDATURE A COMPLETA PENETRAZIONE
PREVIA PREPARAZIONE DEGLI SPESSORI DA SALDARE.
5066.5
350
= sp.15
3284
tubo 100x150x6.3
TUTTE LE SALDATURE, SE NON DIVERSAMENTE INDICATO,
SONO CON CORDONE CONTINUO CON ALTEZZA DI GOLA NON INFERIORE A 7/10
DELLO SPESSORE MINIMO DELLE PARTI DA SALDARE
350
= sp.15
HEA 100
2627
tubo 100x180x6.3
= sp.15
Pend. 7.83%
209
= sp.15
= sp.15
1067
piatto calandrato sp.12x80
1970
tubo 100x200x5
UNIONI SALDATE
SALDATURE UNI EN ISO 4063
350 350
= sp.15
tubo 100x200x5
5010
600
HEA 100
tubo 100x200x5
100
5040
5156
= sp.15
tubo 80x120x6.3
4950
5135.5
350 350
1310
1975
80
0.5
R98
5140
5135.5
piatto sp.12X80
tubo 200x100x5
IPE 180
25610
5248.5
= sp.15
350
350
350 350
350 350
350
= sp.15
4950
26210
= sp.15
5040
15600
5010
N.B. PER PART. NODI TUBOLARI VIERENDEEL VEDI DIS. S21-S22
HEA 140
TIPO -S2-
HEA 200
TIPO -S2A-
PER ELEMENTI CALANDRATI
VEDI DIS. "GST62"
PIATTI DI RINFORZO Sp. 15 mm
SEZIONE INTERMEDIA TRA TRAVI PRINCIPALI BINATE
(CAMPATE DA 10 METRI))
91
40
HEA 180
40 50 50 40
30
1515
180
IPE 180
180
1363
5120
HEA 100
tubo 100x150x6.3
5120
HEA 120
5736
= sp.15
I COLLEGAMENTI CONTRASSEGNATI CON
SONO AD ATTRITO.
SERRARE I BULLONI CON UNA FORZA DI PRECARICO F p,C=0.7 f tb ARES
CON CONTROLLO DELLO STATO DI SERRAGGIO
15600
20
20
IPE180-6M12-CL.8.8
PROGETTO STRUTTURALE
SEZIONI INTERMEDIE TRA TRAVI PRINCIPALI BINATE
tipo-S1-S2- SU ZONE RETTILINEE (LUCI da 6 e 10m.)
PE
t